SF-1423 Inventory Verification Survey

Government Property - Sections 45.606-1; 45-606-3; 52.245-1(f)(1)(ii); 52.245-1(f)(1)(iii), etc

SF-1423 Inventory Verification Survey

Government Property - Sections 45.606-1; 45-606-3; 52.245-1(f)(1)(ii); 52.245-1(f)(1)(iii), etc

OMB: 9000-0075

Document [pdf]
Download: pdf | pdf
INVENTORY VERIFICATION SURVEY

DATE

(See FAR 45.602-1(b)(1))
SECTION I - GENERAL

1. FROM: (Include ZIP Code)

2. TO: (Include ZIP Code)

3. CONTRACT NUMBER AND TYPE

4. CONTRACTOR/SUBCONTRACTOR

5A. SCHEDULES OF INVENTORY TO BE INSPECTED AND VERIFIED
REFERENCE NUMBER

PAGES
START NO.

END NO.

OMB Control Number: 9000-0075
Expiration Date: "DATE"

5B. PLANT CLEARANCE CASE NUMBER/DOCUMENT NUMBER

AMOUNT ($)

SECTION II - TECHNICAL VERIFICATION
YES NO
* 12. ARE THE WEIGHTS OF THE ITEMS APPROXIMATELY CORRECT?
6. IS PROPERTY LISTED ON THE INVENTORY DISPOSAL SCHEDULES
ON HAND AND IN THE QUANTITIES INDICATED?

*

7. IS THE PROPERTY CORRECTLY DESCRIBED ON THE INVENTORY
DISPOSAL SCHEDULES?
8. IS THE PROPERTY SEGREGATED OR ADEQUATELY PROTECTED?
9. IS THE PROPERTY PROPERLY TAGGED?
10. ARE THE CONDITION CODES ACCURATE?

IF WEIGHTS ARE NOT SHOWN, GIVE ESTIMATE OF WEIGHT BY
BASIC MATERIAL CONTENT:

*

13. DO THE ITEMS APPEAR TO HAVE COMMERCIAL VALUE OTHER
THAN SCRAP?

*

14. DID CONTRACTOR MAKE REASONABLE EFFORTS TO RETURN
THE PROPERTY?

*

15. DO ANY ITEMS REQUIRE DEMILITARIZATION OR SPECIAL
PROCESSING (sensitive items) ?

*

11. IS THE PROPERTY CLASSIFICATION CORRECTLY IDENTIFIED?

16. ARE COMMON ITEMS INCLUDED ON THE INVENTORY DISPOSAL
SCHEDULE?

SECTION III - TERMINATION INVENTORY
COMPLETION OF THIS SECTION
IS
IS NOT REQUIRED (Requester, check one)
YES NO 20. DOES THE INVENTORY INCLUDE REJECTS? IF YES, EXPLAIN
SPECIFIC LINE ITEM ENTRIES. OBTAIN FROM CONTRACTOR
17. DID WORK STOP PROMPTLY UPON RECEIPT OF THE TERM*

ESTIMATED COST OF REWORKING REJECTS ON SPECIFIC LINE
ITEM BASIS.

INATION NOTICE?

DATE OF NOTICE:
18a. DO THE QUANTITIES OF MATERIAL EXCEED THE AMOUNTS
THAT WOULD HAVE BEEN REQUIRED TO COMPLETE THE
TERMINATED PORTION OF THE CONTRACT?

*

*
*
*
*

YES NO
*

21a. HAVE COMPLETED ARTICLES BEEN INSPECTED AS TO QUALITY
AND CONFORMANCE TO SPECIFICATIONS?

*
*

b. CAN THE ITEMS OF TERMINATION INVENTORY BE USED ON
THE CONTINUING PORTION OF THE CONTRACT?
19. ARE ALL ITEMS AND QUANTITIES ALLOCABLE TO THE TERMINATION PORTION OF THIS CONTRACT OR ORDER?

YES NO
*

*

*

b. DO THE COMPLETED ITEMS INSPECTED CONFORM TO CONTRACT SPECIFICATIONS?

*

c. DO OTHER THAN COMPLETED ITEMS CONFORM WITH TECHNICAL
REQUIREMENTS OF THE CONTRACT OR ORDER?

*

22. FOR WORK-IN-PROCESS, IS THE PERCENTAGE OF COMPLETION
ACCURATE?

*

23. REQUESTING OFFICE REMARKS (Where the answer to any question is placed in a block containing an asterisk (*) detailed comments of the verifier shall be included on the
reverse of this form and identified by section and item number.)

24. SIGNATURE OF REQUESTER

INVENTORY VERIFICATION
The above information is based on a physical verification of inventory listed under Item 5.
25. NAME AND TITLE

AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable

26. SIGNATURE OF VERIFIER

27. DATE

STANDARD FORM 1423 (REV. 7/2010)
Prescribed by GSA-FAR (48 CFR) 53.245(c)

STANDARD FORM 1423 (REV. 7/2010)


File Typeapplication/pdf
File Modified2010-07-21
File Created2004-06-21

© 2024 OMB.report | Privacy Policy