The Management Information Reporting
System is designed to collect information about center performance
in providing technology, production, and business solutions for
smaller manufacturers in the U.S.
The reporting processes and the
required data elements were streamlined and all the Centers now
have Internet access. Therefore, the amount of time anticipated to
perform the task was reduced. The previous submission mistakenly
included the cost burden of $375,000 which was the labor cost. This
submission corrects the mistake (-$375,000).
$32,000
No
No
Uncollected
Uncollected
No
Uncollected
Kenneth Voytek 3019754614
kvoytek@nist.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.