1064

1064.16 Tables.xls

NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR part 60, subpart MM)(Renewal)

1064

OMB: 2060-0034

Document [xlsx]
Download: xlsx | pdf

Overview

table 1
table 2


Sheet 1: table 1

TABLE 1

Annual Respondent Burden and Cost -










NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM)



(Renewal)














REPORTING/RECORDKEEPING REQUIREMENT (A)
Respondent Hours per Occurence (Technical hours)
(B)
Number of Occurences per Respondent per Year
(C)
Hours per Respondent per Year
(C=A x B)
(D)
Number of Respondents per Year
(E)
Technical Hours per Year
@ $98.20
(E=C x D)e
(F)
Management Hours per Year
@ $114.49
(F= E x 0.05)e
(G)
Clerical Hours per Year
@ $48.53
(G= E x 0.1)e
Total Labor
Costs
per Year
1. APPLICATIONSa


17.4 1 17.4 2 34.8 1.7 3.5 $3,783.56
2. SURVEY AND STUDIES


116.5 1 116.5 2 233.0 11.7 23.3 $25,349.88
3. REPORTING REQUIREMENTS











A. Read Instructionsb

8.7 1 8.7 52 452.2 22.6 45.2 $49,186.34

B. Required Activities











Initial performance testc
2434.8 1 2434.8 2 4869.6 243.5 487.0 $529,699.00


Demonstration of CMS
N/A N/A N/A N/A N/A

N/A


Repeat performance testc, d
573.9 1 573.9 0.4 229.6 11.5 23.0 $24,971.52

C. Create Information

------------------------Included in 3b----------------------------

D. Gather Existing Information

------------------------Included in 3e----------------------------

E. Write Report











Notification of construction/reconstruction
1.7 1 1.7 2 3.5 0.2 0.3 $378.36


Notification of actual startup
1.7 1 1.7 2 3.5 0.2 0.3 $378.36


Notification of initial performance test
35.7 1 35.7 2 71.3 3.6 7.1 $7,756.31


Report of performance test
------------------------Included in 3b----------------------------


Excess Emission Reports











VOC Emission Reports 8.7 4 34.8 52 1808.7 90.4 180.9 $196,745.34



Temperature Reports 26.1 2 52.2 52 2713.0 135.7 271.3 $295,118.01




Total Reporting Hours by Labor Category 4,600 230 460

TOTAL REPORTING BURDEN






5,290 Hours $500,376
4. RECORDKEEPING REQUIREMENTS











A. Read Instructions

8.7 1 8.7 52 452.2 22.6 45.2 $49,186.34

B.  Plan Activities

17.4 1 17.4 52 904.3 45.2 90.4 $98,372.67

C. Implement Activities











Monthly performance test
1669.6 1 1669.6 52 86817.4 4340.9 8681.7 $9,443,776.42

D.  Develop Record System

4347.8 1 4347.8 2 8695.7 434.8 869.6 $945,891.07

E.  Time to Enter Information











Records of Temperature
417.4 1 417.4 52 21704.3 1085.2 2170.4 $2,360,944.11

F.   Train Personnel

34.8 1 34.8 52 1808.7 90.4 180.9 $196,745.34

G.  Audits

17.4 1 17.4 52 904.3 45.2 90.4 $98,372.67
5. EQUIPMENT & ANALYTICAL EVALUATION EXPENSE











A. Continuous Monitoring & Evaluation

34.8 1 34.8 35 1217.4 60.9 121.7 $132,424.75

B. Routine Testing and Maintenance

52.2 1 52.2 35 1826.1 91.3 182.6 $198,637.12

C. Systems to Manage Data

34.8 1 34.8 35 1217.4 60.9 121.7 $132,424.75




Total Recordkeeping Hours by Labor Category 131,367 6,568 13,137

TOTAL RECORDKEEPING BURDEN






151,072 Hours $14,289,766

TOTAL ANNUAL BURDEN






156,362 Hours $14,790,142












Assumptions










a. Number of new facilities (per year) =

2






b. Number of existing affected facilities (per year) =

52






c. It is assumed the EPA Reference Method 24 test performed on the coatings used by the respondents is generally done by the coatings manufacturers, who provide the test results to the respondents. It is further assumed that the coatings manufacturers routinely perform an EPA Method 24 analysis on their coatings as a quality control measure, so there will be no additional cost incurred by the coatings manufacturers. It is assumed that 0.4 respondents must generate Method 24 data for a coating because they modify the coatings. This situation is assumed to occur once per year.


d. Rate of failed performance tests =

20%






e. Technical labor rate (Bureau of Labor Statistics) =

$98.20







Managerial Labor rate (Bureau of Labor Statistics) =

$114.49







Clerical Labor rate (Bureau of Labor Statistics) =

$48.53







Sheet 2: table 2

TABLE 2
Annual Agency Burden and Cost -









NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM)




(Renewal)












REPORTING/RECORDKEEPING REQUIREMENT (A)
EPA Hours per Occurence (Technical hours)
(B)
Number of Occurences per Plant per Year
(C)
EPA Hours per Year
(C=A x B)
(D) Plants per Year (E)
Technical Hours per Year
@ $46.21
(E=C x D)c
(F)
Management Hours per Year
@ $62.27
(F= E x 0.05)c
(G)
Clerical Hours per Year
@ $25.01
(G= E x 0.1)c

Costs per Year
INITIAL PERFORMANCE TESTS










New Planta
20.9 1.2 25.0 2 50.1 2.5 5.0 $2,595.73
REPORT REVIEW










New Plant









Notification of construction 1.7 1 1.7 2 3.5 0.2 0.3 $180.26

Notification of initial startup 0.4 1 0.4 2 0.9 0.04 0.1 $45.06

Notification of actual startup 0.4 1 0.4 2 0.9 0.04 0.1 $45.06

Notification of initial performance testb 0.4 1.2 0.5 2 1.0 0.1 0.1 $54.08

Review test resultsb 7.0 1.2 8.3 2 16.7 0.8 1.7 $865.24

Existing Plant









VOC emission reports 1.7 4 7.0 52 361.7 18.1 36.2 $18,746.94

Temperature reports 1.7 2 3.5 52 180.9 9.0 18.1 $9,373.47
TOTAL ANNUAL HOURS





616 31 62
SALARY BURDEN (per year)








$31,905.86
ANNUAL TRAVEL EXPENSESd










(1 person x 5 plants/year x 3 d/plant x $75 per diem) + ($350 round trip/plant x 5 plant/yr) =






$2,875
TOTAL ANNUAL BURDEN





708
Hours $34,781











Assumptions









a. Number of new plants (per year)

2





b. Rate of failed performance tests

20%





c. EPA technical labor rate (GS-13 Step 1 x 1.6 for overhead)

$46.21






EPA managerial labor rate (GS-12 Step 5 x 1.6 for overhead)

$62.27






EPA clerical labor rate (GS-6 Step 3 x 1.6 for overhead)

$25.01





d. Round trip airfare to visit plant

$350





File Typeapplication/vnd.ms-excel
AuthorEastern Research Group
Last Modified Byctsuser
File Modified2010-04-21
File Created2010-04-02

© 2024 OMB.report | Privacy Policy