May 11, 2011
Office of Management and Budget
Attention: Desk Officer for PHMSA
725 – 17th St., NW
Washington, DC 20503
RE: OMB Control No: 2137-05571
Dear Sir or Madam:
On behalf of the Institute of Makers of Explosives (IME), I am submitting comments on the
Pipeline and Hazardous Materials Safety Administration’s (PHMSA) revised information
collection request (ICR) pertaining to approvals for hazardous materials which was received by
the Office of Management and Budget (OMB) on January 20, 2011.
Interest of the IME
The Institute of Makers of Explosives (IME) is a nonprofit association founded in 1913 to
provide accurate information and comprehensive recommendations concerning the safety and
security of commercial explosive materials. IME represents U.S. manufacturers and distributors
of commercial explosive materials and oxidizers as well as other companies that provide related
services. The majority of IME members are “small businesses” as determined by the U.S. Small
Business Administration.
IME members manufacturer and transport the vast majority of explosive articles that, as a
result of new final rules, must successfully pass the so-called “Type 6(d) test” in order to
maintain a Division 1.4S classification. Only those Division 1.4 products with a compatibility
classification of “S” may be transported by passenger aircraft.
Background
PHMSA’s new Type 6(d) testing requirements stem from recommendations of the United
Nations Subcommittee of Experts on the Transport of Dangerous Goods.2 As such, it was
necessary that PHMSA adopt the new test and procedures so that U.S. businesses can continue
to supply the world market with these products.3 At the same time, it is incumbent on PHMSA
1
ICR Ref. No. 201012-2137-002.
th
UN Manual of Tests and Criteria, 5 revised edition.
3
PHMSA-2009-0126 (HM-215K), Harmonization with the United Nations Recommendations, International
Maritime Dangerous Goods Code, and the International Civil Aviation Organization Technical Instructions for
the Safe Transport of Dangerous Goods by Air, 76 FR 3308 (January 19, 2011).
_____________________________________________________________________________________________
1120 Nineteenth Street, NW, Suite 310, Washington, DC 20036, USA, (202) 429-9280, FAX (202) 293-2420
2
2
to assess the burden of these new requirements and to seek ways to minimize the burden of
the collection on respondents.4
As a result of the Type 6(d) test requirements, new burdens were imposed on manufacturers of
eight Division 1.4 explosive articles.5 First, all affected explosive articles with a current Division
1.4S classification had to either pass the Type 6(d) test or be reclassified to a compatibility
group other than “S” that does not allow for transport on passenger aircraft. Second,
manufacturers of new explosives articles with the eight affected UN numbers would need to
seek a classification from PHMSA that included the Type 6(d) test if the products would
eventually be offered for transport by passenger air.
Comments
In its final rule implementing the new UN rules, PHMSA estimated that annually four (4) percent
or 465 of the total 10,723 respondents to this ICR would be affected by this regulatory change.
Further, the agency estimates that the burden of the new requirement is five (5) hours per
response. Using an average hourly wage of approximately $25, PHMSA estimates that the
annual increase in the burden to process all approval applicants is only $58,125.6 We find these
burden estimates to fall far short of actual costs to the regulated community for the following
reasons:
•
According to PHMSA there are currently 2,247 such articles affected by the new U.N. rules.7
Even if the agency’s estimate is prospective, meaning that it expects to annually receive
applications for 465 new Division 1.4S explosive article classifications, the burden estimate does
not account for the 2,247 currently affected articles.
•
PHMSA’s simplest analysis to estimate the burden of the new requirements based, apparently,
on staff time to submit an application to PHMSA with the new testing data, is wholly
inadequate. Based on testing experience to date, the cost of compliance is currently $2,600 per
article, over 20 times the $125 estimate of the agency.
•
Based on our calculations of existing affected approvals, the cost of these requirements would
be $5,842,200. It the agency was correct that, on average, 465 new applications are submitted,
the annual cost to industry would be $1,290,000, not $58,125.
Given these costs, PHMSA should be eager to set up procedures minimize the burden of the
new Type 6(d) test on affected U.S. businesses. We have two suggestions.
First, PHMSA should ensure that any classification approval issued for a covered explosive
article that has passed the Type 6(d) test be notated that the approval is based on successful
4
5
6
7
Paperwork Reduction Act.
UN0323, UN0366, UN0441, UN0445, UN0455, UN0456, UN0460 and UN0500.
Supporting Statement, Approvals for Hazardous Materials, OMB Control No. 2137-0557, Office of the Chief
Information Officer, DOT, pages 6-7.
Source: http://prod-web1.phmsa.dot.gov/hazmat/regs/sp-a/approvals/serach, May 9, 2011, 1:30pm EDT.
3
completion of the 6(d) test. Since classification approvals do not expire, such approvals for
Division 1.4S explosives articles that were issued prior to the imposition of the new Type 6(d)
test may still be in use. It is important that any Division 1.4S classification approval based on
the Type 6(d) test have that fact affirmed on the approval so that our global trading partners
know that the classification is compliant with the latest U.N. requirements.8
Second, PHMSA should continue the practice of issuing “family” classification approvals.
Regulations require that new explosives receive a classification approval before they are
offered for transport. Prior to issuing the approval, the regulations require that explosives be
examined and tested by a laboratory approved by PHMSA. The testing criteria are based on
standards recognized worldwide, and typically cost tens of thousands of dollars. The expense
of this rigorous testing, both in terms of product sacrificed as well as the costs of the tests, is
borne by the applicant. Given that the testing is difficult and time consuming, explosive
products are often grouped into “families” when the size of the products, not design
characteristics or explosive specifications, differs. Testing is performed on the largest product
within the family and all other products in the family receive the classification of that largest
product. When the process is followed, there is no evidence of misclassification of explosive
products. Family approvals provide a safe, efficient means for industry to comply with the
costly and time-consuming explosives approval requirements and have been used safely for
more than two decades. Yet, without any evidence of abuse or risk to public safety, PHMSA has
announced that it is relooking at the merit of family approvals, and has asked some applicants
to break up long-standing family groups. This only adds to the costs and burdens on both the
applicant and the agency to prepare and process additional applications.
Conclusion
The current ICR for OMB Control No. 2137-0557 is due to expire June 30, 2011. We urge OMB
to use the opportunity presented by the agency’s request to renew this ICR to direct PHMSA to
ensure that classification approvals based on the Type 6(d) test be notated to that effect, and
that PHMSA continue to recognize family approvals that are not part-number specific. At
minimum, the costs of the new Type 6(d) testing requirements should be amended to better
align with real world experience.
Respectfully,
Cynthia Hilton
Cynthia Hilton
Executive Vice President
chilton@ime.org
8
We understand that PHMSA is making these notations on Division 1.4S classification approvals if
requested by the approval holder. PHMSA should be making the Type 6(d) test affirmation as a matter of course.