The RUS Electric System Operations and
Maintenance policy requires electric program distribution,
generation and transmission borrowers to expand a currently
established Emergency Restoration Plan (ERP). The ERP shall detail
how the borrower will restore its system in the event of a
system-wide outage resulting from a major natural or man made
disaster or other causes. The ERP shall include preventative
measures and procedures for emergency recovery from physical and
cyber attacks to the borrower's electric systems and core business,
and shall also address Homeland Security concerns.
US Code:
42
USC 5195c(e) Name of Law: USA Patriot Act of 2001
US Code: 42 USC 5195c(e) Name of Law: USA
Patriot Act
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.