Corps of Engineers Civil Works Questionnaires Generic Clearance

Supporting Statement B

STEAMSHIP LINE SURVEY

Corps of Engineers Civil Works Questionnaires Generic Clearance

OMB: 0710-0001

Document [doc]
Download: doc | pdf

STEAMSHIP LINE SURVEY



(Personal Interview)


OMB 0710-0001


Expires: 30 September 2012












The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.


STEAMSHIP LINE SURVEY



Name of firm: _________________________________________________________________


Address: _________________________________________________________________


If subsidiary, name of parent firm: _________________________________________________________________


Address: _________________________________________________________________


Person interviewed: _________________________________________________________________


Title of person interviewed: _________________________________________________________________


Telephone number: _________________________________________________________________






1. Type of service provided by your company: (Check all that apply)


___Scheduled line ___Trip charter


___Other (specify) ________________________________________________________


2. Type of cargo carried by your company: (Check all that apply)


___Container ___Dry bulk


___Breakbulk ___Tanker


___NEO bulk ___Other (specify) _______________________

3. Please list the representative ship sizes and types owned or leased by your firm along with the estimated replacement/retirement dates for these vessels.



Cargo Type


Vessel Class

(Deadweight Ton(DWT)/Twenty Foot Equivalent Unit (TEU)


Dimensions



Length Beam Draft


Number leased/

Number Purchased


Estimated

Replacement/

Retirement

year


Number of ships

on order


Approximate

Delivery

Dates


Number in Class



Container































































Breakbulk































































NEO bulk































































Dry bulk































































Tanker































































Other

(specify types)





























































4. For each class of vessel shown in Question 3 above, please list their number of days in service and percentages

of them engaged in different activities.



PERCENT OF THE TIME ENGAGED IN THESE ACTIVITIES


Cargo

Type


No. In

Vessel Class


Number of days per

Year in Service


% Time

at Sea


% Time in

Port Working


% Time Waiting

for Berth


% Time Waiting

for Tide


% Time Waiting

for Weather


% Time Under

Repairs


% Other

Nonproductive

Time



Container

























































Breakbulk

























































NEO bulk

























































Dry Bulk

























































Tanker

























































Other























































5. Of the U.S. ports you serve, which three U.S. ports have the least adequate channel dimensions? Also, list the types of cargo usually carried in these ports.



U.S. Port


Type of Cargo Carried


Name of Port #1:








Name of Port #2:








Name of Port #3:









6. In what ways, for the three ports named above, are channels inadequate? Check the appropriate boxes below each port.





Port #1


Port #2


Port #3


Lack of channel reliability?








Not sufficiently deep?








Too much traffic congestion?








No sufficiently wide?








Safety concerns?








Weather concerns?








Inadequate turning basins?








Other ways? (Please specify): _________________________________________________________________________________


_________________________________________________________________________________



7. For each of the following trade routes or areas served by your company, give the total number of metric tons you ship annually.


METRIC METRIC

TONS TONS


Northern Europe & Scandinavia ______ Caribbean & Central America ______


Southeast Asia & Japan ______ West Coast United States ______


Mediterranean ______ East Coast United States ______


Australia & New Zealand ______ Gulf Coast United States ______


West, South, & East Africa ______ Great Lakes ______


West Coast South America ______ Other (specify): _________________________


East Coast South America ______ ______________________________________

8. Of the trade routes or areas mentioned in question #7 as being served by your company, which three ports have the least adequate channel dimensions? Also, list the types of cargo usually carried in and out of these three ports.





Foreign Ports with Least Adequate Channel Dimensions




Cargo Usually Carried


Name of Port #1








Name of Port #2








Name of Port #3









9. Give each of the following dollar costs, which your company can specify, per the units specified, below, and/or per TEU.




Costs



$ per Units Specified


and/or

$ per TEU


Total land transportation costs PER CARGO TON



$ _____________



$ _______________ per TEU


Total port to port costs PER CARGO TON



$ _____________



$ _______________ per TEU


Vessel at sea cost PER HOUR



$ _____________



$ _______________ per TEU


Vessel in port working cost PER HOUR



$ _____________



$ _______________ per TEU


Vessel in port waiting cost PER HOUR



$ _____________



$ _______________ per TEU


Other (specify types of cost and units)

______________________________

______________________________



$ _____________



$ _______________ per TEU





10. What are the criteria your company uses to trade off the increased risk of running aground with the increased risk associated with deeper loadings?


______________________________________________________________________________


______________________________________________________________________________


______________________________________________________________________________



11. Please list any expected changes that will significantly affect your shipping patterns (i.e., changes in ships technology, land side technology, marketing strategy, etc.).


______________________________________________________________________________


______________________________________________________________________________


______________________________________________________________________________



12. After channel improvements are made, what criteria would your organization use in deciding when it should switch to larger ships?


______________________________________________________________________________


______________________________________________________________________________


______________________________________________________________________________



13. Please specify any current plans you may have to switch from your existing routing patterns.


______________________________________________________________________________


______________________________________________________________________________


­______________________________________________________________________________



14. If the channels are improved at the ports that you use, how do you feel your steamship line will benefit? Check all that apply.


___Increased frequency of service ___ Increased loadings per vessel


___Increased speed per vessel ___Change of itinerary


___Other (please specify) __________________________________________________








15. For what types of commodities are you likely to experience transportation savings from improvements to waterway channels? Please explain.


______________________________________________________________________________


______________________________________________________________________________


______________________________________________________________________________



16. Are the depths at the dock you use adequate for your current and expected needs?


___No ___Yes (Please explain) ___________________


______________________________________________________________________________


______________________________________________________________________________



17. Are you having trouble docking in ______________________________? ___Yes ___No



18. What is causing your docking problems?


___Currents ___Inadequate depths


___Wind ___Other (please specify) _____________________


__________________________________________________________________


__________________________________________________________________



19. Would you like to see improvements in the NAVAIDS? ___Yes ___No


If yes, please specify:

_________________________________________________________________


_________________________________________________________________



20. What suggestions do you have for solving the navigation problems that exist in ______________? Check all that apply.


___ More dredging ___ Using smaller ships


___ Using Doppler sonar tide gauges for ___ Altering the navigation

real-time tide measurement routes currently used in the inlet

___Other (please specify)


____________________________________________________________________


____________________________________________________________________


____________________________________________________________________





Comments: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________


2



File Typeapplication/msword
File TitleSTEAMSHIP LINE SURVEY
AuthorUSACE WRC
Last Modified ByStuart A. Davis
File Modified2009-05-29
File Created2009-05-29

© 2024 OMB.report | Privacy Policy