Application for ACEP

Safety Approval of Cargo Containers

1625-0024_ Revised_Instr_2011 (2)

Application for ACEP

OMB: 1625-0024

Document [docx]
Download: docx | pdf

U.S. DEPARTMENT OF

HOMELAND SECURITY

U.S. COAST GUARD

Safety Approval of Cargo Containers

OMB No. 1625-0024

Exp: 06/30/2011


Who must comply?

Owners and manufacturers of containers, and organizations that the Coast Guard delegates to act as an approval authority (AA).

What is this collection about?

This information is used by the Coast Guard (CG) to ensure that cargo containers are designed, manufactured and maintained in compliance with safety standards.

Where do I find the requirements for this information?

Title 49 CFR Parts 450-453 are available at—http://ecfr.gpoaccess.gov, select TITLE 49 – TRANSPORTATION, and follow to the respective parts.

When must information be submitted to the Coast Guard?

For an organization that seeks to become an AA, an application must be submitted to the CG in advance of that designation. For an owner or manufacturer that seeks approval of a new container design, an application must be submitted to the CG or an AA in advance of design approval. For an owner that seeks approval of a continuous examination program (ACEP), an application must be submitted to the CG in advance. For manufacturing or periodic examinations records, the information is not submitted to the CG; rather it is maintained by the container manufacturer/owner and made available for inspection by the CG.

How is the information submitted?

An application may be submitted by mail, fax or electronically submitted via e-mail. For manufacturing or periodic examination records, the information is not submitted to the CG; rather it is maintained by the container manufacturer/owner in any format—hard copy or electronic.

What happens when complete information is received?

For an AA applicant, the CG will review the information, determine if the organization is eligible for the designation, and reply in writing. For the approval of a new container design, the AA or CG will review the application for conformance with safety standards, and if the design is acceptable, complete the approval process with prototype testing. For an ACEP applicant, the CG will review the information, determine if the organization is eligible for the designation, and reply in writing. For manufacturing or periodic examination records, this information will be verified during normal CG inspections. No specific documentation will be issued by the CG.



























For additional information, contact--

Your local CG COTP or the CGHQ Vsl & Fac Op Stds Division.

CGHQ at—

Vessel and Facility Operating Standards Division (CG-5222)

U.S. Coast Guard Headquarters

2100 2nd Street, SW, Stop 7126

Washington, DC 20593-7126

202-372-1401

Kenneth.J.Doyle@uscg.mil

Or visit— http://www.uscg.mil/hq/cg5/cg522/cg5222/links.asp


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File Title1625-0093 Facilities Transferring Oil or Hazardous Materials in Bulk -- Letter of Intent and Operations Manual http://law
Authorsarabdeep.kaur
File Modified0000-00-00
File Created2021-02-01

© 2024 OMB.report | Privacy Policy