STEAMSHIP LINE SURVEY
(Personal Interview)
OMB 0710-0001
Expires: 30 September 2012
The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.
STEAMSHIP LINE SURVEY
Name of firm: _________________________________________________________________
Address: _________________________________________________________________
If subsidiary, name of parent firm: _________________________________________________________________
Address: _________________________________________________________________
Person interviewed: _________________________________________________________________
Title of person interviewed: _________________________________________________________________
Telephone number: _________________________________________________________________
1. Type of service provided by your company: (Check all that apply)
___Scheduled line ___Trip charter
___Other (specify) ________________________________________________________
2. Type of cargo carried by your company: (Check all that apply)
___Container ___Dry bulk
___Breakbulk ___Tanker
___NEO bulk ___Other (specify) _______________________
3. Please list the representative ship sizes and types owned or leased by your firm along with the estimated replacement/retirement dates for these vessels.
Cargo Type |
Vessel Class (Deadweight Ton(DWT)/Twenty Foot Equivalent Unit (TEU) |
Dimensions
Length Beam Draft |
Number leased/ Number Purchased |
Estimated Replacement/ Retirement year |
Number of ships on order |
Approximate Delivery Dates |
Number in Class |
|||
Container |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Breakbulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NEO bulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dry bulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tanker |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other (specify types) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. For each class of vessel shown in Question 3 above, please list their number of days in service and percentages
of them engaged in different activities.
PERCENT OF THE TIME ENGAGED IN THESE ACTIVITIES |
|||||||||
Cargo Type |
No. In Vessel Class |
Number of days per Year in Service |
% Time at Sea |
% Time in Port Working |
% Time Waiting for Berth |
% Time Waiting for Tide |
% Time Waiting for Weather |
% Time Under Repairs |
% Other Nonproductive Time |
Container |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Breakbulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
NEO bulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dry Bulk |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tanker |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Of the U.S. ports you serve, which three U.S. ports have the least adequate channel dimensions? Also, list the types of cargo usually carried in these ports.
U.S. Port |
Type of Cargo Carried |
||
Name of Port #1: |
|
|
|
Name of Port #2: |
|
|
|
Name of Port #3: |
|
|
|
6. In what ways, for the three ports named above, are channels inadequate? Check the appropriate boxes below each port.
|
Port #1 |
Port #2 |
Port #3 |
Lack of channel reliability? |
|
|
|
Not sufficiently deep? |
|
|
|
Too much traffic congestion? |
|
|
|
No sufficiently wide? |
|
|
|
Safety concerns? |
|
|
|
Weather concerns? |
|
|
|
Inadequate turning basins? |
|
|
|
Other ways? (Please specify): _________________________________________________________________________________
_________________________________________________________________________________ |
7. For each of the following trade routes or areas served by your company, give the total number of metric tons you ship annually.
METRIC METRIC
TONS TONS
Northern Europe & Scandinavia ______ Caribbean & Central America ______
Southeast Asia & Japan ______ West Coast United States ______
Mediterranean ______ East Coast United States ______
Australia & New Zealand ______ Gulf Coast United States ______
West, South, & East Africa ______ Great Lakes ______
West Coast South America ______ Other (specify): _________________________
East Coast South America ______ ______________________________________
8. Of the trade routes or areas mentioned in question #7 as being served by your company, which three ports have the least adequate channel dimensions? Also, list the types of cargo usually carried in and out of these three ports.
Foreign Ports with Least Adequate Channel Dimensions |
Cargo Usually Carried |
||
Name of Port #1 |
|
|
|
Name of Port #2 |
|
|
|
Name of Port #3 |
|
|
|
9. Give each of the following dollar costs, which your company can specify, per the units specified, below, and/or per TEU.
Costs |
$ per Units Specified |
and/or $ per TEU |
Total land transportation costs PER CARGO TON |
$ _____________ |
$ _______________ per TEU |
Total port to port costs PER CARGO TON |
$ _____________ |
$ _______________ per TEU |
Vessel at sea cost PER HOUR |
$ _____________ |
$ _______________ per TEU |
Vessel in port working cost PER HOUR |
$ _____________ |
$ _______________ per TEU |
Vessel in port waiting cost PER HOUR |
$ _____________ |
$ _______________ per TEU |
Other (specify types of cost and units) ______________________________ ______________________________ |
$ _____________ |
$ _______________ per TEU |
10. What are the criteria your company uses to trade off the increased risk of running aground with the increased risk associated with deeper loadings?
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
11. Please list any expected changes that will significantly affect your shipping patterns (i.e., changes in ships technology, land side technology, marketing strategy, etc.).
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
12. After channel improvements are made, what criteria would your organization use in deciding when it should switch to larger ships?
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
13. Please specify any current plans you may have to switch from your existing routing patterns.
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
14. If the channels are improved at the ports that you use, how do you feel your steamship line will benefit? Check all that apply.
___Increased frequency of service ___ Increased loadings per vessel
___Increased speed per vessel ___Change of itinerary
___Other (please specify) __________________________________________________
15. For what types of commodities are you likely to experience transportation savings from improvements to waterway channels? Please explain.
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
16. Are the depths at the dock you use adequate for your current and expected needs?
___No ___Yes (Please explain) ___________________
______________________________________________________________________________
______________________________________________________________________________
17. Are you having trouble docking in ______________________________? ___Yes ___No
18. What is causing your docking problems?
___Currents ___Inadequate depths
___Wind ___Other (please specify) _____________________
__________________________________________________________________
__________________________________________________________________
19. Would you like to see improvements in the NAVAIDS? ___Yes ___No
If yes, please specify:
_________________________________________________________________
_________________________________________________________________
20. What suggestions do you have for solving the navigation problems that exist in ______________? Check all that apply.
___ More dredging ___ Using smaller ships
___ Using Doppler sonar tide gauges for ___ Altering the navigation
real-time tide measurement routes currently used in the inlet
___Other (please specify)
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________
Comments: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
File Type | application/msword |
File Title | STEAMSHIP LINE SURVEY |
Author | USACE WRC |
Last Modified By | Stuart A. Davis |
File Modified | 2009-05-29 |
File Created | 2009-05-29 |