OMB Control Number: 1028 - XXXX
Expires:
PAPERWORK REDUCTION ACT STATEMENT: A Federal agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. Public burden for the collection of this information is estimated to average 2 minutes per response, including the time for reviewing instructions and completing the form. Comments regarding this collection of information should be directed to the Bureau Clearance Officer, U.S. Geological Survey 2150 Centre Avenue Fort Collins, CO 80525 or call 970-226-9445.
Pompeys Pillar National Monument
Intercept Survey
This script will be for the non-respondent survey.
The surveyor will hand the survey to the visitor to fill out and return on site.
Note: The text in the shaded boxes below will not be included in the script used during this survey. This text is used to annotate the questions in response to Part A question 2 of the PRA Supporting Statement
Opening text for surveyor:
Hello, I understand that you do not want to answer the longer version of the survey, but I am wondering if you would please answer three quick questions. This should take less than 2 minutes of your time today.
This information is needed to check the representativeness of our sample against the population. Question 1 and 2 are used to create separate profiles for local, non-local resident, and non-resident visitors as well as group size. Question #3 is the dependent variable, the distance traveled to reach PPNM. Distance traveled is a good predictor of demand and visitation behavior
Where are you from?
|
|
Including yourself, how many people are in your group?
What was your one-way travel time or travel distance from home to Pompeys Pillar National Monument on this most recent trip?
Travel time: ______ # hours ______ # minutes Distance: _______ # one-way miles
File Type | application/msword |
Author | John Loomis |
Last Modified By | pondsp |
File Modified | 2009-05-28 |
File Created | 2009-05-27 |