Old form with changes highlighted

FF 086-0-27D formerly 81-89D changes highlighted.docx

Revision to National Flood Insurance Program Maps: Application Forms and Instructions for LOMRs and CLOMRs

Old form with changes highlighted

OMB: 1660-0016

Document [docx]
Download: docx | pdf

U.S. DEPARTMENT OF HOMELAND SECURITY - FEDERAL EMERGENCY MANAGEMENT AGENCY

COASTAL STRUCTURES FORM

O.M.B No. 1660-0016

Expires: 12/31/20130


PAPERWORK REDUCTION ACT

Public reporting burden for this form is estimated to average 1 hour per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless a valid OMB control number appears in the upper right corner of this form. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, U.S. Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington DC 20472, Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address.


Flooding Source:      

Note: Fill out one form for each flooding source studied

A. BACKGROUND


1. Name of structure (if applicable):      


2. Structure location:      


3. Type of structure (check one):


Levee/Floodwall* Anchored Bulkhead Revetment Gravity Seawall


Breakwater Pile supported seawall Other:      


*Note: If the coastal structure is a levee/floodwall, complete Section E of Form 3 (Riverine Structures Form).
The remainder of this form does not need to be completed.


4. Material structure is composed of (check all that apply):


Stone Earthen fill Concrete Steel


Sand Other      


  1. The structure is (check one):


New or proposed Existing Modification of existing structure


Replacement structure of the same size and design as what was previously at the site


Describe in detail the existing structure and/or modifications being made to the structure and the purpose of the modifications:


     


If existing, please include date of construction:      


6. Copies of certified "as-built" plans are are not attached. Attach all design analyses that apply.


If "as-built" plans are not available for submittal, please explain why and attach a sketch with general structure dimensions including: face slope, height, length, depth, and toe elevation referenced to the appropriate datum (e.g. NGVD 1929, NAVD 1988, etc.).


7. Has a Federal agency with responsibility for the design of coastal flood protection structures designed or certified that the structures have been adequately designed and constructed to provide protection against the 1%-annual-chance event?


Yes No


If Yes, specify the name of the agency and dates of project completion and certification.


     


If Yes, then no other sections of this form need to be completed.


  1. Has aAn Operation & Maintenance Plan has been provided.(required for all coastal structures)? Yes No (If no, please provide an explanation.)



B. DESIGN CRITERIA


1. Design Parameters


a. Were physical parameters representing the 1%-annual-chance event or greater used to design the coastal flood protection structure?


Yes No


b. The number of design water levels that were evaluated       (number) range from the mean low water elevation of
      feet to the 1%-annual-chance stillwater surge elevation of       feet. The critical water level is       feet. The datum that these elevations are referenced to is       (e.g.: NGVD 1929, NAVD 1988, etc.).


Attach an explanation specifying which water levels and associated wave heights and periods were analyzed.


  1. Were breaking wave forces used to design the structure?


Yes No If No, attach an explanation why they were not used for design.


2. Settlement


a. What is the expected settlement rate at the site of the structure?      


Please attach a settlement analysis.


3. Freeboard


a. Does the structure have 1 foot of freeboard above the height of the 1%-annual-chance wave-height elevation or maximum wave runup (whichever is greater)?


Yes No


  1. Does the structure have freeboard of at least 2 feet above the 1% annual chance stillwater surge elevation?


Yes No


4. Toe Protection


Specify the type of toe protection:      


If no toe protection is provided, provide analysis of scour potential and attach an evaluation of structural stability performed with potential scour at the toe.


5. Backfill Protection


Will the structure be overtopped during the 1%-annual-chance event? Yes No


If the structure will be overtopped, attach an explanation of what measures are used to prevent the loss of backfill from rundown over the structure, drainage landward, under or laterally around the ends of the structure, or through seams and drainage openings in the structure.


6. Structural Stability - Minimum Water Level


a. For coastal revetments, was a geotechnical analysis of potential failure in the landward direction by rotational gravity slip performed for maximum loads associated with minimum seaward water level, no wave action, saturated soil conditions behind the structure, and maximum toe scour?


Yes No


  1. For gravity and pile-supported seawalls, were engineering analyses of landward sliding, landward overturning, and of foundation adequacy using maximum pressures developed in the sliding and overturning calculations performed?


Yes No


  1. For anchored bulkheads, were engineering analyses performed for shear failure, moment failure, and adequacy of tiebacks and deadmen to resist loading under low-water conditions?


Yes No


B. DESIGN CRITERIA (CONTINUED)


7. Structural Stability - Critical Water Level (Note: All structures must be designed to resist the maximum loads associated with the

critical water level to be credited as providing protection from the 1% annual chance event.)


a. For coastal revetments were geotechnical analyses performed investigating the potential failure in the seaward direction by rotational gravity slip or foundation failure due to inadequate bearing strength?


Yes No


b. For revetments, were engineering analyses of rock, riprap, or armor blocks' stability under wave action or uplift forces on the rock, riprap, or armor blocks performed?


Yes No


  1. Are the rocks graded?


Yes No


  1. Are soil or geotextile filters being used in the design?


Yes No


  1. For gravity and pile supported seawalls, were engineering analyses of landward sliding, landward overturning, and foundation

adequacy performed?


Yes No


f. For anchored bulkheads, were engineering analyses of shear and moment failure performed using "shock" pressures?


Yes No


For all analyses marked “No” above for the appropriate type of structure, please attach an explanation why the analyses were not performed.


8. Material Adequacy


The design life of the structure given the existing conditions at the structure site is       years.


9. Ice and Impact Alignment


  1. Will the structure be subjected to ice forces?


Yes No


If Yes, attach impact analysis and design details for such forces.


  1. Will the structure be subjected to impact forces from boats, ships, or large debris?


Yes No


If Yes, attach impact analysis.


10. Structure Plan Alignment


The structure is (check one):


Isolated Part of a continuous structure with redundant return walls at frequent intervals.


Please provide a map showing the location of the structure and any natural land features that shelter the

structure from wave actions.


C. ADVERSE IMPACT EVALUATION


If the structure is new, proposed, or modified, will the structure impact flooding and erosion for areas adjacent to the structure?


Yes No


If Yes, attach an explanation.


D. COMMUNITY AND/OR STATE REVIEW


Has the design, maintenance, and impact of the structure been reviewed and approved by the community, and any Federal, State, or local agencies having jurisdiction over flood control and coastal construction activities in the area the structure impacts?


Yes No


If Yes, attach a list of agencies who have reviewed and approved the project.


If No, attach an explanation why review and approval by the appropriate community or agency has not been obtained.


E. CERTIFICATION







Seal (optional)


As a Professional Engineer, I certify that the above structures will withstand all hydraulic and wave forces associated with the 1% annual chance flood without significant structural degradation. All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001.



Certifier’s Name:      

License No.:       Exp. Date:      

Company Name:      

Telephone No.:       Fax. No.:      


Signature: ________________________________ Date:      



DHS - FEMA Form 81-89D, DECMAR 10 07 Coastal Structures Form MT-2 Form 5 Page 1 of 4

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleFEDERAL EMERGENCY MANAGEMENT AGENCY
File Modified0000-00-00
File Created2021-02-01

© 2024 OMB.report | Privacy Policy