Form FS-2400-67a Annual Operating Plan - Timber Sale and Integrated Resou

Operating Plans

FS2400-67aAnnualOperatingSchedule

Operating Plans

OMB: 0596-0086

Document [doc]
Download: doc | pdf

USDA Forest Service FS-2400-67a (Rev 2/2007)

OMB 0596-0086 (Exp. TBA)


Annual Operating Plan

Integrated Resource Contracts

(FSH 2409.15)

CALENDAR YEAR:      


National Forest:

     

Ranger District:

     

Region:

(1) Northern

(2) Rocky Mountain

(3) Southwestern

(4) Intermountain

(5) Pacific Southwest

(6) Pacific Northwest

(8) Southern

(9) Eastern

(10) Alaska

Contract Name:

     

Contractor:

     

Contract Number:

     

Award Date:

     

Termination Date:

     

Designation of Contractor’s Representative

[G/GT.3.1] When Contractor’s operations are in progress, Contractor shall have a representative, named in writing, readily available to receive notices in regard to performance under this contract and take related action. For the time period of       (mm/dd/yy) through       (mm/dd/yy), the Contractor’s representative will be:      

During this same time period the Contractor’s field representative will be:      

Contractor:

     

Contracting Officer:

     

Telephone #:

     

Date:

     

Telephone #:

     

Date:

     

Signature:


Contracting Officer’s Signature:


Submitted by

(print name

and title):

     

Continuation Sheets Attached: Yes; No

(If additional space needed, attach separate sheet(s) after page 5, include heading(s) for item(s), and all relevant details. Attach continuation sheet after page 5)


Payment Units

Cutting Units

Harvest Schedule

(includes felling, yarding, decking, and hauling)

Planned Start Date

Planned End Date

Work Description

Remarks

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

Logging Equipment on Contract Area

(Includes specialized equipment)

Dates

Company

Equipment

Unit/Location

Start

End

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     



Road Construction/Reconstruction/Maintenance Planned

Dates

Road Number

Temporary Road

Equipment

Activity

Start

End

     

     

     

Yes/ No

     

     

     

     

     

Yes/ No

     

     

     

     

     

Yes/ No

     

     

     

     

     

Yes/ No

     

     

     

     

     

Yes/ No

     

     

     

     

     

Yes/ No

     

     

Road Closures Needed/Planned

Dates

Road Number

Legal Description

Contractor provided traffic control

Close

Reopen

     

     

     

     

Barricades

Flaggers

Pilot Vehicles

Signs

None

Other:      

     

     

     

     

Barricades

Flaggers

Pilot Vehicles

Signs

None

Other:      

     

     

     

     

Barricades

Flaggers

Pilot Vehicles

Signs

None

Other:      

     

     

     

     

Barricades

Flaggers

Pilot Vehicles

Signs

None

Other:      


Other Planned Activities

Hauling

Unit

Date Begin

Date End

Remarks

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

     

Slash Treatments

Unit

Date Begin

Date End

Method

     

     

     

     

     

     

     

     

     

     

     

     

Erosion Control

Unit

Contractor Responsible?

Time of Year to Complete

Erosion Control Method

     

Yes/ No

     

Fertilization

Lime

Seed Mixture

Straw

Other:      

     

Yes/ No

     

Fertilization

Lime

Seed Mixture

Straw

Other:      

     

Yes/ No

     

Fertilization

Lime

Seed Mixture

Straw

Other:      



Prevention and Control Plans

The following must be included with this operating plan:

  • Fire prevention and control plan, including a detailed list of personnel and equipment at the contractor’s disposal

  • Prevention and Spill Control Plan for petroleum products stored in the contract operating area



BURDEN AND NONDISCRIMINATION STATEMENTS


According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0596-0086. The time required to complete this information collection is estimated to average 1.6 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.


The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation, and marital or family status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA’s TARGET Center at 202-720-2600 (voice and TDD).


To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.



5 of 5

File Typeapplication/msword
File TitleAnnual Operating Plan
AuthorFSDefaultUser
Last Modified Bycmwoolley
File Modified2010-02-25
File Created2007-01-31

© 2024 OMB.report | Privacy Policy