Download:
pdf |
pdfTECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION (TAPP) APPLICATION
OMB No. 0704-0392
OMB approval expires
The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, searching existing data sources,
gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of
information, including suggestions for reducing the burden, to the Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management
Division, 1155 Defense Pentagon, Washington, DC 20301-1155 (0704-0392). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to
any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION. RETURN COMPLETED FORM TO INSTALLATION LISTED IN SECTION I, BLOCK 1.
SECTION I - TAPP REQUEST SOURCE IDENTIFICATION DATA
1. INSTALLATION
2. SOURCE OF TAPP REQUEST (Name of Restoration Advisory Board (RAB) or Technical Review Committee (TRC)
3. CERTIFICATION OF MAJORITY REQUEST
5. RAB POINT OF CONTACT
a. NAME (Last, First, Middle Initial)
4. DATE OF REQUEST
(YYYYMMDD)
b. ADDRESS (Street, Apt. or Suite Number, City, State, ZIP Code)
c. TELEPHONE NUMBER (Include Area Code)
SECTION II - TAPP PROJECT DESCRIPTION
6. PROJECT TITLE
7. PROJECT TYPE (Data Interpretation, Training, etc.)
8. PROJECT PURPOSE AND DESCRIPTION (State anticipated goals of project and relate to increased understanding/participation in
restoration process at the installation. Include descriptions, locations, and timetables of products or services requested.)
D R A F T
9. STATEMENT OF ELIGIBILITY (Refer to eligibility criteria in S203.10 and S203.11 of TAPP rule. Note other sources that were considered
for this support and state reasons why these sources are inadequate.)
10. ADDITIONAL QUALIFICATIONS OR CRITERIA TO BE CONSIDERED (Additional qualifications (beyond those specified in S203.12) a
provider should demonstrate to perform the project to the satisfaction of the RAB/TRC. Attach separate statement, if necessary.)
SECTION III - INSTALLATION COMMANDER/DESIGNATED DECISION AUTHORITY APPROVAL
11. SIGNATURE
12. TITLE
APPROVED
13. DATE (YYYYMMDD)
NOT APPROVED
DD FORM 2749, 20100204 DRAFT
PREVIOUS EDITION IS OBSOLETE.
Adobe Professional 8.0
SECTION IV - PROPOSED PROVIDER DATA
14. PROPOSED PROVIDER
a. NAME
b. ADDRESS (Street, Apt. or Suite Number, City, State, ZIP Code)
c. TELEPHONE NUMBER (Include Area Code)
15. PROVIDER QUALIFICATIONS (Attach separate statement, if necessary. A statement of qualifications from the proposed technical
assistance provider will be acceptable.)
D R A F T
16. ALTERNATE PROPOSED PROVIDER (If known. Attach additional pages as required.)
a. NAME
b. ADDRESS (Street, Apt. or Suite Number, City, State, ZIP Code)
c. TELEPHONE NUMBER (Include Area Code)
17. ALTERNATE PROVIDER QUALIFICATIONS (Attach separate statement, if necessary. A statement of qualifications from the proposed
technical assistance provider will be acceptable.)
SECTION V - CONTRACTING OFFICE APPROVAL
18. SIGNATURE
APPROVED
19. TITLE
20. DATE (YYYYMMDD)
NOT APPROVED
DD FORM 2749 (BACK), 20100204 DRAFT
Reset
File Type | application/pdf |
File Title | DD Form 2749, Technical Assistance for Public Participation (TAPP) Application, 20100204 draft |
Author | WHS/ESD/IMD |
File Modified | 2010-02-04 |
File Created | 2010-02-04 |