Steam Electric Questionnaire |
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
Section Title: |
1.1. Plant Contact Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 1.1 (Questions A1-1 to A1-5), provide information requested on plant contacts. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-1. |
Provide the physical plant address in the yellow spaces provided below. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Street Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
State: |
|
Zip Code: |
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-2. |
Provide the name, title, telephone and fax numbers, and e-mail address of the primary contact for technical information supplied in this questionnaire. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary Technical Contact Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary Technical Contact Title: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Email: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Street Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
State: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Telephone Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convenient time to call between (Eastern Time): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to |
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A1-3. |
Provide the name, title, telephone and fax numbers, and e-mail address of the secondary contact for technical information supplied in this questionnaire. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary Technical Contact Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary Technical Contact Title: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Email: |
|
|
|
|
|
|
|
|
|
|
|
|
|
Street Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
State: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Telephone Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convenient time to call between (Eastern Time): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to |
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A1-4. |
Provide the name, title, telephone and fax numbers, and e-mail address of the primary contact for economic/financial information supplied in this questionnaire. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary Economic/Financial Contact Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary Economic/Financial Contact Title: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Email: |
|
|
|
|
|
|
|
|
|
|
|
|
Street Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
State: |
|
Zip Code: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Telephone Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convenient time to call between (Eastern Time): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to |
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-5. |
Provide the name, title, telephone and fax numbers, and e-mail address of the secondary contact for economic/financial information supplied in this questionnaire. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary Economic/Financial Contact Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary Economic/Financial Contact Title: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Email: |
|
|
|
|
|
|
|
|
|
|
|
|
Street Address: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
City: |
|
|
|
|
|
|
|
|
|
|
|
|
|
State: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Telephone Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fax Number: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Convenient time to call between (Eastern Time): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
to |
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
Section Title: |
1.2. General Plant Operating Characteristics |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 1.2 (Questions A1-6 to A1-14), provide information requested on general plant operating characteristics. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-6. |
Is the plant permanently retired or will it be permanently retired by December 31, 2011? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Stop) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STOP! IF YOU ANSWERED NO TO QUESTION A1-6, |
|
|
|
|
|
|
|
|
|
DO NOT COMPLETE THE REMAINDER OF THIS QUESTIONNAIRE. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
Does the plant generate or have the potential to generate electricity from a steam electric generating unit (i.e., a generating unit that utilizes a thermal cycle employing the steam/water system as the thermodynamic medium (steam turbine))? [NOTE: Combined cycle systems with at least one associated steam turbine are considered steam electric generating units.] |
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
(Stop) |
|
|
|
|
|
|
|
|
|
|
|
|
STOP! IF YOU ANSWERED NO TO QUESTION A1-7, |
|
|
|
|
|
|
|
|
|
DO NOT COMPLETE THE REMAINDER OF THIS QUESTIONNAIRE. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A1-8. |
Indicate all of the fossil or nuclear fuels that the plant used to generate electricity in 2009 (refer to Table A-17 for a further breakdown of fossil-type fuels in the "Type of Fuel" tab). [NOTE: Do NOT include fuels only used for start up when answering this question.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STOP! IF YOU ANSWERED NONE IN QUESTION A1-8, |
|
|
|
|
|
|
|
|
|
DO NOT COMPLETE THE REMAINDER OF THIS QUESTIONNAIRE. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A1-9. |
Identify how the plant uses/handles the electricity generated and indicate the percent of electricity by end use/handling. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If “Other” was selected, use the yellow space below to provide a description of electricity end use/handling. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
Provide the primary, secondary, and tertiary six-digit North American Industry Classification System (NAICS) codes that best describe the plant’s activities. Refer to the U.S. Census Bureau’s website to identify appropriate NAICS codes (http://www.census.gov/eos/www/naics/). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Primary NAICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Secondary NAICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tertiary NAICS: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-11. |
Is the generation of electricity the primary purpose (i.e., the predominant source of revenue and principal reason for operation) of the plant? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STOP! IF YOU ANSWERED NO IN QUESTION A1-11, |
|
|
|
|
|
|
|
|
|
DO NOT COMPLETE THE REMAINDER OF THIS QUESTIONNAIRE. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-12. |
Identify how the plant uses the steam and other forms of useful thermal energy (e.g., heat) generated at the plant and indicate the percent of steam by use. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If “Other” was selected, use the space below to provide a description of the use for steam. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A1-13. |
Provide the total plant nameplate electric generating capacity and the total electric net summer and winter capacities. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nameplate capacity |
|
MW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net summer capacity |
|
MW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net winter capacity |
|
MW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A1-14. |
In Table A-1, provide the total net and gross electrical generation for all electric generating units at the plant during calendar years 2007 through 2009. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-1. Net and Gross Plant Electrical Generation for 2007-2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Calendar Year |
Net Electrical Generation (MW-hrs) |
Gross Electrical Generation (MW-hrs) |
|
|
|
|
|
|
2007 |
|
MW-hrs |
|
MW-hrs |
|
|
|
|
|
|
2008 |
|
MW-hrs |
|
MW-hrs |
|
|
|
|
|
|
2009 |
|
MW-hrs |
|
MW-hrs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
Section Title: |
2.1. Plant Identification and Information on Permits and Studies |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 2.1 (Question A2-1 to A2-4), provide information requested on plant identity, permits, and studies. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A2-1. |
Provide the identification code of this plant as reported on U.S. DOE/EIA Form-860 (2007), "Annual Electric Generator Report," schedule 2, line 1. |
|
|
|
|
|
|
|
|
|
|
|
|
EIA Plant Identification Code: |
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A2-2. |
Provide the identification code of this plant as used when reporting to the Rural Utilities Service (RUS). |
|
|
|
|
|
|
|
|
|
|
|
|
RUS Plant Identification Code: |
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A2-3. |
Did the plant conduct any Environmental Assessment (EA) or Environmental Impact Statement (EIS) studies on receiving waters or pond/impoundments reported in Table A-4? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Question A2-4) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If yes, please attach results from the study(ies). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A2-4. |
In Table A-2, provide a list of the plant’s most recently approved permits that are associated with industrial activities. If the plant has more than one ID for a permit type, list all IDs in the space provided. Also indicate if the plant has a new/pending permit under development. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Note: Do NOT include the following types of permits: permits required for construction of wastewater and/or sanitary sewage facilities, erosion and sediment control permits associated with construction activities, temporary and general permits for hydrostatic testing water, water obstruction and encroachment permits, and/or water allocation permits. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-2. Permit Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Permit Type |
Permit ID(s) |
Approval Date |
Expiration Date |
New/Pending Permit is Under Development |
|
|
|
|
Month |
Year |
Month |
Year |
|
|
|
|
National Pollutant Discharge Elimination System (NPDES) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Resource Conservation and Recovery Act (RCRA) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Stormwater |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Air Pollution Operating |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Underground Injection Control (UIC) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If the plant does not have a NPDES permit, skip to Section 3. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
Outfall Number: |
Insert Outfall Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
Section Title: |
2.2. Outfall Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 2.2 (Question A2-5 to A2-10), provide information for all internal and final outfalls designated in the plant's NPDES permit. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Make copies of Section 2.2 for each outfall designated in the plant's NPDES permit using the "Copy Section 2.2" button below. Enter the outfall number in the space provided above. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A2-5. |
Provide the name, latitude/longitude, the typical volume of discharge in 2009 (either gpd and gpy OR gpm and hpd if flow is intermittent), and the number of days of discharge in 2009 for the outfall. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Outfall Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinates |
Degrees |
Minutes |
Seconds |
|
|
|
|
|
|
|
Latitude |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Longitude |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Discharge Flow: |
|
gpd |
|
gpm |
|
|
|
|
|
|
|
|
and |
|
and |
|
|
|
|
|
|
|
|
gpy OR |
|
hpd |
|
|
|
|
|
|
|
|
and |
|
and |
|
|
|
|
|
|
|
|
dpy |
|
dpy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A2-6. |
Identify if the outfall is an internal or final outfall. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 3) |
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A2-7. |
Does the outfall release water to a discharge canal prior to discharging to surface water? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A2-8. |
Provide the receiving surface water name and type of surface water. If the receiving surface water is unnamed, provide the name(s) of the next receiving water downstream with a designated name. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Receiving Surface Water Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Type of Surface Water: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If the receiving surface water is unnamed, provide the name(s) of the next receiving water downstream with a designated name. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A2-9. |
Has a mixing zone been applied to the outfall? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A2-10. |
In Table A-3, provide the percent contribution that each wastewater listed has to the total outfall flow. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-3. Wastewaters Discharged Through Outfall |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wastewater |
Percent Contribution of Outfall Flow |
|
|
|
|
|
Cooling Water |
|
|
|
|
|
|
Fly Ash Sluice |
|
|
|
|
|
|
Bottom Ash Sluice |
|
|
|
|
|
|
FGD Scrubber Wastewater (slurry blowdown or scrubber purge) |
|
|
|
|
|
|
Leachate from Coal Combustion Residue Landfills or Ponds/Impoundments |
|
|
|
|
|
|
Coal Pile Runoff |
|
|
|
|
|
|
|
|
|
|
Metal Cleaning Waste |
|
|
|
|
|
|
|
|
|
|
Other |
|
|
|
|
|
|
Total |
100% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
3. Ponds/Impoundments |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 3 (Questions A3-1 to A3-3), provide information for all ponds/impoundments the plant has or is currently constructing/installing or planning to construct/install by December 31, 2020. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Does the plant have or is the plant currently constructing/installing or planning to construct/install by December 31, 2020 any ponds/impoundments used for the storage, treatment, and/or disposal of process wastewater, residues, or by-products (including sludge or water streams containing residues or by-products)?
|
|
|
|
|
Note: This includes ponds/impoundments located on non-adjoining property that are under the operational control of the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 4) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Table A-4 below list all pond/impoundment units located at the plant, or pond/impoundments the plant is currently constructing/installing or planning to construct/install by December 31, 2020, including those located on non-adjoining property, used for storage, treatment, and/or disposal of process wastewater, residues, or by-products (including sludge or water streams containing residues or by-products). For each pond/impoundment unit, EPA assigned an ID number (e.g., SPD-1, SPD-2) in Table A-4, which will be used throughout the remainder of the survey. In the “Plant Designation” column, provide the plant’s name for each pond/impoundment unit. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additionally, provide the latitude and longitude at the pond outlet (see glossary), the closest distance from the pond/impoundment unit to the nearest surface water, the year the pond/impoundment unit was brought online (or is planned to be brought online), and indicate whether the pond/impoundment is lined or unlined and whether leachate (see glossary) is collected from the pond/impoundment (i.e. the pond/impoundment has a leachate collection system). Note: If the pond/impoundment does not have a pond outlet, provide the latitude and longitude corresponding to the emergency outlet for the pond/impoundment. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-4. Identification of Plant Pond/Impoundment Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pond/ Impoundment Unit ID |
Plant Designation |
Latitude and Longitude at Pond Outlet |
Is the Pond Lined? |
Is Leachate (including Leaks or Seepage) Collected? |
Closest Distance to Nearest Surface Water |
Year Initially Brought Online Or Planned to be Brought Online |
Is the Pond/ Impoundment Inactive? |
|
|
|
|
|
deg |
min |
sec |
(ft) |
|
|
|
|
Active/Inactive/Open Pond/Impoundment Units |
|
|
|
|
|
SPD-1 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-2 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-3 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-4 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-5 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-6 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-7 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-8 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-9 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-10 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-11 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-12 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-13 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-14 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Retired/Closed Pond/Impoundment Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-SPD-1 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-SPD-2 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-SPD-3 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-SPD-4 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Pond/Impoundment Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-A |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-B |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-C |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-D |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SPD-E |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A3-3. |
In Table A-5 below, indicate all process wastewater, residues, or by-products (or sludges or water streams containing the wastes, residues or by-products) that are stored, treated, and/ or disposed of in each pond/impoundment unit identified in Table A-4. [Check all boxes that apply.] For solid waste and process wastewater not listed in the checkboxes or the drop down menu provide the name and description in the yellow box provided. Do not include treatment chemicals that are added to the pond/impoundment. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-5. Wastes Stored or Disposed of in Plant Pond/Impoundment Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Pond/ Impoundment Unit ID |
Solid Waste |
Process Wastewater |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
|
|
|
Other, specify: |
|
Other, specify: |
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
4. Landfills |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 4 (Questions A4-1 to A4-3), provide information for landfills (see glossary) the plant has or is currently constructing/installing or planning to construct/install by December 31, 2020. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A4-1. |
Does the plant have or is the plant currently constructing/installing or planning to construct/install by December 31, 2020 any landfills used for the storage or disposal of process wastewater, residues, or by-products?
|
|
|
|
Note: This includes landfills located on non-adjoining property that are under the operational control of the plant. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 5) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A4-2. |
In Table A-6 below, list all landfills located at the plant, or landfills the plant is currently constructing/installing or planning to construct/install by December 31, 2020, including those located on non-adjoining property, used for storage or disposal of process wastewater, residues or by-products. For each landfill, EPA assigned an ID number (e.g., LANDFILL-1, LANDFILL-2) in Table A-6, which will be used throughout the remainder of the survey. In the “Plant Designation” column, provide the plant’s name for each landfill. Additionally, provide the latitude and longitude at the center of the landfill, the closest distance from the landfill to the nearest surface water, the year the landfill was brought online (or is planned to be brought online), and indicate whether the landfill is lined or unlined and whether leachate is collected from the landfill (i.e. the landfill has a leachate collection system). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-6. Identification of Plant Landfills |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Landfill ID |
Plant Designation |
Latitude and Longitude at Center of Landfill |
Is the Landfill Lined? |
Is Leachate Collected? |
Closest Distance to Nearest Surface Water (ft) |
Year Initially Brought Online Or Planned to be Brought Online |
Is the Landfill Inactive? |
|
|
|
|
deg |
min |
sec |
|
|
|
Active/Inactive/Open Landfills |
|
|
|
|
LANDFILL-1 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-2 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-3 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-4 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Retired/Closed Landfills |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-LANDFILL-1 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-LANDFILL-2 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-LANDFILL-3 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
RET-LANDFILL-4 |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Landfills |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-A |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-B |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-C |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
LANDFILL-D |
|
Lat: |
|
|
|
|
|
|
|
|
|
|
|
Long: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A4-3. |
In Table A-7 below, indicate all process wastewater, residues or by-products that are stored or disposed of in each landfill identified in Table A-6. [Check all boxes that apply.] For solid waste not listed in the checkboxes provide the name and description in the yellow box provided. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-7. Wastes Stored or Disposed of in Landfills |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Landfill ID |
Waste Stored or Disposed of in Landfill |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
|
Other, specify: |
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
Section Title: |
5. Plant Property and Water Balance |
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 5 (Questions A5-1 to A5-3), provide information requested on plant property and water balance. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A5-1. |
If not already reported to EIA on U.S. DOE/EIA Form-860 (2007), schedule 2, line 6, provide the geographical coordinates of the plant (degrees, minutes, seconds). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinate |
Degrees |
Minutes |
Seconds |
|
|
|
|
|
Latitude |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Longitude |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
Attach an aerial map showing the property boundary of the plant. Provide as many maps as necessary. Number each map diagram in the upper right corner; the first map should be numbered MAP-1, the second MAP-2, etc. Include the plant name and plant ID in the upper right hand corner of each diagram. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
Attach a water balance diagram for the plant that shows all sources of water, plant process operations, process wastewaters generated and how they are handled/treated, flow rates of all water streams, and all outfalls at the plant. Specific instructions for the diagram are provided in the checklist below. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTE: You may use an existing diagram, such as a water balance diagram included in the plant’s NPDES Form 2C, and mark the additional required information on the diagram by hand. You may also use a diagram from previous years as long as the diagram is still representative of current operations. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide as many diagrams as necessary to convey the information requested in the checklist below. Number each block diagram in the upper right corner; the first block diagram should be numbered WB-1, the second WB-2, etc. Include the plant name and plant ID in the upper right hand corner of the diagram. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Block Diagram Checklist |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mark the boxes below to verify that you have completed each checklist item... |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Include the water balance diagram number, plant name, and plant ID on the diagram. |
|
|
|
|
|
|
|
|
|
|
|
|
Include each steam electric generating unit on the diagram. Represent all steam electric generating units as a block or other shape. Use EPA-assigned numbers designated in Table A-8 in the tab "Part A Section 6" to label the units. |
|
|
|
|
|
|
|
|
|
|
|
|
Show and label all process operations, using EPA-assigned numbers from this and other parts of the questionnaire if applicable. If a process operation does not have an EPA-assigned number, use the plant-designated name for the process operation. |
|
|
|
|
|
|
|
|
|
|
|
|
Show and label all water sources (e.g., lakes and rivers), process wastewater generated by each steam electric generating unit and process operation, and outfalls. Use the codes provided in the Codes Tables tab. Effluent streams may include process wastewater and sludges. |
|
|
|
|
|
|
|
|
|
|
|
|
Identify all wastewater treatment systems used to treat the process wastewaters generated by the steam electric generating units. Represent the wastewater treatment systems as a block or other shape. Use EPA-assigned numbers from other parts of the questionnaire if applicable. If the wastewater treatment system does not have an EPA-assigned number, use the plant-designated name for the wastewater treatment system. |
|
|
|
|
|
|
|
|
|
|
|
|
Identify the final destination of the treated wastewater and process wastewater (e.g., treated wastewater effluent to POTW or surface waters; solid wastes to on- or off-site destinations). Use codes provided in the Codes Table tab. |
|
|
|
|
|
|
|
|
|
|
|
|
Indicate, as appropriate, where treated wastewater is reused or recycled within the plant (e.g., reuse of settling pond/impoundment water as fly ash sluice). |
|
|
|
|
|
|
|
|
|
|
|
|
Identify all outfall locations. Include NPDES permit outfall numbers, if applicable. |
|
|
|
|
|
|
|
|
|
|
|
|
Provide the typical flow rates for all streams on the diagram (in gpm or gpd). If the wastewater stream is intermittent, provide amount and frequency; for example “100 gal, twice/day, 100 dpy” or “1000 gpm, 4 hpd, 365 dpy”. For sludges, provide amount in tpd. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If you believe that the diagram should be treated as confidential, stamp it "Confidential" or write "Confidential" or "CBI" across the top. If any diagram is not marked "Confidential", it will be considered nonconfidential under 40 CFR Part 2, Subpart B. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Review: |
|
|
|
|
|
|
If any of the statements above were not checked, revise the block diagram(s) and ensure all statements have been checked. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
6. Steam Electric Generating Unit Information |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 6 (Questions A6-1 to A6-2), provide information requested on each steam electric generating unit that the plant has operated or any steam electric generating units the plant is currently constructing/installing or planning to construct/install by December 31, 2015. Plants do NOT need to include information on units retired before December 31, 2008. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
In Table A-8, provide information for each steam electric generating unit that the plant operated any time PRIOR to December 31, 2009. Plants do NOT need to include information on units retired before December 31, 2008. For combined cycle systems, provide EIA Generator IDs for all steam and combustion turbines associated with the combined cycle system. Provide the electric generation for the entire combined cycle system in 2009. In the “Type of Unit” column, if you indicate “Other”, provide an explanation in the Comments page. See the glossary for definitions of base load, peaking, cycling, and intermediate. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-8. Steam Electric Units Operated Prior to December 31, 2009 |
|
|
|
|
Steam Electric Unit |
EIA Generator ID |
Operated in 2009 |
Type of Steam Electric Prime Mover (or Turbine) |
Total Unit Electric Generation in 2009 (MW-hrs) |
Total Unit Nameplate Capacity |
Type of Unit |
Is this Unit Now Retired? |
|
|
|
|
Steam Turbine Capacity (MW) |
Combustion Turbine Capacity (MW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Days of operation: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-7 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A6-2. |
In Table A-9, provide information for each steam electric generating unit that the plant operated AFTER January 1, 2010 or the plant is currently constructing/installing or planning to construct/install by December 31, 2015. For combined cycle systems, provide EIA Generator IDs for all steam and combustion turbines associated with the combined cycle system and provide the total capacity for all steam turbines and combustion turbines separately (i.e., sum the respective capacity for all steam turbines and combustion turbines associated with the combined cycle system). In the "Type of Boiler or Reactor" column, check all that apply. In the “Type of Unit” column, if you indicate “Other”, provide an explanation in the Comments page. See the glossary for definitions of base load, peaking, cycling, and intermediate. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-9. Steam Electric Generating Units First Operated After January 1, 2010 or Planned Steam Electric Generating Units |
|
|
|
|
|
|
|
Steam Electric Unit |
EIA Generator ID (if applicable) or Plant Designation |
Type of Boiler or Reactor [check all that apply] |
Type of Steam Electric Prime Mover (or Turbine) |
Initial Date of Operation or Planned Date of Operation |
Total Unit Nameplate Capacity |
Type of Unit |
|
|
|
|
|
|
|
Month |
Year |
Steam Turbine Capacity (MW) |
Combustion Turbine Capacity (MW) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit-D |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
7. Condenser Cooling Water Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 7 (Questions A7-1 to A7-2), provide information requested for all condenser cooling water systems currently operating at the plant and any condenser cooling water systems the plant is currently constructing/installing or planning to construct/install by December 31, 2015. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A7-1. |
In Table A-10, provide information for all condenser cooling water systems currently operating at the plant and any condenser cooling water systems the plant is currently constructing/installing or planning to construct/install by December 31, 2015. Indicate the type of condenser cooling system and the specific steam electric generating units that the system cools. [Check all boxes that apply.] If the plant adds chemicals to the condenser cooling system, provide the chemical trade name, manufacturer, and active ingredient(s). If there is more than one active ingredient in the chemical additive, include all of them in the yellow box provided. Separate multiple entries with commas. Enter the typical amount of process wastewater generated or blown down from the cooling water system and the typical duration and frequency of generation or blow down. For planned cooling systems, provide this information to the extent known. Also enter the date that the cooling water system was initially brought on line or is planned to be brought on line. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-10. Condenser Cooling Systems for All Steam Electric Generating Units |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Cooling System ID |
Type of Condenser Cooling System |
Steam Electric Units that the System Cools (check all boxes that apply) |
Chemical Additives Added to the Cooling System and Make-up Water System |
Typical Amount of Process Wastewater Generated/Blow Down from Cooling System (gpm) |
Typical Duration AND Frequency of Generation/ Blowdown (hpd AND dpy) |
|
|
|
|
|
Trade Name |
Manufacturer |
Active Ingredient(s) |
|
|
|
|
|
Operating Condenser Cooling Water Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-1 |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-2 |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-3 |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Cooling Water Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-A |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-B |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CS-C |
|
|
|
|
|
gpm |
|
dpy |
|
|
|
|
|
|
Other: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A7-2. |
How did the plant demonstrate compliance with limits on priority pollutants for cooling tower blowdown from these cooling systems? [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
SE Unit ID: |
Insert SE Unit ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
Section Title: |
8. Fuel Usage by Steam Electric Generating Unit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
In Section 8 (Question A8-1), provide information for all steam electric generating units that were operated in 2009, including units that operated for only part of 2009 (i.e., those units for which you responded "Yes" in Question A6-1, Table A-8, "Operated in 2009" column). Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Make copies of Section 8 for each steam electric generating unit ID operated in 2009 using the "Copy Section 8" button below. Enter the steam electric generating unit ID (use unit IDs assigned in Table A-8) in the space above titled "SE Unit ID". |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
In Table A-11, provide the types and amounts of fuels used in 2009. [Check all boxes that apply.] Include fuels used for start up. Also provide the BTU generated by each general fuel type reported for the year 2009. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-11. Fuel Usage for Steam Electric Power Generation in 2009 |
|
|
|
Fossil/Nuclear Fuels |
|
|
|
Coal and Petroleum Coke |
Gas |
Oil |
Nuclear |
|
|
|
BTU Generated by Coal and/or Petroleum Coke |
|
BTU Generated by Gas |
|
BTU Generated by Oil |
|
BTU Generated by Nuclear Fuels |
|
|
|
|
Type |
Amount (tons) |
Type |
Amount (Million ft3) |
Type |
Amount (barrels) |
Type |
Amount |
Units (Specify) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Fuels (i.e., Fuels other than Fossil or Nuclear) |
|
|
|
Type |
Amount |
Units (Specify) |
Type |
Amount |
Units (Specify) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Total BTU Generated by All Fuels |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A8-2. |
Do the total BTUs generated by the fossil/nuclear fuels comprise 50 percent or more of the total BTUs generated by all fuels for the steam electric generating unit in 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A8-3. |
Did the plant report a fossil or nuclear fuel as the predominant or second most predominant energy source for this generating unit on Form EIA-860 for reporting year 2009? NOTE: This information is reported in Schedule 3, Part B, lines 9 and 11. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NOTE: IF ALL STEAM ELECTRIC GENERATING UNITS IDENTIFIED IN TABLE A-8 ARE CLASSIFIED AS "OTHER ELECTRIC GENERATING UNITS" (BASED ON THE CLASSIFICATION DETERMINED FROM QUESTIONS A8-2 AND A8-3), DO NOT COMPLETE THE REMAINDER OF THIS QUESTIONNAIRE. |
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
9. NOx Control Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 9 (Questions A9-1 to A9-11), provide information for all NOx control systems operated on fossil-fueled electric generating units after January 1, 2009 and all NOx control systems the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. See Part A Section 8 for unit classifications. You will need to indicate the steam electric generating units that are serviced by these air pollution control systems. Use codes from Table A-8 or Table A-9 to designate the SE Unit ID. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-1. |
Did the plant operate any NOx control systems on fossil-fueled electric generating units after January 1, 2009 or is the plant currently constructing/installing or planning to construct/install any NOx control system on fossil-fueled electric generating units by December 31, 2020? See Part A Section 8 for unit classifications. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Complete Table A-12) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 10) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Table A-12, provide information for NOx control systems that the plant has used, is currently constructing/installing, or planning to construct/install by December 31, 2020 on each operating or planned fossil-fueled electric generating unit (identified in Table A-8 or Table A-9). Provide the steam electric generating unit ID (use codes from Table A-8 or Table A-9), the type of NOx control system(s) operating or planned for the steam electric generating unit, whether the NOx control system(s) are operating or planned, and the date the NOx control was/will be installed. In addition, for the steam electric generating units serviced by a SCR system, identify the date and location (i.e., on- or off-site) of the last and next SCR catalyst replacement/regeneration. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-12. NOx Control Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
SE Unit ID |
Type of NOx Control System |
Status of NOx Control System |
Date of Installation, Previous or Planned |
For Steam Electric Generating Units Serviced by a SCR System |
|
|
|
Date of Last SCR Catalyst Replacement or Regeneration |
Where Last SCR Catalyst Regeneration Occurred |
Date of Next Planned SCR Catalyst Replacement or Regeneration |
Where Next SCR Catalyst Regeneration is Planned to Occur |
|
|
|
Month |
Year |
Month |
Year |
Month |
Year |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A9-2. |
If the plant has sent an SCR catalyst off site for regeneration, provide the company name, location, and phone number for the company(ies) that performed the last two SCR catalyst regenerations. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-13. Companies that performed the last two SCR catalyst regenerations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Company Name |
City |
State |
Telephone Number |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A9-3. |
If the SCR catalyst is regenerated on site, indicate whether process wastewater is generated from the regeneration process. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Question A9-7) |
|
|
|
|
|
|
|
|
|
(Skip to Question A9-7) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-4. |
Provide the typical volume of SCR catalyst regeneration wastewater generated (gpy) and the frequency at which the process wastewater is generated. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpy |
|
times every |
|
|
year(s) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-5. |
Is the SCR catalyst regeneration wastewater commingled with other wastewaters? If yes, indicate the wastewaters with which the SCR catalyst regeneration wastewater is commingled. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-6. |
What is the destination(s) of the SCR catalyst regeneration wastewater? If the plant recycles the process wastewater, indicate the plant process to which this process wastewater is recycled. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A9-7. |
Is the SCR catalyst washed on site? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 10) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A9-8. |
Is process wastewater generated from the SCR catalyst washing process? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 10) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A9-9. |
Provide the typical volume of SCR catalyst washing wastewater generated (gpy) and the frequency at which the process wastewater is generated. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpy |
|
times every |
|
|
year(s) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-10. |
Is the SCR catalyst washing wastewater commingled with other wastewaters? If yes, indicate the wastewaters with which the SCR catalyst washing wastewater is commingled. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A9-11. |
What is the destination(s) of the SCR catalyst washing wastewater? If the plant recycles the treated wastewater, indicate the plant process to which this waste is recycled. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
10. Flue Gas Mercury Control Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 10 (Questions A10-1 to A10-5), provide information for all flue gas mercury control systems (including those not currently operating) that are currently installed on fossil-fueled electric generating units and all systems the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. See Part A Section 8 for unit classifications. Do NOT include FGD, SCR/SNCR, and particulate matter control systems. You will need to indicate the steam electric generating units that are serviced by these air pollution control systems. Use codes from Table A-8 or Table A-9 to designate the SE Unit ID. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A10-1. |
Are there any flue gas mercury control systems (other than FGD, SCR/SNCR, or particulate matter control systems) installed on fossil-fueled electric generating units or is the plant currently constructing/installing or planning to construct/install any flue gas mercury control systems on fossil-fueled electric generating units by December 31, 2020? See Part A Section 8 for unit classifications. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Complete Table A-14) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Question A10-3) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Table A -14 provide information for all flue gas mercury control systems (other than FGD, SCR/SNCR, or particulate matter control systems) currently installed on fossil-fueled electric generating units (including those not currently operating) and all systems the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. Provide the type of mercury control system and the generating units that are or will be serviced by the system. [Check all boxes that apply.] For planned mercury control systems, provide the type of system it will be and all generating units that will be serviced by the system. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-14. Flue Gas Mercury Control Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mercury Control Systems |
Type of Mercury Control System |
Steam Electric Units that Exhaust to the System (Check all boxes that apply) |
Date of Installation, Previous or Planned |
Location of Mercury Control System in Relation to Initial Particulate Matter Control System |
Handling of Mercury Control Solid Waste |
Mercury Removal Efficiency (%) |
|
|
|
|
Month |
Year |
|
|
|
|
Currently Operating Flue Gas Mercury Control Systems |
|
|
|
|
|
|
|
|
|
|
FGMC-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FGMC-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FGMC-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FGMC-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Flue Gas Mercury Control Systems |
|
|
|
|
|
|
|
|
|
|
FGMC-A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FGMC-B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
FGMC-C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In the space below, provide a description of all flue gas mercury control system processes, the plant is currently operating, currently constructing/installing, or planning to construct/install by December 31, 2020. Include the solid wastes and process wastewater streams generated, the volume and characteristics (i.e., pollutants present) of the process wastewater generated, and any known or anticipated probable effect on other process wastewater (e.g., fly ash transport water). Additionally, indicate how the solid wastes and process wastewater from mercury control systems are/will be handled (e.g., are solid wastes combined with fly ash). Provide the final destination of all mercury control system wastes (e.g., sent to an ash pond or other impoundment, landfilled, or hauled off site). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A10-3. |
Has the plant ever operated or does it plan to operate a pilot-scale flue gas mercury control system for a pilot study evaluation? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 11) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Specify the type(s) of technology studied: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A10-4 |
Did the study evaluate process wastewaters generated by the technology or identify that process wastewater will be generated or affected by the technology? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 11) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A10-5 |
Provide the name of the company whose technology was/will be tested, the start and end date of the pilot study, and attach the final technical evaluation report from the pilot study (if study is complete). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Company Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Start Date: |
|
|
End Date: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
Section Title: |
11. Carbon Capture Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 11 (Questions A11-1 to A11-6), provide information for all carbon capture systems operated on fossil-fueled electric generating units after January 1, 2009 and all systems the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. See Part A Section 8 for unit classifications. Provide this information for both full-scale and pilot-scale systems. You will need to indicate the steam electric generating units that are serviced by these air pollution control systems. Use codes from Table A-8 or Table A-9 to designate the SE Unit ID. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A11-1. |
Did the plant operate any carbon capture systems on fossil-fueled electric generating units after January 1, 2009 or is the plant currently constructing/installing or planning to construct/install any carbon capture systems on fossil-fueled electric generating units by December 31, 2020? See Part A Section 8 for unit classifications. |
|
|
|
|
|
|
|
|
|
|
|
|
(Complete Table A-15) |
|
|
|
|
|
|
|
|
(Skip to Section 12) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Table A-15 provide information for carbon capture systems currently operating on fossil-fueled electric generating units at the plant and systems that the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. Provide the type of carbon capture system and the steam electric generating units that correspond to the system. [Check all boxes that apply.] For planned carbon capture systems, provide the type of system it will be and all steam electric generating units that will correspond to the system. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-15. Carbon Capture Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS Systems |
Type of Carbon Capture System |
Steam Electric Units Corresponding to the System (Check all boxes that apply). |
Date of Installation, Previous or Planned |
Full Scale or Pilot Scale |
Percent of Flue Gas Treated |
|
|
|
Month |
Year |
|
|
|
Currently Operating Carbon Capture Systems |
|
|
|
|
|
|
|
|
|
|
CCS-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Carbon Capture Systems |
|
|
|
|
|
|
|
|
|
|
CCS-A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS-B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CCS-C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
In the space below, provide a description of all full-scale and pilot-scale carbon capture system processes, previously tested, previously operated, currently operating, currently being constructed/installed, and/or planned to construct/install by December 31, 2020. Provide a general description of the system, including the specific list of types of chemicals and equipment used, the types of process wastewater generated, and any known or anticipated probable effect on other process wastewater streams (e.g., fly ash transport water). Additionally, indicate how the process wastewater streams from the carbon capture process were/will be managed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A11-3. |
Has the plant operated any full-scale or pilot-scale carbon capture systems for studies in which process wastewaters generated by the technology were evaluated? |
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
(Skip to Section 12) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A11-4. |
Provide the name of the company whose technology was tested, the start and end date of the study, and attach the final technical evaluation report from the study (if study is complete). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Company Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Start Date: |
|
|
End Date: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A11-5. |
Provide the typical volume of process wastewater generated from the carbon capture system (gpm) and the duration (hpd) and frequency (dpy) of carbon capture wastewater generation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpm |
|
hpd |
|
dpy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A11-6. |
Were characterization samples of the carbon capture wastewater collected during the study? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
(Skip to Section 12) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide the analytical results of the carbon capture wastewater characterization (if not already included in the technical report requested in Question A11-4). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
A |
|
|
|
|
|
|
|
|
|
|
|
Section Title: |
12. Wet Electrostatic Precipitator Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 12, provide information for all wet electrostatic precipitator (ESP) systems operated on fossil-fueled electric generating units after January 1, 2009 and all systems the plant is currently constructing/installing or planning to construct/install on fossil-fueled electric generating units by December 31, 2020. See Part A Section 8 for unit classifications. Provide this information for both full-scale and pilot-scale systems. You will need to indicate the steam electric generating units that are serviced by these air pollution control systems. Use codes from Table A-8 or Table A-9 to designate the SE Unit ID. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A12-1. |
Did the plant operate any wet ESP systems on fossil-fueled electric generating units after January 1, 2009 or is the plant currently constructing/installing or planning to construct/install any wet ESP systems on fossil-fueled electric generating units by December 31, 2020? See Part A Section 8 for unit classifications. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Complete Table A-16) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Section 13) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
In Table A-16 provide information for wet ESP systems currently operating at the plant that service fossil-fueled electric generating units and systems that the plant is currently constructing/installing or planning to construct/install to service fossil-fueled electric generating units by December 31, 2020. Provide the steam electric generating units that correspond to the system, the date the system was/is planned to be installed, the location of the system, whether it is a full-scale or pilot-scale system, and if it is a pilot-scale system, the percent of flue gas that is treated. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table A-16. Wet Electrostatic Precipitator Systems |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wet ESP System IDs |
Steam Electric Units Corresponding to the System (Check all boxes that apply). |
Date of Installation, Previous or Planned |
Location of Wet ESP System |
Full Scale or Pilot Scale |
Percent of Flue Gas Treated |
|
|
|
|
Month |
Year |
|
|
|
|
Currently Operating Wet ESP Systems |
|
|
|
|
|
|
|
|
|
|
|
WESP-1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WESP-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WESP-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WESP-4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Planned Wet ESP Systems |
|
|
|
|
|
|
|
|
|
|
|
WESP-A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WESP-B |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WESP-C |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A12-2. |
Provide the flow rate, duration, and frequency of the wastewater generated from the wet ESP system for calendar year 2009. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
hpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
dpy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A12-3. |
Provide the source of the water used in the wet ESP system. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other process wastewater, specify: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A12-4. |
For water sources that may be used in the wet ESP (e.g., fresh intake, recycled process water), indicate the maximum chlorides concentration and maximum solids percentage that is acceptable for the water to be used for those purposes. Identify any other criteria that the source water must meet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ppm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A12-5. |
Indicate the destination(s) of the wet ESP wastewater. If the plant recycles the wet ESP wastewater, indicate the plant process to which this water is recycled. [Check all that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A12-6. |
Has the plant operated any full-scale or pilot-scale wet ESP systems for studies in which process wastewaters generated by the technology were evaluated? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
(Skip to Section 13) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A12-7. |
Provide the name of the company whose technology was tested, the start and end date of the study, and attach the final technical evaluation report from the study (if study is complete). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Company Name: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Start Date: |
|
End Date: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A12-8. |
Were characterization samples of the wet ESP wastewater collected during the study? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
(Skip to Section 13) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide the analytical results of the wet ESP wastewater characterization (if not already included in the technical report requested in Question A12-7). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Plant ID: |
Insert Plant ID |
|
|
|
|
|
|
|
|
|
|
Plant Name: |
Insert Plant Name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Part: |
H |
|
|
|
|
|
|
|
|
|
|
Section Title: |
13. Coal Storage and Processing |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Instructions: |
Throughout Section 13 (Questions A13-1 to A13-17), provide information regarding the storage, processing, and use of coal for all steam electric generating units that were operated in 2009. Please provide all free response answers in the highlighted yellow areas. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-1. |
Did the plant store or process any coal on site in 2009? Processing coal includes any methods used to prepare the coal for use at the plant including but not limited to crushing/pulverizing coal. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
(Skip to Question A13-16) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
Provide the amount (gpy) and number of days of discharge of coal pile runoff in 2009. If there was no coal pile runoff discharge, enter “zero” and provide the reason in the Comments tab. The plant can estimate discharge of coal pile runoff, but a description of the estimation method must be included in the Comments tab. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpy |
|
number of days of discharge in 2009 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-3. |
Was the coal pile runoff monitored for pH? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
(Skip to Question A13-4) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
If yes, provide the pH range for the coal pile runoff generated at the plant (prior to any commingling with other water streams, including other stormwater). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
pH in coal pile runoff: |
Minimum: |
|
S.U. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Maximum: |
|
S.U. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Median: |
|
S.U. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-4. |
Is coal pile runoff transferred to a pond/impoundment? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-5. |
Indicate the destination(s) of the coal pile runoff. If the plant recycles the coal pile runoff, indicate the plant process to which the coal pile runoff is recycled. [Check all that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-6. |
Indicate whether the plant washes the coal on site. (See the definition for coal washing in the glossary for assistance). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
|
(Skip to Question A13-8) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide the average volume of coal wash water generated (gpm), the duration of water generation (hpd), and the frequency of water generation (dpy). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
gpm |
|
hpd |
|
dpy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
What is the destination(s) of the coal wash water? If the plant recycles the coal wash water, indicate the plant process to which this water is recycled. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A13-8. |
Did the plant blend more than one coal together on site during 2009? Blending is the act of intentionally mixing different coal types (e.g., bituminous and subbituminous) prior to combustion. Note that natural mixing of coal types that occurs in the coal piles does not constitute blending. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
(Skip to Question A13-10) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-9. |
Did the plant generate any process wastewater associated with the blending of the coals during 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
days |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-10. |
Did the plant pulverize coal for use in any boiler during 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
(Skip to Question A13-16) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-11. |
Was any water used in the coal pulverization process, other than that used to for sluicing mill rejects? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
(Skip to Question A13-12) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide the volume of coal pulverization process wastewater generated in 2009 (gpd OR gpy) and the frequency of this process wastewater generation (days). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
days |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-12. |
Were mill rejects sluiced in 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Continue) |
|
|
|
|
|
|
|
|
|
|
(Skip to Question A13-14) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Provide the volume of mill rejects sluice water generated in 2009 (gpd OR gpy) and the frequency of sluice water generation (days). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
days |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-13. |
Were the mill rejects sluiced separately or were they sluiced with fly and/or bottom ash? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-14. |
Are the mill rejects pyritic? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-15. |
Indicate how mill rejects are disposed of and provide amount(s). If the mill rejects are sent to a pond/impoundment, indicate whether they are combined with fly and/or bottom ash. [Check all boxes that apply.] |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
tpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
tpd |
|
|
|
|
|
|
|
|
tpd |
|
|
|
|
|
|
|
|
tpd |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI? |
A13-16. |
Did the plant gasify coal, petroleum coke, or oil to operate an IGCC generating unit during 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CBI?
|
A13-17. |
Is the plant currently operating, currently constructing/installing, or planning to construct/install by December 31, 2015 an IGCC generating unit that was not in operation during 2009? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Steam Electric Questionnaire |
|
|
|
Part A. Steam Electric Power Plant Operations |
|
|
|
|
|
|
|
Steam Electric Questionnaire Code Tables |
|
Process Wastewaters |
|
Treated Wastewaters |
|
For Use in Tables and Questions throughout Parts A, B, C, D, and F. |
|
For Use as Effluents from Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-4. |
|
Air heater cleaning water |
AHCW |
|
|
Ash pile runoff |
APR |
|
Effluent - 1 |
EFF-1 |
|
Boiler blowdown |
BB |
|
Effluent - 2 |
EFF-2 |
|
Boiler fireside cleaning water |
BFCW |
|
Effluent - 3 |
EFF-3 |
|
Boiler tube cleaning water |
BTCW |
|
Effluent - 4 |
EFF-4 |
|
Bottom ash sluice |
BAS |
|
Effluent - 5 |
EFF-5 |
|
Carbon capture wastewater |
CCAPW |
|
Effluent - 6 |
EFF-6 |
|
Coal pile runoff |
CPR |
|
Filter backwash |
FltBW |
|
Combined ash sluice |
CAS |
|
Sludge |
SLDG |
|
Combustion turbine cleaning (combustion gas portion of turbine) water |
COMBCW |
|
For Use as Influents to Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-3, AND Recycled Waters Throughout Questionnaire. |
|
Combustion turbine cleaning (compressor portion of the turbine) water |
COMPRCW |
|
POND-1 Effluent |
POND-1-EFF |
|
Combustion turbine evaporative coolers blowdown |
TECB |
|
POND-2 Effluent |
POND-2-EFF |
|
Cooling tower blowdown |
CTB |
|
POND-3 Effluent |
POND-3-EFF |
|
FGD scrubber purge |
SCRBP |
|
POND-4 Effluent |
POND-4-EFF |
|
FGD slurry blowdown |
FGDB |
|
POND-5 Effluent |
POND-5-EFF |
|
Filter Backwash |
FLTBW |
|
POND-6 Effluent |
POND-6-EFF |
|
Floor drain wastewater |
FDW |
|
POND-7 Effluent |
POND-7-EFF |
|
Flue gas mercury control system wastewater |
FGMCW |
|
POND-8 Effluent |
POND-8-EFF |
|
Fly ash sluice |
FAS |
|
POND-9 Effluent |
POND-9-EFF |
|
General runoff |
GR |
|
POND-10 Effluent |
POND-10-EFF |
|
Gypsum pile runoff |
GPR |
|
POND-A Effluent |
POND-A-EFF |
|
Gypsum wash water |
GYPWW |
|
POND-B Effluent |
POND-B-EFF |
|
Ion exchange wastewater |
IXW |
|
POND-C Effluent |
POND-C-EFF |
|
Landfill runoff - capped landfill |
LRC |
|
WWT-1 Effluent |
WWT-1-EFF |
|
Landfill runoff - uncapped landfill |
LRUC |
|
WWT-2 Effluent |
WWT-2-EFF |
|
Leachate |
LEACH |
|
WWT-3 Effluent |
WWT-3-EFF |
|
Limestone pile runoff |
LPR |
|
WWT-4 Effluent |
WWT-4-EFF |
|
Mill reject sluice |
MRS |
|
WWT-5 Effluent |
WWT-5-EFF |
|
Process Wastewaters |
|
Treated Wastewaters |
|
For Use in Tables and Questions throughout Parts A, B, C, D, and F. |
|
For Use as Influents to Pond/Impoundment Systems and/or Wastewater Treatment Systems in Part D, Table D-3, AND Recycled Waters Throughout Questionnaire. |
|
Once -through cooling water |
CW |
|
WWT-6 Effluent |
WWT-6-EFF |
|
Reverse osmosis reject water |
RORW |
|
WWT-A Effluent |
WWT-A-EFF |
|
SCR catalyst regeneration wastewater |
SCRRW |
|
WWT-B Effluent |
WWT-B-EFF |
|
SCR catalyst washing wastewater |
SCRWW |
|
WWT-C Effluent |
WWT-C-EFF |
|
Soot blowing wash water |
SOOTW |
|
|
|
|
Steam turbine cleaning water |
STCW |
|
|
|
|
Yard drain wastewater |
YARDW |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wastewater Treatment Units |
|
Destinations |
|
For Use in Tables and Questions Throughout Parts D and F. |
|
For Use in Tables and Questions Throughout Parts A, C, D, and F. |
|
Adsorptive media |
ADSORB |
|
Burned on site |
BURN |
|
Aerobic Biological Reactor |
AERBIO |
|
Deep-well injection |
DWELL |
|
Anaerobic Biological Reactor |
ANBIO |
|
Discharge to POTW |
POTW |
|
Aerobic/Anaerobic Biological Reactor |
AER/ANBIO |
|
Discharge to PrOTW |
PrOTW |
|
Chemical Precipitation Reaction Tank 1 - 1 |
CP-1-1 |
|
Discharge to surface water |
SW |
|
Chemical Precipitation Reaction Tank 1 - 2 |
CP-1-2 |
|
Evaporation |
EVAP |
|
Chemical Precipitation Reaction Tank 2 - 1 |
CP-2-1 |
|
Hauled off site for reuse (removal fee) |
HAULR - RF |
|
Chemical Precipitation Reaction Tank 2 - 2 |
CP-2-2 |
|
Hauled off site for reuse (given away) |
HAULR - GA |
|
Chemical Precipitation Reaction Tank 3 - 1 |
CP-3-1 |
|
Hauled off site for reuse (marketed and sold) |
SOLD |
|
Chemical Precipitation Reaction Tank 3 - 2 |
CP-3-2 |
|
Hauled off site for disposal |
HAUL |
|
Clarification, Primary - 1 |
CL-P-1 |
|
Mixed with fly ash for disposal |
MFA |
|
Clarification, Primary - 2 |
CL-P-2 |
|
On-site landfill (as reported in Table A-6) |
LANDF |
|
Clarification, Secondary - 1 |
CL-S-1 |
|
POND-1 |
POND-1 |
|
Clarification, Secondary - 2 |
CL-S-2 |
|
POND-2 |
POND-2 |
|
Clarification, Tertiary - 1 |
CL-T-1 |
|
POND-3 |
POND-3 |
|
Clarification, Tertiary - 2 |
CL-T-2 |
|
POND-4 |
POND-4 |
|
Constructed wetland - Cell 1 |
CWL -1 |
|
POND-5 |
POND-5 |
|
Constructed wetland - Cell 2 |
CWL -2 |
|
POND-6 |
POND-6 |
|
Constructed wetland - Cell 3 |
CWL -3 |
|
POND-7 |
POND-7 |
|
Constructed wetland - Cell 4 |
CWL -4 |
|
POND-8 |
POND-8 |
|
Constructed wetland - Cell 5 |
CWL -5 |
|
POND-9 |
POND-9 |
|
Constructed wetland - Cell 6 |
CWL -6 |
|
POND-10 |
POND-10 |
|
Constructed wetland system |
CWTS |
|
POND-A |
POND-A |
|
Equalization, Primary |
EQ-P |
|
POND-B |
POND-B |
|
Equalization, Secondary |
EQ-S |
|
POND-C |
POND-C |
|
Filter, Microfiltration - 1 |
FLT-M-1 |
|
WWT-1 |
WWT-1 |
|
Filter, Microfiltration - 2 |
FLT-M-2 |
|
WWT-2 |
WWT-2 |
|
Wastewater Treatment Units |
|
Destinations |
|
For Use in Tables and Questions Throughout Parts D and F. |
|
For Use in Tables and Questions Throughout Parts A, C, D, and F. |
|
Filter, Microfiltration - 3 |
FLT-M-3 |
|
WWT-3 |
WWT-3 |
|
Filter, Microfiltration - 4 |
FLT-M-4 |
|
WWT-4 |
WWT-4 |
|
Filter, Sand/Gravity - 1 |
FLT-S-1 |
|
WWT-5 |
WWT-5 |
|
Filter, Sand/Gravity - 2 |
FLT-S-2 |
|
WWT-6 |
WWT-6 |
|
Filter, Sand/Gravity - 3 |
FLT-S-3 |
|
WWT-A |
WWT-A |
|
Filter, Sand/Gravity - 4 |
FLT-S-4 |
|
WWT-B |
WWT-B |
|
Filter, Ultrafiltration - 1 |
FLT-U-1 |
|
WWT-C |
WWT-C |
|
Filter, Ultrafiltration - 2 |
FLT-U-2 |
|
Reuse as boiler water |
RECYC - BW |
|
Filter, Ultrafiltration - 3 |
FLT-U-3 |
|
Reuse as bottom ash sluice |
RECYC - BAS |
|
Filter, Ultrafiltration - 4 |
FLT-U-4 |
|
Reuse as combined ash sluice |
RECYC - CAS |
|
Filter press - 1 |
FP-1 |
|
Reuse as FGD slurry preparation water |
RECYC - FGDP |
|
Filter press - 2 |
FP-2 |
|
Reuse as FGD absorber makeup |
RECYC - FGDAB |
|
Holding tank |
HT |
|
Reuse as fly ash sluice |
RECYC - FAS |
|
Ion exchange |
IX |
|
Reuse as mill reject sluice |
RECYC - MRS |
|
Natural wetlands |
NW |
|
Reuse in cooling towers |
RECYC - CW |
|
pH adjustment - 1 |
PH-1 |
|
|
|
|
pH adjustment - 2 |
PH-2 |
|
|
|
|
pH adjustment - 3 |
PH-3 |
|
|
|
|
Reverse osmosis |
ROS |
|
|
|
|
Pond Unit - 1 |
SPD-1 |
|
|
|
|
Pond Unit - 2 |
SPD-2 |
|
|
|
|
Pond Unit - 3 |
SPD-3 |
|
|
|
|
Pond Unit - 4 |
SPD-4 |
|
|
|
|
Pond Unit - 5 |
SPD-5 |
|
|
|
|
Pond Unit - 6 |
SPD-6 |
|
|
|
|
Pond Unit - 7 |
SPD-7 |
|
|
|
|
Pond Unit - 8 |
SPD-8 |
|
|
|
|
Pond Unit - 9 |
SPD-9 |
|
|
|
|
Wastewater Treatment Units |
|
Solids Handling |
|
For Use in Tables and Questions Throughout Parts D and F. |
|
For Use as Planned Solids Handling for the FGD Slurry Blowdown in Part B Table B-2. |
|
Pond Unit - 10 |
SPD-10 |
|
Centrifuge - 1 |
CENT-1 |
|
Pond Unit - 11 |
SPD-11 |
|
Centrifuge - 2 |
CENT-2 |
|
Pond Unit - 12 |
SPD-12 |
|
Centrifuge - 3 |
CENT-3 |
|
Pond Unit - 13 |
SPD-13 |
|
Centrifuge - 4 |
CENT-4 |
|
Pond Unit - 14 |
SPD-14 |
|
Hydrocyclones - 1 |
HYC-1 |
|
Settling tank - 1 |
ST-1 |
|
Hydrocyclones - 2 |
HYC-2 |
|
Settling tank - 2 |
ST-2 |
|
Hydrocyclones - 3 |
HYC-3 |
|
Settling tank - 3 |
ST-3 |
|
Hydrocyclones - 4 |
HYC-4 |
|
Settling tank - 4 |
ST-4 |
|
Filter press - 1 |
FP-1 |
|
Settling tank - 5 |
ST-5 |
|
Filter press - 2 |
FP-2 |
|
Thickener - 1 |
TH-1 |
|
Thickener - 1 |
TH-1 |
|
Thickener - 2 |
TH-2 |
|
Thickener - 2 |
TH-2 |
|
Vacuum drum filter - 1 |
VF-1 |
|
Vacuum drum filter - 1 |
VF-1 |
|
Vacuum drum filter - 2 |
VF-2 |
|
Vacuum drum filter - 2 |
VF-2 |
|
Vacuum filter belt - 1 |
VFB-1 |
|
Vacuum filter belt - 1 |
VFB-1 |
|
Vacuum filter belt - 2 |
VFB-2 |
|
Vacuum filter belt - 2 |
VFB-2 |
|