BUSINESS FLOOD LOSS SURVEY
(Personal Interview)
OMB 0710-0001
Expires: 30 November 2012
The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503: Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.
Interview date _______________________
By ____________________________________
Firm name ___________________________________________________________
Address ___________________________________________________________
___________________________________________________________
Type of
Business ___________________________________________________________
Building type ___Block/Brick ___Steel ___Wood ___Metal
(Check appropriate block)
Building size _____feet by _____feet: = ______________square feet
(Not including basement)
Basement size _________square feet of finished area
_________ Square feet of unfinished area
Number of floors (including basement, if any) __________
Ground elevation______________
How high in feet and inches did the water from ______ (year) flood get on the inside of this building relative to the first floor of the building?
______ FEET; _______ INCHES (ABOVE, BELOW) First Floor Level
[CIRCLE]
Please indicate the total replacement value of the following items and the amount of damage you estimate occurred from the (year) flood. (Include only items owned or managed by your business.)
|
Replacement Value |
(year)Flood Actual Damage or Cost |
Damage to Transportation |
|
|
Roads, bridges, streets, walks, parking |
|
|
Rail beds and tracks |
|
|
Rerouting trains, trucks, cars, & buses |
|
|
Docks and loading facilities |
|
|
Damage to Buildings |
|
|
Foundation and supports |
|
|
Floors (mark one) ___Steel ___Concrete ___Wood |
|
|
Floor covering (mark one) ___Ceramic ___Linoleum ___Carpet |
|
|
Exterior walls and insulation (mark one) ___Metal ___Wood ___Block/brick |
|
|
Windows |
|
|
Interior walls and ceilings |
|
|
Doors and moldings |
|
|
Damage to Building Utilities Indicate location: B=Basement, G=Ground floor, I=Intermediate floors, R=Roof |
|
|
Sewer systems ___Storm ___Industrial ___Sanitary ___B ___G ___R |
|
|
Water supply systems ___Treatment ___Pipes ___B ___G ___R |
|
|
Water systems ___Hot water ___Softening ___B ___G ___R |
|
|
Communications systems ___B ___G ___R |
|
|
Electric power transformers ___Pole ___Ground |
|
|
Electrical service entrance and meters ___B ___G ___R |
|
|
Engines/generators/alternators ___B ___G ___R |
|
|
Other Electrical control panels and circuit breakers ___B ___G ___R |
|
|
Wiring switches, outlets, lighting ___B ___G ___R |
|
|
Fuel supply ___Oil tanks ___Gas pipes/meters ___B ___G ___R |
|
|
Heating ___Oil ___Gas ___Elect. ___Air ___Water ___B ___G ___R |
|
|
Air conditioning ___Gas ___Electric ___Cool ___Purify ___Dehumidify ___B ___G ___R |
|
|
Damage to Equipment, Appliances, and Furniture |
|
|
___Conveyors ___Elevators ___Escalators
|
|
|
Foundry furnaces and welding equipment |
|
|
Machine tools and patterns |
|
|
Other motors and engines |
|
|
Compressors |
|
|
Built-in refrigeration units |
|
|
Hand and paint tools |
|
|
Other equipment |
|
|
Display cases, counters, and bins |
|
|
Appliances ___Oven ___Refrigerators ___Other ______________________ ______________________________ ______________________________ |
|
|
Vehicles kept at this location |
|
|
Damage to: |
|
|
Parts/raw materials |
|
|
|
|
|
Inventory |
|
|
General Costs |
|
|
Fighting the Flood |
|
|
Evacuation ___Owner ___Tenant |
|
|
Number of employees out of work |
|
|
Value of lost wages |
|
|
Removal of debris and damaged items |
|
|
Disinfecting, other cleaning and rehabilitation |
|
|
Replacement of records |
|
|
Loss of gross income due to interruption of business |
|
|
Loss of net income due to interruption of business |
|
|
Increased alternative operating costs |
|
|
File Type | application/msword |
File Title | BUSINESS FLOOD LOSS SURVEY |
Author | USACE WRC |
Last Modified By | Stuart A. Davis |
File Modified | 2009-05-22 |
File Created | 2005-09-30 |