Previous terms
of clearance direct HUD to report to OMB on its evaluation of
utilizing automated and electronic collection methods at the end of
the current approval set to expire 8/31/2013. These terms of
clearance remain in effect.
Inventory as of this Action
Requested
Previously Approved
08/31/2013
36 Months From Approved
08/31/2013
4,130
0
4,130
79,330
0
79,330
0
0
0
This rule proposes to revise HUD's
energy audit requirements applicable to HUD's public housing
program for the purpose of clarifying such requirements, as well as
identifying energy-efficient measures that need to be addressed in
the audit and procedures for improved coordination with physical
needs assessments. In addition, the rule moves the energy audit
requirements to a different part of HUD's title of the Code of
Federal Regulations.
a. This is a revision of the
energy audit portion of an existing information collection (ICR
Reference No. 201005-2577-002). All PHAs have been required to
perform energy audits. The increased burden recognizes that the
proposed energy audit standards represent a higher standard than
currently exists, although many PHAs may already be performing at
that standard. The current standard is simply to meet whatever
state standard may exist; the proposed standards are more specific
in that they identify classifications of ecms that must be
considered, include review and evaluation of energy consumption and
costs, require a physical observation, require a simple payback
analysis for ecms, and expand the potential scope of an energy
audit to include consideration of green measures.
$101,680
No
No
No
No
No
Uncollected
Bruce Rieder 202 402-6330 ext.
6330 bruce_D._rieder@hud.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.