Proposed Rule for 10 CFR Part 52, U.S.
Advanced Boiling Water Reactor (ABWR) Aircraft Impact Design
Certification Amendment The NRC proposes to amend its regulations
to certify an amendment to the U.S. ABWR standard plant design to
comply with 10 CFR 50.150, "Aircraft Impact Assessment." This
action will allow applicants or licensees intending to construct
and operate a U.S. ABWR to comply with 10 CFR 50.150 by referencing
the amended DCR.
The overall burden for this
proposed rule will increase by 6 hours from 204,075 hours to
204,081 hours because of the following: (1) requiring combined
license applicants to report information demonstrating that an
entity other than the original applicant is qualified to supply the
U.S. ABWR certified design, or this amendment to the U.S. ABWR
certified design, unless the original applicant supplies the design
for the combined license applicant's use; (2) an applicant
referencing the U.S. ABWR design, that proposes to depart from the
information required by 10 CFR 52.47(a)(28) to be included in the
FSAR, to consider the effect of the changed AIA feature or
capability on the original 10 CFR 50.150(a) assessment and to
document how the modified design features and functional
capabilities continue to meet the assessment requirements in 10 CFR
50.150(a)(1); and (3) the applicant for this amendment to the U.S.
ABWR design, and any applicant of licensee referencing this
amendment, to maintain a copy of the aircraft impact assessment
performed to comply with the requirements of 10 CFR 50.150(a) for
the term of the certification or license (including any period of
renewal).
$0
No
No
No
No
No
Uncollected
Nanette Gilles 301 415-1180
nvg@nrc.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.