Download:
pdf |
pdfAttachment H
Work Sheet used to Calculate EPA Labor Costs
This attachment is available as part of the electronic docket EPA-HQ-OPP-2009-0884 and is
part of the ICR’s Supporting Statement
NAICS: 999100
Federal Executive Branch
Labor Category:
Formula
1
Unloaded Hourly Rate
=W
Benefits Percentage2
Lb = B/W
Benefits per hour
Loaded Hourly Rate
B = W*Lb
Wb = W + B =
W(1+Lb)
Overhead Percentage3
Lo = OH/Wb
Overhead per hour
Fully Loaded Hourly
Rate
OH = Wb*Lo
Wf = Wb + OH
= W + B + OH
Managerial
$49.96
Technical
$33.25
Clerical
$19.14
44%
44%
44%
$21.75
$71.71
$14.47
$47.72
$8.33
$27.47
50%
50%
50%
$35.85
$107.56
$23.86
$71.58
$13.74
$41.21
1. Data Source: BLS http://www.bls.gov/oes/current/naics4_999100.htm May 2008 data
NAICS 999100 - Federal Executive Branch
Standard Occupational Codes:
Management: 11-0000, Management Occupations
Technical:
19-0000, Life, Physical, and Social Science Occupations
Clerical:
43-0000, Office and Administrative Support Occupations
2. Fringe benefits/wage per hour.
3. U. S. Environmental Protection Agency, EPA Air Pollution Control Cost Manual, Sixth
Edition, EPA-452-02-001, January 2002, pg. 2-34. The loading for indirect costs is within the
range of 20-70% of the load labor rate (wage + benefits) suggested in EPA guidance.
File Type | application/pdf |
File Title | Microsoft Word - Attachment H_Methodology for Estimating OPP ICR Wage Rates for EPA.doc |
Author | lnegash |
File Modified | 2010-07-31 |
File Created | 2010-07-31 |