Innovative Bridge Research & Development

Innovative Bridge Research & Development

2006 IBRD APPLICATION

Innovative Bridge Research & Development

OMB: 2125-0612

Document [doc]
Download: doc | pdf

2006 APPLICATION

For

INNOVATIVE BRIDGE RESEARCH AND DEPLOYMENT PROGRAM

Burden Statement

This collection of information is required under the proposed implementation plan of Section 5202 (b) of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LOU) for the Innovative Bridge Research and Deployment (IBRD) Program. FHWA is soliciting applications and proposals for eligible candidate projects from State Transportation agencies that specially address the construction of bridges using innovative designs, materials, and construction methods. Public reporting burden is estimated to average one hour per response, including the time for reviewing instructions, and inputting existing data sources. Information provided will be used only for project award assessment and for the purpose of administering Innovative Bridge Research and Deployment (IBRD) Program. The information will be treated as non-confidential.

Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-XXXX. This collection will expire on _____________

State State’s Priority Ranking: # _____ of _____


Project type (new construction, replacement, rehabilitation, or repair)

NBI structure number County


Structure Name and/or Identifying Description (e.g., Number/Name of Route on the Bridge and Feature Crossed)


Structure description (e.g., bridge type, number of spans, length, width, material)


Innovative material and/or innovative accelerated construction (describe the material and/or construction, how it is used and how the project meets one or more of the program goals)


Schedule for start of work (month/year):


Cost Estimates:


Total project cost: P


Cost of “innovative material” portion of the construction A


Preliminary engineering cost, if requested B


Cost of innovative material performance evaluation

(e.g., for a 2-year post-construction period) C


PE costs + construction costs + evaluation costs = (A + B + C) T


Total Federal Program Funds Requested . . . . . . . . . . . .. $$_________________


File Typeapplication/msword
File Title2006 APPLICATION
Authorcchang
Last Modified ByFHWA
File Modified2006-08-23
File Created2006-08-23

© 2024 OMB.report | Privacy Policy