TABLE 1 | Annual Respondent Burden and Cost - | ||||||||||
NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM) | (Renewal) | ||||||||||
REPORTING/RECORDKEEPING REQUIREMENT | (A) Respondent Hours per Occurence (Technical hours) |
(B) Number of Occurences per Respondent per Year |
(C) Hours per Respondent per Year (C=A x B) |
(D) Number of Respondents per Year |
(E) Technical Hours per Year @ $98.20 (E=C x D)e |
(F) Management Hours per Year @ $114.49 (F= E x 0.05)e |
(G) Clerical Hours per Year @ $48.53 (G= E x 0.1)e |
Total Labor Costs per Year |
|||
1. APPLICATIONSa | 17.4 | 1 | 17.4 | 2 | 34.8 | 1.7 | 3.5 | $3,783.56 | |||
2. SURVEY AND STUDIES | 116.5 | 1 | 116.5 | 2 | 233.0 | 11.7 | 23.3 | $25,349.88 | |||
3. REPORTING REQUIREMENTS | |||||||||||
A. Read Instructionsb | 8.7 | 1 | 8.7 | 52 | 452.2 | 22.6 | 45.2 | $49,186.34 | |||
B. Required Activities | |||||||||||
Initial performance testc | 2434.8 | 1 | 2434.8 | 2 | 4869.6 | 243.5 | 487.0 | $529,699.00 | |||
Demonstration of CMS | N/A | N/A | N/A | N/A | N/A | N/A | |||||
Repeat performance testc, d | 573.9 | 1 | 573.9 | 0.4 | 229.6 | 11.5 | 23.0 | $24,971.52 | |||
C. Create Information | ------------------------Included in 3b---------------------------- | ||||||||||
D. Gather Existing Information | ------------------------Included in 3e---------------------------- | ||||||||||
E. Write Report | |||||||||||
Notification of construction/reconstruction | 1.7 | 1 | 1.7 | 2 | 3.5 | 0.2 | 0.3 | $378.36 | |||
Notification of actual startup | 1.7 | 1 | 1.7 | 2 | 3.5 | 0.2 | 0.3 | $378.36 | |||
Notification of initial performance test | 35.7 | 1 | 35.7 | 2 | 71.3 | 3.6 | 7.1 | $7,756.31 | |||
Report of performance test | ------------------------Included in 3b---------------------------- | ||||||||||
Excess Emission Reports | |||||||||||
VOC Emission Reports | 8.7 | 4 | 34.8 | 52 | 1808.7 | 90.4 | 180.9 | $196,745.34 | |||
Temperature Reports | 26.1 | 2 | 52.2 | 52 | 2713.0 | 135.7 | 271.3 | $295,118.01 | |||
Total Reporting Hours by Labor Category | 4,600 | 230 | 460 | ||||||||
TOTAL REPORTING BURDEN | 5,290 | Hours | $500,376 | ||||||||
4. RECORDKEEPING REQUIREMENTS | |||||||||||
A. Read Instructions | 8.7 | 1 | 8.7 | 52 | 452.2 | 22.6 | 45.2 | $49,186.34 | |||
B. Plan Activities | 17.4 | 1 | 17.4 | 52 | 904.3 | 45.2 | 90.4 | $98,372.67 | |||
C. Implement Activities | |||||||||||
Monthly performance test | 1669.6 | 1 | 1669.6 | 52 | 86817.4 | 4340.9 | 8681.7 | $9,443,776.42 | |||
D. Develop Record System | 4347.8 | 1 | 4347.8 | 2 | 8695.7 | 434.8 | 869.6 | $945,891.07 | |||
E. Time to Enter Information | |||||||||||
Records of Temperature | 417.4 | 1 | 417.4 | 52 | 21704.3 | 1085.2 | 2170.4 | $2,360,944.11 | |||
F. Train Personnel | 34.8 | 1 | 34.8 | 52 | 1808.7 | 90.4 | 180.9 | $196,745.34 | |||
G. Audits | 17.4 | 1 | 17.4 | 52 | 904.3 | 45.2 | 90.4 | $98,372.67 | |||
5. EQUIPMENT & ANALYTICAL EVALUATION EXPENSE | |||||||||||
A. Continuous Monitoring & Evaluation | 34.8 | 1 | 34.8 | 35 | 1217.4 | 60.9 | 121.7 | $132,424.75 | |||
B. Routine Testing and Maintenance | 52.2 | 1 | 52.2 | 35 | 1826.1 | 91.3 | 182.6 | $198,637.12 | |||
C. Systems to Manage Data | 34.8 | 1 | 34.8 | 35 | 1217.4 | 60.9 | 121.7 | $132,424.75 | |||
Total Recordkeeping Hours by Labor Category | 131,367 | 6,568 | 13,137 | ||||||||
TOTAL RECORDKEEPING BURDEN | 151,072 | Hours | $14,289,766 | ||||||||
TOTAL ANNUAL BURDEN | 156,362 | Hours | $14,790,142 | ||||||||
Assumptions | |||||||||||
a. | Number of new facilities (per year) = | 2 | |||||||||
b. | Number of existing affected facilities (per year) = | 52 | |||||||||
c. | It is assumed the EPA Reference Method 24 test performed on the coatings used by the respondents is generally done by the coatings manufacturers, who provide the test results to the respondents. It is further assumed that the coatings manufacturers routinely perform an EPA Method 24 analysis on their coatings as a quality control measure, so there will be no additional cost incurred by the coatings manufacturers. It is assumed that 0.4 respondents must generate Method 24 data for a coating because they modify the coatings. This situation is assumed to occur once per year. | ||||||||||
d. | Rate of failed performance tests = | 20% | |||||||||
e. | Technical labor rate (Bureau of Labor Statistics) = | $98.20 | |||||||||
Managerial Labor rate (Bureau of Labor Statistics) = | $114.49 | ||||||||||
Clerical Labor rate (Bureau of Labor Statistics) = | $48.53 |
TABLE 2 | Annual Agency Burden and Cost - | |||||||||
NSPS for Automobile and Light Duty Truck Surface Coating Operations (40 CFR Part 60, Subpart MM) | (Renewal) | |||||||||
REPORTING/RECORDKEEPING REQUIREMENT | (A) EPA Hours per Occurence (Technical hours) |
(B) Number of Occurences per Plant per Year |
(C) EPA Hours per Year (C=A x B) |
(D) Plants per Year | (E) Technical Hours per Year @ $46.21 (E=C x D)c |
(F) Management Hours per Year @ $62.27 (F= E x 0.05)c |
(G) Clerical Hours per Year @ $25.01 (G= E x 0.1)c |
Costs per Year |
||
INITIAL PERFORMANCE TESTS | ||||||||||
New Planta | 20.9 | 1.2 | 25.0 | 2 | 50.1 | 2.5 | 5.0 | $2,595.73 | ||
REPORT REVIEW | ||||||||||
New Plant | ||||||||||
Notification of construction | 1.7 | 1 | 1.7 | 2 | 3.5 | 0.2 | 0.3 | $180.26 | ||
Notification of initial startup | 0.4 | 1 | 0.4 | 2 | 0.9 | 0.04 | 0.1 | $45.06 | ||
Notification of actual startup | 0.4 | 1 | 0.4 | 2 | 0.9 | 0.04 | 0.1 | $45.06 | ||
Notification of initial performance testb | 0.4 | 1.2 | 0.5 | 2 | 1.0 | 0.1 | 0.1 | $54.08 | ||
Review test resultsb | 7.0 | 1.2 | 8.3 | 2 | 16.7 | 0.8 | 1.7 | $865.24 | ||
Existing Plant | ||||||||||
VOC emission reports | 1.7 | 4 | 7.0 | 52 | 361.7 | 18.1 | 36.2 | $18,746.94 | ||
Temperature reports | 1.7 | 2 | 3.5 | 52 | 180.9 | 9.0 | 18.1 | $9,373.47 | ||
TOTAL ANNUAL HOURS | 616 | 31 | 62 | |||||||
SALARY BURDEN (per year) | $31,905.86 | |||||||||
ANNUAL TRAVEL EXPENSESd | ||||||||||
(1 person x 5 plants/year x 3 d/plant x $75 per diem) + ($350 round trip/plant x 5 plant/yr) = | $2,875 | |||||||||
TOTAL ANNUAL BURDEN | 708 | Hours | $34,781 | |||||||
Assumptions | ||||||||||
a. | Number of new plants (per year) | 2 | ||||||||
b. | Rate of failed performance tests | 20% | ||||||||
c. | EPA technical labor rate (GS-13 Step 1 x 1.6 for overhead) | $46.21 | ||||||||
EPA managerial labor rate (GS-12 Step 5 x 1.6 for overhead) | $62.27 | |||||||||
EPA clerical labor rate (GS-6 Step 3 x 1.6 for overhead) | $25.01 | |||||||||
d. | Round trip airfare to visit plant | $350 |