Corps of Engineers Civil Works Questionnaires Generic Clearance

Supporting Statement B

Business Flood Loss Survey

Corps of Engineers Civil Works Questionnaires Generic Clearance

OMB: 0710-0001

Document [doc]
Download: doc | pdf

BUSINESS FLOOD LOSS SURVEY



(Personal Interview)


OMB 0710-0001

Expires: 30 November 2012











The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503: Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.


BUSINESS FLOOD LOSS SURVEY



Interview date _______________________


By ____________________________________


Firm name ___________________________________________________________


Address ___________________________________________________________


___________________________________________________________


Type of

Business ___________________________________________________________


Building type ___Block/Brick ___Steel ___Wood ___Metal

(Check appropriate block)


Building size _____feet by _____feet: = ______________square feet

(Not including basement)


Basement size _________square feet of finished area


_________ Square feet of unfinished area


Number of floors (including basement, if any) __________


Ground elevation______________









How high in feet and inches did the water from ______ (year) flood get on the inside of this building relative to the first floor of the building?


______ FEET; _______ INCHES (ABOVE, BELOW) First Floor Level

[CIRCLE]


Please indicate the total replacement value of the following items and the amount of damage you estimate occurred from the (year) flood. (Include only items owned or managed by your business.)





Replacement

Value


(year)Flood

Actual

Damage or Cost


Damage to Transportation






Roads, bridges, streets, walks, parking






Rail beds and tracks






Rerouting trains, trucks, cars, & buses






Docks and loading facilities






Damage to Buildings






Foundation and supports






Floors (mark one)

___Steel ___Concrete ___Wood






Floor covering (mark one)

___Ceramic ___Linoleum ___Carpet






Exterior walls and insulation (mark one)

___Metal ___Wood ___Block/brick






Windows






Interior walls and ceilings






Doors and moldings







Damage to Building Utilities

Indicate location: B=Basement, G=Ground floor,

I=Intermediate floors, R=Roof






Sewer systems

___Storm ___Industrial ___Sanitary

___B ___G ___R






Water supply systems

___Treatment ___Pipes

___B ___G ___R






Water systems

___Hot water ___Softening

___B ___G ___R






Communications systems

___B ___G ___R






Electric power transformers

___Pole ___Ground






Electrical service entrance and meters

___B ___G ___R






Engines/generators/alternators

___B ___G ___R






Other Electrical control panels and circuit breakers

___B ___G ___R






Wiring switches, outlets, lighting

___B ___G ___R






Fuel supply

___Oil tanks ___Gas pipes/meters

___B ___G ___R






Heating

___Oil ___Gas ___Elect. ___Air

___Water

___B ___G ___R






Air conditioning

___Gas ___Electric ___Cool ___Purify ___Dehumidify

___B ___G ___R







Damage to Equipment, Appliances, and Furniture






___Conveyors ___Elevators ___Escalators







Foundry furnaces and welding equipment






Machine tools and patterns






Other motors and engines






Compressors






Built-in refrigeration units






Hand and paint tools






Other equipment






Display cases, counters, and bins






Appliances

___Oven ___Refrigerators

___Other ______________________

______________________________

______________________________





Vehicles kept at this location




Damage to:






Parts/raw materials






Partly assembled/processed product






Inventory






General Costs






Fighting the Flood






Evacuation

___Owner ___Tenant






Number of employees out of work






Value of lost wages






Removal of debris and damaged items






Disinfecting, other cleaning and rehabilitation






Replacement of records






Loss of gross income due to interruption of business






Loss of net income due to interruption of business






Increased alternative operating costs







6


File Typeapplication/msword
File TitleBUSINESS FLOOD LOSS SURVEY
AuthorUSACE WRC
Last Modified ByStuart A. Davis
File Modified2009-05-22
File Created2005-09-30

© 2024 OMB.report | Privacy Policy