Attachment E
Work Sheets used to Calculate Registrant Labor Costs
This attachment is available as part of the electronic docket EPA-HQ-OPP-2009-0887 and is part of the ICR’s Supporting Statement.
NAICS: 325300
Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing
Labor Category: |
Formula |
Managerial |
Technical |
Clerical |
Unloaded Hourly Rate1 |
= W |
$51.01 |
$28.05 |
$16.67 |
Benefits Percentage2 |
Lb = B/W |
44% |
44% |
44% |
Benefits per hour |
B = W*Lb |
$22.20 |
$12.21 |
$7.26 |
Loaded Hourly Rate |
Wb = W + B = W(1+Lb) |
$73.21 |
$40.26 |
$23.93 |
Overhead Percentage3 |
Lo = OH/Wb |
50% |
50% |
50% |
Overhead per hour |
OH = Wb*Lo |
$36.61 |
$20.13 |
$11.96 |
Fully Loaded Hourly Rate |
Wf = Wb + OH |
$109.82 |
$60.39 |
$35.89 |
1. Data Source: BLS http://www.bls.gov/oes/current/naics4_325300.htm May 2008 data
NAICS 325300 - Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing
Standard Occupational Codes:
Management: 11-0000, Management Occupations
Technical: 19-0000, Life, Physical, and Social Science Occupations
Clerical: 43-0000, Office and Administrative Support Occupations
2. Fringe benefits/wage per hour.
3. U. S. Environmental Protection Agency, EPA Air Pollution Control Cost Manual, Sixth Edition, EPA-452-02-001, January 2002, pg. 2-34. The loading for indirect costs is within the range of 20-70% of the load labor rate (wage + benefits) suggested in EPA guidance.
Attachment E.1
Work Sheets used to Calculate EPA and Federal Government Labor Costs
This attachment is available as part of the electronic docket EPA-HQ-OPP-2009-0887 and is part of the ICR’s Supporting Statement
NAICS: 999100
Federal Executive Branch
Labor Category: |
Formula |
Managerial |
Technical |
Clerical |
Unloaded Hourly Rate1 |
= W |
$49.96 |
$33.25 |
$19.14 |
Benefits Percentage2 |
Lb = B/W |
44% |
44% |
44% |
Benefits per hour |
B = W*Lb |
$21.75 |
$14.47 |
$8.33 |
Loaded Hourly Rate |
Wb = W + B = W(1+Lb) |
$71.71 |
$47.72 |
$27.47 |
Overhead Percentage3 |
Lo = OH/Wb |
50% |
50% |
50% |
Overhead per hour |
OH = Wb*Lo |
$35.85 |
$23.86 |
$13.74 |
Fully Loaded Hourly Rate |
Wf = Wb + OH |
$107.56 |
$71.58 |
$41.21 |
1. Data Source: BLS http://www.bls.gov/oes/current/naics4_999100.htm May 2008 data
NAICS 999100 - Federal Executive Branch
Standard Occupational Codes:
Management: 11-0000, Management Occupations
Technical: 19-0000, Life, Physical, and Social Science Occupations
Clerical: 43-0000, Office and Administrative Support Occupations
2. Fringe benefits/wage per hour.
3. U. S. Environmental Protection Agency, EPA Air Pollution Control Cost Manual, Sixth Edition, EPA-452-02-001, January 2002, pg. 2-34. The loading for indirect costs is within the range of 20-70% of the load labor rate (wage + benefits) suggested in EPA guidance.
p.
File Type | application/msword |
File Title | SUPPORTING STATEMENT FOR |
Author | rosalind |
Last Modified By | Scott Drewes |
File Modified | 2010-06-03 |
File Created | 2010-06-03 |