ICR Number XXXX.XX | Plant ID: | Insert Plant ID | |||||
OMB Control Number: XXXX-XXXX | Plant Name: | Insert Plant Name | |||||
Expiration Date: mm/dd/yyyy | |||||||
Steam Electric Questionnaire | |||||||
Second FRN Version Draft | |||||||
PART F - MANAGEMENT PRACTICES FOR PONDS/IMPOUNDMENTS AND LANDFILLS | |||||||
Table of Contents | |||||||
Section Title | Tab Name | ||||||
Part F Instructions | Part F Instructions | ||||||
Pond/Impoundment and Landfill Use | Part F Section 1 | ||||||
Pond/Impoundment Management Practices | Part F Section 2 | ||||||
Landfill Management Practices | Part F Section 3 | ||||||
Leachate Treatment System Design | Part F Section 4.1 | ||||||
Leachate Treatment System Flows | Part F Section 4.2 | ||||||
Leachate Treatment System Units | Part F Section 4.3 | ||||||
Leachate Treatment Unit Information | Part F Section 4.4 | ||||||
Leachate Treatment System Costs | Part F Section 4.5 | ||||||
Leachate Treatment System Equipment | Part F Section 4.6 | ||||||
Groundwater Monitoring Practices | Part F Section 5 | ||||||
Part F Comments | Part F Comments | ||||||
Steam Electric Questionnaire Code Tables | Code Tables |
Steam Electric Questionnaire | Part F. Instructions | ||||||
Plant ID: | Insert Plant ID | ||||||
Plant Name: | Insert Plant Name | ||||||
PART F. MANAGEMENT PRACTICES FOR PONDS/IMPOUNDMENTS AND LANDFILLS | |||||||
INSTRUCTIONS | |||||||
Complete Part F of the questionnaire for your plant. As you are completing the electronic form, note the following: When you enter your plant name and plant ID on the Part F TOC tab, all name and ID fields throughout Part F will automatically populate. Refer to the overall questionnaire instructions, the glossary, and the acronym list for assistance with completing Part F. | |||||||
Please provide all free response answers in the highlighted yellow areas. Throughout Part F, you may need to make copies of certain sections/questions. Instructions are provided throughout Part F regarding making copies. Note that pond/impoundment unit, landfill, leachate treatment system, and leachate treatment unit names or IDs must be populated on the copied tab or section, located in the upper right corner under "Plant ID" and "Plant Name", in order to correlate the requested information. | |||||||
Throughout Part F Section 4, information is requested on leachate treatment units and systems that are planned, under construction/installation, or planned to begin construction/installation by December 31, 2020. Provide design information, or best engineering estimates as necessary, for these planned systems/units. Additionally, enter “N/A” in the field or checkbox if the information requested is not applicable for planned systems/units (e.g., a question that requests flow rate data for year 2009). | |||||||
Use the Part F Comments tab to do the following: provide additional information as requested in certain questions within Part F; indicate atypical data (e.g., if 2009 information is not representative of normal operations); and note methods used to make best engineering estimates in the event that exact data are not available. | |||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | ||||||||||||
Plant ID: | Insert Plant ID | ||||||||||||
Plant Name: | Insert Plant Name | ||||||||||||
Part: | F | ||||||||||||
Section Title: | 1. Pond/Impoundment and Landfill Use | ||||||||||||
Instructions: | Part F requests information for all active/inactive/open and retired/closed pond/impoundment units and landfills, including those located on non-adjoining property, used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal or petroleum coke, including, but not limited to, fly ash, bottom ash, boiler slag, or flue gas emission control residues. This includes liquid-borne material and solid material. | ||||||||||||
CBI? | F1-1. | Does the plant have one or more active/inactive/open or retired/closed pond/impoundment units or landfills, including those located on non-adjoining property, used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal or petroleum coke, including, but not limited to, fly ash, bottom ash, boiler slag, or flue gas emission control residues (this includes liquid-borne material and solid material)? [Check the box below.] Note: Answer "yes" to this question even if all the pond/impoundments and landfills are closed. |
|||||||||||
(Continue) | |||||||||||||
(Skip to the next Questionnaire Part) | |||||||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||||||||||||||||||
Plant ID: | Insert Plant ID | |||||||||||||||||||
Plant Name: | Insert Plant Name | |||||||||||||||||||
Pond/Impoundment Unit ID: | Insert Pond ID | |||||||||||||||||||
Part: | F | |||||||||||||||||||
Section Title: | 2. Pond/Impoundment Management Practices | |||||||||||||||||||
Instructions: | Complete Section 2 for each active/inactive/open and retired/closed pond/impoundment unit, including those located on non-adjoining property, used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal or petroleum coke, including, but not limited to, fly ash, bottom ash, boiler slag, or flue gas emission control residues. This includes liquid-borne material and solid material. Enter the pond/impoundment unit ID in the space provided above (use pond/impoundment unit IDs assigned in Table A-4). Please provide all free response answers in the highlighted yellow areas. Make a copy of Section 2 for each active/inactive/open and retired/closed pond/impoundment unit, including those located on non-adjoining property, using the "Copy Section 2" button below. Please note that you will create two new tabs for this section. You may delete unneeded tabs, if accidently created. |
|||||||||||||||||||
Pond/Impoundment Unit Design | ||||||||||||||||||||
CBI? | F2-1. | Check all pond/impoundment embankment material(s) of construction, used for this unit. | ||||||||||||||||||
CBI? | F2-2. | If known, indicate the hydrologic design criteria of the pond/impoundment unit. | ||||||||||||||||||
CBI? | F2-3. | Has the pond/impoundment unit ever experienced an overflow, excluding routine permitted discharges? | ||||||||||||||||||
State when the overflow occurred and describe the reason for the overflow (e.g., experienced two 100-year, 24-hour storm events within one month): | ||||||||||||||||||||
(Skip to Question F2-5) | ||||||||||||||||||||
CBI? | F2-4. | Has a non-permitted pond/impoundment overflow ever been discharged to a receiving water? If so, identify the name of the receiving water. | ||||||||||||||||||
Leachate Collection and Leak Detection Systems | ||||||||||||||||||||
CBI? | F2-5. | Does the pond/impoundment unit have a system to collect leachate (including leaks, seepage, toe drains, or similar releases)? | ||||||||||||||||||
(Skip to Question F2-10) | ||||||||||||||||||||
CBI? | Provide the volume of leachate (including leaks, seepage, toe drains, or similar releases) collected in 2009 (gpd AND gpy) and the frequency of process wastewater generation (days). Also provide a description of the estimation method in the "Part F Comments" tab at the end of Part F. | |||||||||||||||||||
gpd | ||||||||||||||||||||
AND | ||||||||||||||||||||
gpy | Over | days | ||||||||||||||||||
CBI? | F2-7. | Does the plant collect other process wastewaters in the collection system for this pond/impoundment unit? If yes, indentify the process wastewaters and their flow rates. If the process wastewater is not one of the response options provided, select "Other" in the drop-down box and specify the type of process wastewater in the yellow highlighted space below. | ||||||||||||||||||
gpd | ||||||||||||||||||||
gpd | ||||||||||||||||||||
gpd | ||||||||||||||||||||
CBI? | F2-8. | What is the destination(s) of the leachate? If the plant recycles the leachate, indicate the plant process to which this waste is recycled. [Check all boxes that apply.] | ||||||||||||||||||
CBI? | F2-9. | If the leachate is sent to a pond or storage tank, are chemicals used to treat the leachate (e.g., lime for pH control)? If yes, indicate which chemicals are used. [Check all boxes that apply]. | ||||||||||||||||||
CBI? | F2-10. | Does the plant and/or its engineering contractors regularly monitor/inspect the structural integrity of the pond/impoundment unit? | ||||||||||||||||||
(Continue) | ||||||||||||||||||||
(Skip to Question F2-12) | ||||||||||||||||||||
CBI? | F2-11. | Indicate which of the following monitoring measures or inspections are performed on the pond/impoundment unit by the plant and/or its engineering contractors, the frequency of monitoring, and the average number of hours spent each month performing monitoring activities: | ||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
Inspections/month | hrs/month | |||||||||||||||||||
CBI? | F2-12. | In Table F-1, provide the following information for the last five inspections of the pond/impoundment unit: date of inspection, the type of person performing the inspection, and the cost of the inspection. If applicable, also indicate any corrective actions that resulted in response to the inspection and total costs associated with implementing the corrective actions, including labor costs. If the inspection is conducted by plant/company employees, include the labor associated with the time to conduct the inspection when estimating the cost of the inspection. | ||||||||||||||||||
Table F-1. Last Five Pond/Impoundment Unit Inspections | ||||||||||||||||||||
Date of Inspection (month/day/yr) | Affiliation of Inspector | Cost of Inspection | Corrective Actions Resulting From Inspection | Cost of Corrective Actions | ||||||||||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||||||||||||
Plant ID: | Insert Plant ID | |||||||||||||
Plant Name: | Insert Plant Name | |||||||||||||
Landfill ID: | Insert Landfill ID | |||||||||||||
Part: | F | |||||||||||||
Section Title: | 3. Landfill Management Practices | |||||||||||||
Instructions: | Complete Section 3 for each active/inactive/open and retired/closed landfill, including those located on non-adjoining property, used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal or petroleum coke, including, but not limited to, fly ash, bottom ash, boiler slag, or flue gas emission control residues. This includes liquid-borne material and solid material. Enter the landfill ID in the space provided above (use landfill IDs assigned in Table A-6). Please provide all free response answers in the highlighted yellow areas. Make a copy of Sections 3 for each active/inactive/open and retired/closed landfill, including those located on non-adjoining property, using the "Copy Section 3" button below. Please note that you will create two new tabs for this section. You may delete unneeded tabs, if accidently created. |
|||||||||||||
CBI? | F3-1. | List the date the landfill was built, and the landfill’s surface area and approved/licensed volume capacity and height when it was originally built. | ||||||||||||
Date built | ||||||||||||||
Surface area, acres | ||||||||||||||
Volume capacity, cubic feet | ||||||||||||||
Approved/licensed height, feet | ||||||||||||||
CBI? | F3-2. | List the landfill’s current surface area, and volume, and height above the original elevation of the stored materials. | ||||||||||||
Surface area, acres | ||||||||||||||
Volume of stored materials, cubic feet | ||||||||||||||
Height above original elevation, feet | ||||||||||||||
CBI? | F3-3. | Is the landfill closed? If yes, provide the date it was closed. If not, list the year of the landfill’s expected end of life (i.e., closure), and the expected surface area, and volume and height of stored materials at its expected end of life. | ||||||||||||
Surface area, acres | ||||||||||||||
Volume of stored materials, cubic feet | ||||||||||||||
Height above original elevation, feet | ||||||||||||||
CBI? | F3-4. | Has the landfill been expanded since the date it was built? | ||||||||||||
(Continue) | ||||||||||||||
(Skip to Question F3-8) | ||||||||||||||
CBI? | F3-5. | Identify the type of expansion. | ||||||||||||
CBI? | F3-6. | Describe the expansion(s) to the landfill, including starting and ending dimensions (surface area, volume of stored materials, height) and the costs associated with the expansions, including the labor, materials, and energy costs. Any unique capital costs should be listed separately from the general costs associated with the expansion(s). Additionally, provide the date(s) of expansion (month/yr). | ||||||||||||
CBI? | F3-7. | Provide the total capital cost associated with the expansion. Also provide the calendar year 2009 operation and maintenance (O&M) costs associated with the additional disposal due the expansion. Include the costs associated with the leachate collection system, if included as part of the landfill, in both the capital and O&M costs provided. | ||||||||||||
$ | Total capital cost | |||||||||||||
$ | Total O&M cost for calendar year 2009 | |||||||||||||
CBI? | F3-8. | Does the landfill have a liner? | ||||||||||||
(Complete Table F-2) | ||||||||||||||
(Skip to Question F3-9) | ||||||||||||||
Table F-2. Landfill Liner | ||||||||||||||
Type of Liner (Mark all that apply) | Liner Layer Number (number from inner to outer layer) | Thickness of Liner Layer (cm) | Permeability of Liner Layer (cm/sec) | |||||||||||
CBI? | F3-9. | Does the landfill have a cap/cover? | ||||||||||||
(Complete Table F-3) | ||||||||||||||
(Skip to Question F3-10) | ||||||||||||||
Type of Cap/Cover (Mark all that apply) | Cap/Cover Layer Number (number from inner to outer layer) | Thickness of Cap/Cover Layer (cm) | Permeability of Cap/Cover Layer (cm/sec) | |||||||||||
CBI? | F3-10. | Has the plant built any structures on top of the closed landfill? | ||||||||||||
(Complete Table F-3) | ||||||||||||||
(Skip to Question F3-11) | ||||||||||||||
(Skip to Question F3-11) | ||||||||||||||
Provide a description of the structure(s) and any challenges that the plant faced building on top of the landfill. | ||||||||||||||
Leachate Collection System | ||||||||||||||
CBI? | F3-11. | Does the landfill have a leachate collection system? | ||||||||||||
(Continue) | ||||||||||||||
(Skip to Question F3-15) | ||||||||||||||
CBI? | F3-12. | Provide the volume of leachate collected in 2009 (gpd AND gpy) and the frequency of process wastewater generation (days). Also provide a description of the estimation method in the "Part F Comments" tab. | ||||||||||||
gpd | ||||||||||||||
AND | ||||||||||||||
gpy | Over | days | ||||||||||||
CBI? | F3-13. | What is the destination(s) of the leachate? If the plant recycles the leachate, indicate the plant process to which this waste is recycled. [Check all boxes that apply.] | ||||||||||||
CBI? | F3-14. | If the leachate is sent to a pond or storage tank, are chemicals used to treat the leachate (e.g. lime for pH control)? If yes, indicate which chemicals are used. [Check all boxes that apply]. | ||||||||||||
Stormwater Runoff | ||||||||||||||
CBI? | F3-15. | Does the plant combine the conveyed stormwater runoff that has contacted the uncapped portion of the landfill with leachate? | ||||||||||||
CBI? | ||||||||||||||
CBI? | F3-17. | Does the plant combine the conveyed stormwater runoff that has contacted the capped portion of the landfill with leachate? | ||||||||||||
CBI? | ||||||||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||||||||||||||
Plant ID: | Insert Plant ID | |||||||||||||||
Plant Name: | Insert Plant Name | |||||||||||||||
Part: | F | |||||||||||||||
Section Title: | 4.1. Leachate Treatment System Design | |||||||||||||||
Instructions: | Complete Section 4.1 (Question F4-1and F4-2) for all leachate treatment systems (as specified in Question F2-8 and F3-15) which the plant operates or plans to operate or construct/install by December 31, 2020. Note that wastewater treatment systems previously defined in Table D-2 that receive pond/impoundment or landfill leachate should NOT be included in this table and you do not need to provide information for those systems in this section. Refer to your responses to Questions F2-8 and F3-15 to identify the systems that need to be included in this table. Please provide all free response answers in the highlighted yellow areas. | |||||||||||||||
CBI? | F4-1. | In Table F-4, list all leachate treatment systems (as specified in Question F2-8 and F3-15), not including wastewater treatment systems previously defined in Table D-2, which the plant operates or plans to operate. For each leachate treatment system, EPA assigned a number (e.g., LTS-1, LTS-2) in Table F-4, which will be used throughout the remainder of the survey. In the “Plant Designation” column, provide the plant’s name for each leachate treatment system. As an example, if a plant operates a chemical precipitation leachate treatment system that discharges to an ash pond/impoundment system, the leachate treatment system should be identified in Table F-4 as LTS-1 and the ash pond/impoundment system should have been previously identified in Table D-1. For each planned leachate treatment system, provide an estimate of the expected average annual flow rate of the effluent from the treatment system. | ||||||||||||||
Table F-4. Plant Leachate Treatment Systems | ||||||||||||||||
LTS System ID | Plant Designation | Treatment System Footprint (ft2) | Year Initially Brought On Line | Number of Leachate Collection Systems Contributing to the System | Distance from Leachate Collection System* (ft) | Approximate Distance to Final Outfall (ft) | Effluent from Leachate Treatment System Average Annual (2009) Flow Rate |
|||||||||
Operating LeachateTreatment Systems | ||||||||||||||||
gpm | hpd | dpy | ||||||||||||||
LTS-1 | Outfall number: | OR | gpd | dpy | ||||||||||||
LTS-2 | gpm | hpd | dpy | |||||||||||||
Outfall number: | OR | gpd | dpy | |||||||||||||
LTS-3 | gpm | hpd | dpy | |||||||||||||
Outfall number: | OR | gpd | dpy | |||||||||||||
LTS-4 | gpm | hpd | dpy | |||||||||||||
Outfall number: | OR | gpd | dpy | |||||||||||||
LTS-5 | gpm | hpd | dpy | |||||||||||||
Outfall number: | OR | gpd | dpy | |||||||||||||
LTS-6 | gpm | hpd | dpy | |||||||||||||
Outfall number: | OR | gpd | dpy | |||||||||||||
Planned LeachateTreatment Systems | ||||||||||||||||
LTS-A | ||||||||||||||||
Outfall number: | gpd | |||||||||||||||
LTS-B | ||||||||||||||||
Outfall number: | gpd | |||||||||||||||
LTS-C | ||||||||||||||||
Outfall number: | gpd | |||||||||||||||
* If there are multiple leachate collection systems transferring leachate to the treatment system, provide the average distance for all leachate collection systems. | ||||||||||||||||
CBI? | F4-2. | Attach a block diagram that shows the leachate treatment operations, the process wastewaters that currently enter or are planned to enter the leachate treatment system, and the ultimate destinations of the leachate treatment system effluent(s). Specific instructions for the diagram are provided in the checklist below. The diagram should have a similar level of detail as EPA’s Example EPA_F-1 shown below. NOTE: You may use an existing diagram, such as a water balance diagram included in the plant’s NPDES Form 2C, and mark the additional required information on the diagram by hand. Provide as many diagrams as necessary to convey the information requested in the checklist below. Number each block diagram in the upper right corner; the first block diagram should be numbered F-1, the second F-2, etc. Include the plant name, plant ID, and leachate treatment system ID in the upper right hand corner of the diagram. |
||||||||||||||
Block Diagram Checklist | ||||||||||||||||
Mark the boxes below to verify that you have completed each checklist item… | ||||||||||||||||
Include the block diagram number, plant name, plant ID, and leachate treatment system ID on the diagram. | ||||||||||||||||
Include each leachate treatment unit operation. Show all influent and effluent streams from the units and label all influent and effluent streams from the leachate treatment system using the codes on the "Code Tables" tab provided at the end of this workbook. Effluent streams may include process wastewater and sludges. | ||||||||||||||||
If a process operation does not have an EPA-assigned number, use the plant-designated name for the process operation. When sources or destinations are not shown on the diagram (i.e., the stream is entering from a location not shown on the diagram), describe the source or destination and add the block diagram number, when appropriate, where the stream's previous location can be seen. Use codes from the "Code Tables" tab provided at the end of this workbook. Note that the codes listed in the "Wastewater Treatment Unit" table on the "Code Tables" tab should be used for assigning the leachate treatment units. | ||||||||||||||||
Indicate where chemical addition occurs (i.e., into or between which leachate treatment units). For constructed wetland treatment cells, indicate and note on the diagram where within or near the constructed wetland treatment cell the chemical is added (e.g., within the constructed wetland treatment cell near the leachate influent point, within the constructed wetland treatment cell near the effluent, in the effluent/discharge canal). The chemicals indicated should correspond to the chemicals listed in Table F-8. | ||||||||||||||||
Identify the final, general destination of the treated leahate (e.g., treated leachate effluent to POTW or surface waters; solid wastes to on- or off-site destinations). Use codes from the "Code Tables" tab provided at the end of this workbook, when applicable. | ||||||||||||||||
Indicate, as appropriate, where treated leachate is reused or recycled within the plant (e.g., reuse of settling pond/impoundment water as fly ash sluice). | ||||||||||||||||
Include the average annual (2009) flow rates for influent and effluent streams from the leachate treatment system on the diagram (in gpm or gpd). For planned leachate treatment systems, provide the design flow rates for the system. Note that these should be the same flow rates that are entered into Table F-5 in Question F3-3. If the actual number of days of operation for 2009 is not known, the total annual flow may be divided by 365 days and a comment added to the Comments page. If the leachate stream is intermittent, provide amount and frequency; for example “100 gal, twice/day, 100 dpy” or “1000 gpm, 4 hpd, 365 dpy”. | ||||||||||||||||
Include NPDES permit outfall numbers, if applicable. | ||||||||||||||||
If you believe that the diagram should be treated as confidential, stamp it "Confidential" or write "Confidential" or "CBI" across the top. If any diagram is not marked "Confidential", it will be considered nonconfidential under 40 CFR Part 2, Subpart B. | ||||||||||||||||
Review: | ||||||||||||||||
If any of the statements above were not checked, revise the block diagram(s) and ensure all statements have been checked. | ||||||||||||||||
Example EPA_F-1. Block Diagram for Leachate Treatment System |
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||||||||||||||||||
Plant ID: | Insert Plant ID | |||||||||||||||||||
Plant Name: | Insert Plant Name | |||||||||||||||||||
Leachate Treatment System ID: | Insert System ID | |||||||||||||||||||
Part: | F | |||||||||||||||||||
Section Title: | 4.2. Leachate Treatment System Flows | |||||||||||||||||||
Instructions: | Complete Section 4.2 (Question F4-3) for each leachate treatment system identified in Table F-4, including planned systems, systems under construction/installation, or planned to be constructed/installed by December 31, 2020. Enter the leachate treatment system ID in the yellow highlighted space provided above (use the leachate treatment system ID assigned in Table F-4). Make a copy of Section 4.2 for each leachate treatment system identified in Table F-4 using the "Copy Section 4.2" button below. |
|||||||||||||||||||
CBI? | Complete Table F-5 for each leachate treatment system identified in Table F-4. Identify the process wastewaters generated from pond/impoundment(s) and/or landfill(s), previously defined in Table A-4 and Table A-6, that are treated by the leachate treatment system. Please provide the flow rates of the process wastewater into the leachate treatment system. For planned leachate treatment systems, provide the design flow rates for the system. | |||||||||||||||||||
Table F-5. Leachate Treatment System Flows in 2009 | ||||||||||||||||||||
Process Wastewater | Pond/Impoundment Unit or Landfill ID (Identified in Table A-4 or A-6) | Influent to the Treatment System | ||||||||||||||||||
Average Annual (2009) Flow Rate | ||||||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
gpm | hpd | dpy | ||||||||||||||||||
Other: | OR | gpd | dpy | |||||||||||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | ||||||
Plant ID: | Insert Plant ID | ||||||
Plant Name: | Insert Plant Name | ||||||
Leachate Treatment System ID: | Insert System ID | ||||||
Part: | F | ||||||
Section Title: | 4.3. Leachate Treatment System Units | ||||||
Instructions: | Complete Section 4.3 (Questions F4-4 through F4-7) for each leachate treatment system identified in Table F-4, including systems that are planned, under construction/installation, or planned to be constructed/installed by December 31, 2020. Enter the leachate treatment system ID in the yellow highlighted space provided above (use leachate treatment system ID assigned in Table F-4). Make a copy of Section 4.3 for each leachate treatment system identified in Table F-4 using the "Copy Section 4.3" button below. NOTE: If the leachate treatment system includes a pond/impoundment unit, include the pond/impoundment unit in Table F-6. |
||||||
CBI? | In Table F-6, list all leachate treatment units comprising the leachate treatment system including units that are operating, under construction/installation, or planned to be constructed/installed by December 31, 2020. For each leachate treatment unit, assign an ID using the leachate treatment unit ID options presented in the drop-down box; however, if a pond/impoundment unit is included as part of the leachate treatment system, enter the pond/impoundment unit ID assigned in Table A-4 in the space labeled "Pond ID". The leachate treatment unit ID option accounts for the possibility of multiple units; they are numbered sequentially. For example, if the leachate treatment system includes two clarifiers, select CL-1 for the first clarifier and CL-2 for the second. Note that these terms are defined in the "Code Tables" tab at the end of Part F. In the “Plant Designation” column, provide the plant’s name for each leachate treatment unit. In the “Date Added to System” column, either enter the date the unit was/will be installed if the unit is a retrofit, or enter “original” if the unit was part of the original wastewater treatment system installation. Note: A constructed wetland cell is considered one leachate treatment unit. |
||||||
Table F-6. Leachate Treatment Units | |||||||
Leachate Treatment Unit ID | Plant Designation | ||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
Other: | |||||||
Pond ID: | |||||||
CBI? | In Table F-7, list all planned improvements to the leachate treatment system. For each planned improvement to the leachate treatment system, provide the appropriate Leachate Treament Unit ID (if applicable), using the Code Tables. However, if the improvement relates directly to a pond/impoundment, use the pond/impoundment ID assigned in Table A-4. Provide a description of the improvement, the expected date of the improvement, and the total capital cost related to the improvement. Note: Total capital costs should include purchased equipment, installation, buildings, site preparation, land, engineering costs, construction expenses, and any other costs available. |
||||||
Table F-7. Planned Improvements to the Leachate Treatment System | |||||||
Leachate Treatment Unit ID | Description of Improvement | Expected Date of Improvement (day/month/year) | Total Capital Cost | ||||
Other: | $ | ||||||
Pond ID: | |||||||
Other: | $ | ||||||
Pond ID: | |||||||
Other: | $ | ||||||
Pond ID: | |||||||
Other: | $ | ||||||
Pond ID: | |||||||
Other: | $ | ||||||
Pond ID: | |||||||
CBI? | Were any of the above planned improvements to the leachate treatment system, or the planned leachate treatment system, planned in preparation for protential limit changes in the future? | ||||||
(Provide further information) | |||||||
(Skip to Question F4-7) | |||||||
Please identify which pollutants and/or limits, in particular, the improvement or system will target. | |||||||
CBI? | Provide the typical flow rate for the leachate treatment system and the maximum flow rates for 2009. In addition, provide the duration and frequency of the efluent transfers from the leachate treatment system in 2009. If the leachate treatment system is planned, only provide the design flow rate and enter "N/A" in all other fields. | ||||||
Typical flow rate in 2009, gpm | |||||||
Maximum daily flow rate in 2009, gpd | |||||||
Duration of effluent transfers from treatment system in 2009, hpd | |||||||
Frequency of effluent transfers from treatment system in 2009, dpy |
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | ||||||||||
Plant ID: | Insert Plant ID | ||||||||||
Plant Name: | Insert Plant Name | ||||||||||
Leachate Treatment System ID: | Insert System ID | ||||||||||
Leachate Treatment Unit ID: | Insert Unit ID | ||||||||||
Part: | F | ||||||||||
Section Title: | 4.4 Leachate Treatment Unit Information | ||||||||||
Instructions: | Complete Section 4.4 (Questions F4-8 through F4-15) for each leachate treatment unit identified in Table F-6, including all leachate treatment units that are operating, under construction/installation, or planned to be constructed/installed by December 31, 2020. Do NOT complete Questions F4-8 through F4-15 for pond/impoundment units that are part of the leachate treatment system. Enter the leachate treatment system ID and leachate treatment unit ID in the highligted yellow spaces provided above (use leachate treatment system IDs assigned in Table F-4 and leachate treatment unit IDs assigned in Table F-6). Please provide all free response answers in the highlighted yellow areas. Make a copy of Section 4.4 for each leahcate treatment unit identified in Table F-6 using the "Copy Section 4.4" button below. |
||||||||||
CBI? | F4-8. | Provide the volume (ft3) of the leachate treatment unit. In the case of a wetland cell, provide the water depth (ft). | |||||||||
ft3 | |||||||||||
OR | |||||||||||
ft | |||||||||||
CBI? | F4-9. | Provide the footprint/surface area (ft2) of the leachate treatment system unit. | |||||||||
ft2 | |||||||||||
CBI? | F4-10. | Provide the residence time (hours) of leachate within the leachate treatment unit. | |||||||||
hours | |||||||||||
CBI? | F4-11. | Indicate the type of materials of construction of the leachate treatment unit. | |||||||||
CBI? | Indicate the pollutants targeted for removal by this leachate treatment system unit using techniques other than settling (e.g., adding chemicals to remove certain metals). [Check all boxes that apply.] | ||||||||||
CBI? | F4-13. | Of the pollutants listed in Question F4-12, which effluent limitation(s) drives/will drive the operation of this leachate treatment unit? Provide the pollutant(s) and the limitation(s) (µg/L or mg/L). | |||||||||
Pollutant: | |||||||||||
Limitation: | |||||||||||
Pollutant: | |||||||||||
Limitation: | |||||||||||
Pollutant: | |||||||||||
Limitation: | |||||||||||
CBI? | F4-14. | Did the plant add chemicals to this leachate treatment unit in 2009? [Check the box below.] | |||||||||
(Complete Table F-8) | |||||||||||
(Skip to Question F4-15) | |||||||||||
Note that "Average Dose Concentration" refers to the average concentration of the chemical within the wastewater treatment unit just after it is added to the unit. | |||||||||||
Table F-8. Chemicals Used in Leachate Treatment Unit Operations | |||||||||||
Chemical Type | Trade Name | Manufacturer | Purpose | Location of Chemical Addition | Average Dose Concentration (g/L) | Average Addition Rate (gpd or lb/day) | Frequency of Addition (dpy) | ||||
CBI? | F4-15. | Does the leachate treatment unit contain any plant species? [Check the box below.] | |||||||||
(Complete Table F-9) | |||||||||||
(Skip to Section 4.5) | |||||||||||
(Leachate treatment unit is planned to be constructed. Provide information in Table F-9 to the extent possible based on plans.) | |||||||||||
Table F-9. Plant Species Used in Leachate Treatment Unit Operations | |||||||||||
Plant Species | Plant Name | Purpose | |||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | ||||||||
Plant ID: | Insert Plant ID | ||||||||
Plant Name: | Insert Plant Name | ||||||||
Leachate Treatment System ID: | Insert System ID | ||||||||
Part: | F | ||||||||
Section Title: | 4.5. Leachate Treatment System Costs | ||||||||
Instructions: | Complete Sections 4.5 and 4.6 (Question F4-16 and F4-18) for each leachate treatment system identified in Table F-4 that was installed at the plant on or after January 1, 1985. Enter the leachate treatment system ID in the highlighted yellow space provided above (use leachate treatment system IDs assigned in Table F-4). Make a copy of Sections 4.5 and 4.6 for each leachate treatment system identified in Table F-4 using the "Copy Section 4.5 and 4.6" button below. Please note that you will create two new tabs for this section. You may delete unneeded tabs, if accidently created. |
||||||||
CBI? | F4-16. | Provide annual O&M cost data in Table F-10 for each leachate treatment system identified in Table F-4 that was operated in 2009. Provide best engineering estimates when actual data are not readily available. If you provide an estimate, note the methods that were used to make the estimates in the Comments page. | |||||||
Table F-10. O&M Cost for the Leachate Treatment System for 2009 | |||||||||
O&M Cost Category | 2009 Annual Cost | Rate | Staffing/ Consumption | ||||||
per hour (average rate of labor) | No. of workers | ||||||||
Operating labor | $ | $ | hpd | ||||||
dpy | |||||||||
per hour (average rate of labor) | No. of workers | ||||||||
Maintenance labor | $ | $ | hpd | ||||||
dpy | |||||||||
Maintenance materials | $ | ||||||||
Chemicals | $ | ||||||||
Plants/organic matter | $ | ||||||||
Energy - Power for pumping | $ | $ | per kWh | kWh/hr | |||||
Energy - Power for operations other than pumping | $ | $ | per kWh | kWh/hr | |||||
Steam | $ | $ | per pound | pounds/hr | |||||
Hazardous Sludge Disposal - Dredging | $ | $ | |||||||
Hazardous Sludge Disposal - Landfilling | $ | $ | |||||||
Nonhazardous Sludge Disposal - Dredging | $ | $ | |||||||
Nonhazardous Sludge Disposal - Landfilling | $ | $ | |||||||
Other: | |||||||||
$ | |||||||||
Other: | |||||||||
$ | |||||||||
Total O&M Cost (2009) | $ | ||||||||
CBI? | Provide capital cost data in Table F-11 for all leachate treatment systems identified in Table F-4, including planned leachate treatment systems. Provide best engineering estimates when actual data are not readily available. For all costs, do not adjust for inflation. For example, if the plant incurred a land cost in 2002, enter the cost in the “Cost” column and enter “2002” in the “Year on which Cost is Based” column. NOTE: If no records are available on this leachate treatment system, provide an explanation in the Comments page. |
||||||||
Table F-11. Capital Cost for the Leachate Treatment System | |||||||||
Project | Cost | Year on which Cost is Based | |||||||
Direct Costs | |||||||||
Purchased equipment (includes all equipment for the installation or the upgrade: mechanical equipment; piping; instrumentation; electrical equipment; plants/organic matter for constructed wetland(s); spare parts; freight charges; taxes; insurance; and duties) | $ | ||||||||
Purchased equipment installation (includes installation of all equipment; piping; instrumentation/calibration; electrical equipment; mechanical equipment; structural supports, insulation, and paint) | $ | ||||||||
Buildings (buildings constructed to operator rooms, or other operations associated with the system; also includes plumbing, heating, ventilation, dust collection, air conditioning, lighting, telephones, intercoms, painting, sprinklers, fire alarms) | $ | ||||||||
Site preparation (includes site clearing, all demolition, grading, roads, walking areas, fences) | $ | ||||||||
Land (includes property costs and survey fees) | $ | ||||||||
Total Direct Costs | $ | ||||||||
Indirect Costs | |||||||||
Engineering Costs (includes process design and general engineering, cost engineering, consulting fees, supervision, inspection for each category below: | |||||||||
a. Engineering Contract Firm Costs | $ | ||||||||
b. Owner's Overhead Engineering Costs | $ | ||||||||
Construction expenses (includes temporary construction offices, roads, communications, fencing; construction tools and equipment; permits, taxes, insurance) | $ | ||||||||
Other Contractor's Fees | $ | ||||||||
Contingency actually expended (to compensate for unpredictable events such as storms, floods, strikes, price changes, errors in estimates, design changes, etc.) | $ | ||||||||
Total Indirect Costs | $ | ||||||||
Total Capital Cost | $ |
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||
Plant ID: | Insert Plant ID | |||
Plant Name: | Insert Plant Name | |||
Leachate Treatment System ID: | Insert System ID | |||
Part: | F | |||
Section Title: | 4.6. Leachate Treatment System Equipment | |||
Instructions: | Complete Section 4.6 (Question F4-18) for all ancillary pieces of equipment included in the leachate treatment system that contribute to the capital costs provided in Table F-11. Note: This tab will copy with every copy made for the previous tab (Part F Section 4.5) as the information is directly related. |
|||
CBI? | F4-18. | In Table F-12, list the ancillary pieces of equipment included in the leachate treatment system that contribute significantly to the capital costs provided in Table F-11. Enter the description of the equipment and the total number of pieces of that equipment included in the system. Refer to the example shown below. | ||
Examples of ancillary equipment: | Aerator | |||
Agitator | ||||
Chemical feed system (specify chemicals) | ||||
Pump, sludge (specify purpose/location) | ||||
Pump, process wastewater (specify purpose/location) | ||||
Table F-12. Ancillary Equipment of the Leachate Treatment System | ||||
Ancillary Equipment (if applicable) | Number of Ancillary Equipment Pieces in the System | |||
Pump, sludge (serving underflow from clarifiers) | 2 | |||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||||||||
Plant Name: | Insert Plant ID | |||||||||
Plant ID: | Insert Plant Name | |||||||||
Pond/Impoundment System or Landfill ID: | Insert ID | |||||||||
Part: | F | |||||||||
Section Title: | 5. Groundwater Monitoring Practices | |||||||||
Instructions: | Make copies of Section 5 for each active/inactive/open and retired/closed pond/impoundment system and landfill, including those located on non-adjoining property,used for the storage, treatment, and/or disposal of residues or by-products (or sludges or water streams containing the residues or by-products) from the combustion of coal or petroleum coke, including, but not limited to, fly ash, bottom ash, boiler slag, or flue gas emission control residues. This includes liquid-borne material and solid material. Enter the pond/impoundment system or landfill ID in the space provided above (use pond/impoundment system and landfill IDs assigned in Table D-1, Table D-2, and Table A-6). Please provide all free response answers in the highlighted yellow areas. Make a copy of Section 5 for each active/inactive/open and retired/closed pond/impoundment system and landfill, including those located on non-adjoining property, using the "Copy Section 5" button below. |
|||||||||
CBI? | F5-1. | Does the plant perform groundwater monitoring of the pond/impoundment system or landfill? | ||||||||
(Skip to next Questionnaire Part) | ||||||||||
Year of last monitoring event | ||||||||||
Average frequency of monitoring, dpy | ||||||||||
Number of times monitored in the last five years | ||||||||||
(Continue) | ||||||||||
CBI? | F5-2. | Provide an overhead diagram of the pond/impoundment sytem or landfill. Identify the location of the monitoring wells of the pond/impoundment system or landfill and assign each well a number. In Table F-13, provide the average water table depth at each monitoring well location and the distance to the nearest surface water. | ||||||||
Table F-13. Monitoring Well Information | ||||||||||
Monitoring Well ID Number | Average Water Table Depth at Well (ft) | Distance to Nearest Surface Water (miles) | ||||||||
Example: Well-1 | 26 feet | 0.25 miles | ||||||||
CBI? | F5-3. | Has the plant measured pollutant concentrations from ash and FGD-related constituents (refer to list of analytes in Question G3-1) in ground water that exceed a primary or secondary MCL and/or state-issued standard/criteria? | ||||||||
(Continue) | ||||||||||
(Skip to Question F5-5) | ||||||||||
CBI? | F5-4. | Identify the pollutants that exceeded a primary or secondary MCL and/or state-issued standard/criteria. | ||||||||
CBI? | F5-5. | Has the plant measured pollutant concentrations from ash and FGD-related constituents (refer to list of analytes in Question G3-1) in ground water that do not exceed a primary or secondary MCL and/or state-issued standard/criteria, but do exceed background concentrations? | ||||||||
(Continue) | ||||||||||
(Skip to next Questionnaire Part) | ||||||||||
CBI? | F5-6. | Identify the pollutants that did not exceed a primary or secondary MCL and/or state-issued standard/criteria, but did exceed background concentrations. | ||||||||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | |||
Plant Name: | Insert Plant ID | |||
Plant ID: | Insert Plant Name | |||
Part: | F | |||
Section Title: | Part F Comments | |||
Instructions: | Cross reference your comments by question number and indicate the confidential status of your comment by checking the box next to “Yes” under "CBI?" (Confidential Business Information). | |||
Question Number | Comment | |||
Steam Electric Questionnaire | Part F. Management Practices for Ponds/Impoundments and Landfills | ||||
Steam Electric Questionnaire Code Tables | |||||
Process Wastewaters | Treated Wastewaters | ||||
For Use in Tables and Questions throughout Parts A, B, C, D, and F. | For Use as Effluents from Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-4. | ||||
Air heater cleaning water | AHCW | ||||
Ash pile runoff | APR | Effluent - 1 | EFF-1 | ||
Boiler blowdown | BB | Effluent - 2 | EFF-2 | ||
Boiler fireside cleaning water | BFCW | Effluent - 3 | EFF-3 | ||
Boiler tube cleaning water | BTCW | Effluent - 4 | EFF-4 | ||
Bottom ash sluice | BAS | Effluent - 5 | EFF-5 | ||
Carbon capture wastewater | CCAPW | Effluent - 6 | EFF-6 | ||
Coal pile runoff | CPR | Filter backwash | FltBW | ||
Combined ash sluice | CAS | Sludge | SLDG | ||
Combustion turbine cleaning (combustion gas portion of turbine) water | COMBCW | For Use as Influents to Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-3, AND Recycled Waters Throughout Questionnaire. | |||
Combustion turbine cleaning (compressor portion of the turbine) water | COMPRCW | POND-1 Effluent | POND-1-EFF | ||
Combustion turbine evaporative coolers blowdown | TECB | POND-2 Effluent | POND-2-EFF | ||
Cooling tower blowdown | CTB | POND-3 Effluent | POND-3-EFF | ||
FGD scrubber purge | SCRBP | POND-4 Effluent | POND-4-EFF | ||
FGD slurry blowdown | FGDB | POND-5 Effluent | POND-5-EFF | ||
Filter Backwash | FLTBW | POND-6 Effluent | POND-6-EFF | ||
Floor drain wastewater | FDW | POND-7 Effluent | POND-7-EFF | ||
Flue gas mercury control system wastewater | FGMCW | POND-8 Effluent | POND-8-EFF | ||
Fly ash sluice | FAS | POND-9 Effluent | POND-9-EFF | ||
General runoff | GR | POND-10 Effluent | POND-10-EFF | ||
Gypsum pile runoff | GPR | POND-A Effluent | POND-A-EFF | ||
Gypsum wash water | GYPWW | POND-B Effluent | POND-B-EFF | ||
Ion exchange wastewater | IXW | POND-C Effluent | POND-C-EFF | ||
Landfill runoff - capped landfill | LRC | WWT-1 Effluent | WWT-1-EFF | ||
Landfill runoff - uncapped landfill | LRUC | WWT-2 Effluent | WWT-2-EFF | ||
Leachate | LEACH | WWT-3 Effluent | WWT-3-EFF | ||
Limestone pile runoff | LPR | WWT-4 Effluent | WWT-4-EFF | ||
Mill reject sluice | MRS | WWT-5 Effluent | WWT-5-EFF | ||
Process Wastewaters | Treated Wastewaters | ||||
For Use in Tables and Questions throughout Parts A, B, C, D, and F. | For Use as Influents to Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-3, AND Recycled Waters Throughout Questionnaire. | ||||
Once -through cooling water | CW | WWT-6 Effluent | WWT-6-EFF | ||
Reverse osmosis reject water | RORW | WWT-A Effluent | WWT-A-EFF | ||
SCR catalyst regeneration wastewater | SCRRW | WWT-B Effluent | WWT-B-EFF | ||
SCR catalyst washing wastewater | SCRWW | WWT-C Effluent | WWT-C-EFF | ||
Soot blowing wash water | SOOTW | ||||
Steam turbine cleaning water | STCW | ||||
Yard drain wastewater | YARDW | ||||
Wastewater Treatment Units | Destinations | ||||
For Use in Tables and Questions Throughout Parts D and F. | For Use in Tables and Questions Throughout Parts A, C, D, and F. | ||||
Adsorptive media | ADSORB | Burned on site | BURN | ||
Aerobic Biological Reactor | AERBIO | Deep-well injection | DWELL | ||
Anaerobic Biological Reactor | ANBIO | Discharge to POTW | POTW | ||
Aerobic/Anaerobic Biological Reactor | AER/ANBIO | Discharge to PrOTW | PrOTW | ||
Chemical Precipitation Reaction Tank 1 - 1 | CP-1-1 | Discharge to surface water | SW | ||
Chemical Precipitation Reaction Tank 1 - 2 | CP-1-2 | Evaporation | EVAP | ||
Chemical Precipitation Reaction Tank 2 - 1 | CP-2-1 | Hauled off site for reuse (removal fee) | HAULR - RF | ||
Chemical Precipitation Reaction Tank 2 - 2 | CP-2-2 | Hauled off site for reuse (given away) | HAULR - GA | ||
Chemical Precipitation Reaction Tank 3 - 1 | CP-3-1 | Hauled off site for reuse (marketed and sold) | SOLD | ||
Chemical Precipitation Reaction Tank 3 - 2 | CP-3-2 | Hauled off site for disposal | HAUL | ||
Clarification, Primary - 1 | CL-P-1 | Mixed with fly ash for disposal | MFA | ||
Clarification, Primary - 2 | CL-P-2 | On-site landfill (as reported in Table A-6) | LANDF | ||
Clarification, Secondary - 1 | CL-S-1 | POND-1 | POND-1 | ||
Clarification, Secondary - 2 | CL-S-2 | POND-2 | POND-2 | ||
Clarification, Tertiary - 1 | CL-T-1 | POND-3 | POND-3 | ||
Clarification, Tertiary - 2 | CL-T-2 | POND-4 | POND-4 | ||
Constructed wetland - Cell 1 | CWL -1 | POND-5 | POND-5 | ||
Constructed wetland - Cell 2 | CWL -2 | POND-6 | POND-6 | ||
Constructed wetland - Cell 3 | CWL -3 | POND-7 | POND-7 | ||
Constructed wetland - Cell 4 | CWL -4 | POND-8 | POND-8 | ||
Constructed wetland - Cell 5 | CWL -5 | POND-9 | POND-9 | ||
Constructed wetland - Cell 6 | CWL -6 | POND-10 | POND-10 | ||
Constructed wetland system | CWTS | POND-A | POND-A | ||
Equalization, Primary | EQ-P | POND-B | POND-B | ||
Equalization, Secondary | EQ-S | POND-C | POND-C | ||
Filter, Microfiltration - 1 | FLT-M-1 | WWT-1 | WWT-1 | ||
Filter, Microfiltration - 2 | FLT-M-2 | WWT-2 | WWT-2 | ||
Wastewater Treatment Units | Destinations | ||||
For Use in Tables and Questions Throughout Parts D and F. | For Use in Tables and Questions Throughout Parts A, C, D, and F. | ||||
Filter, Microfiltration - 3 | FLT-M-3 | WWT-3 | WWT-3 | ||
Filter, Microfiltration - 4 | FLT-M-4 | WWT-4 | WWT-4 | ||
Filter, Sand/Gravity - 1 | FLT-S-1 | WWT-5 | WWT-5 | ||
Filter, Sand/Gravity - 2 | FLT-S-2 | WWT-6 | WWT-6 | ||
Filter, Sand/Gravity - 3 | FLT-S-3 | WWT-A | WWT-A | ||
Filter, Sand/Gravity - 4 | FLT-S-4 | WWT-B | WWT-B | ||
Filter, Ultrafiltration - 1 | FLT-U-1 | WWT-C | WWT-C | ||
Filter, Ultrafiltration - 2 | FLT-U-2 | Reuse as boiler water | RECYC - BW | ||
Filter, Ultrafiltration - 3 | FLT-U-3 | Reuse as bottom ash sluice | RECYC - BAS | ||
Filter, Ultrafiltration - 4 | FLT-U-4 | Reuse as combined ash sluice | RECYC - CAS | ||
Filter press - 1 | FP-1 | Reuse as FGD slurry preparation water | RECYC - FGDP | ||
Filter press - 2 | FP-2 | Reuse as FGD absorber makeup | RECYC - FGDAB | ||
Holding tank | HT | Reuse as fly ash sluice | RECYC - FAS | ||
Ion exchange | IX | Reuse as mill reject sluice | RECYC - MRS | ||
Natural wetlands | NW | Reuse in cooling towers | RECYC - CW | ||
pH adjustment - 1 | PH-1 | ||||
pH adjustment - 2 | PH-2 | ||||
pH adjustment - 3 | PH-3 | ||||
Reverse osmosis | ROS | ||||
Pond Unit - 1 | SPD-1 | ||||
Pond Unit - 2 | SPD-2 | ||||
Pond Unit - 3 | SPD-3 | ||||
Pond Unit - 4 | SPD-4 | ||||
Pond Unit - 5 | SPD-5 | ||||
Pond Unit - 6 | SPD-6 | ||||
Pond Unit - 7 | SPD-7 | ||||
Pond Unit - 8 | SPD-8 | ||||
Pond Unit - 9 | SPD-9 | ||||
Wastewater Treatment Units | Solids Handling | ||||
For Use in Tables and Questions Throughout Parts D and F. | For Use as Planned Solids Handling for the FGD Slurry Blowdown in Part B Table B-2. | ||||
Pond Unit - 10 | SPD-10 | Centrifuge - 1 | CENT-1 | ||
Pond Unit - 11 | SPD-11 | Centrifuge - 2 | CENT-2 | ||
Pond Unit - 12 | SPD-12 | Centrifuge - 3 | CENT-3 | ||
Pond Unit - 13 | SPD-13 | Centrifuge - 4 | CENT-4 | ||
Pond Unit - 14 | SPD-14 | Hydrocyclones - 1 | HYC-1 | ||
Settling tank - 1 | ST-1 | Hydrocyclones - 2 | HYC-2 | ||
Settling tank - 2 | ST-2 | Hydrocyclones - 3 | HYC-3 | ||
Settling tank - 3 | ST-3 | Hydrocyclones - 4 | HYC-4 | ||
Settling tank - 4 | ST-4 | Filter press - 1 | FP-1 | ||
Settling tank - 5 | ST-5 | Filter press - 2 | FP-2 | ||
Thickener - 1 | TH-1 | Thickener - 1 | TH-1 | ||
Thickener - 2 | TH-2 | Thickener - 2 | TH-2 | ||
Vacuum drum filter - 1 | VF-1 | Vacuum drum filter - 1 | VF-1 | ||
Vacuum drum filter - 2 | VF-2 | Vacuum drum filter - 2 | VF-2 | ||
Vacuum filter belt - 1 | VFB-1 | Vacuum filter belt - 1 | VFB-1 | ||
Vacuum filter belt - 2 | VFB-2 | Vacuum filter belt - 2 | VFB-2 |
File Type | application/vnd.ms-excel |
Author | Jennifer O'Neil |
Last Modified By | ESabol |
File Modified | 2010-02-22 |
File Created | 2008-05-21 |