Corps of Engineers Civil Works Questionnaires Generic Clearance

Supporting Statement B

Public Damage Survey

Corps of Engineers Civil Works Questionnaires Generic Clearance

OMB: 0710-0001

Document [doc]
Download: doc | pdf

PUBLIC DAMAGE SURVEY



(Personal Interview)


OMB 0710-0001


Expires: 30 September 2012













The public report burden for this information collection is estimated to average 40 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.



PUBLIC DAMAGE SURVEY


1. Name of Governmental Entity: _______________________________

2. Agency: ______________________________________


3. Phone Number: ______________________________________


  1. Dates of Flooding/

Coastal Storm: ______________________________________


5. Source(s) of Flooding: ______________________________________

6. In the table below list the damages that occurred to public property in your jurisdiction as a result of the (date) flood.



Type of Property


$ Damage


Primary Cause of Damage

(inundation, wave, erosion, etc.)


Buildings





Equipment





Vehicles





Supplies





Streets, highways, roads





Water supply system

plant and equipment

distribution system





Sewage system

plant and equipment

distribution system





Drainage system





Bridges




Docks




Marinas





Boardwalks




Parks




Other




Total





7. Please list any other public cost that resulted from the flooding in your jurisdiction.



Type of Costs


$ Costs


Volunteer (unpaid hours)


Emergency operations and floodfighting





Police protection





Additional costs of water supply





Additional costs of sewage treatment





Additional costs of flood cleanup





Additional costs of trash collection and disposal





Replacement of business records





Repairs to levee, sand dunes, or other flood or coastal protection



Cleanup of hazard waste




Other costs






Total







  1. Please describe any harmful public health and other environmental effects that flooding may have caused by inundation of landfills, sewage treatment plants, or other hazardous waste sites.


_____________________________________________________________________

__________________________________________________________________________________________________________________________________________ _____________________________________________________________________________________________________________________________________


3


File Typeapplication/msword
File TitlePUBLIC DAMAGE SURVEY
AuthorUSACE WRC
Last Modified ByStuart A. Davis
File Modified2009-05-26
File Created2007-11-14

© 2024 OMB.report | Privacy Policy