|
|
|
|
|
|
|
|
|
|
Form Approved |
As this form is optional, the public report burden for this information collection is included with FHWA-531, FHWA-532, and FHWA-534. |
|
|
|
|
|
|
|
|
|
OMB No. 2125-0032 |
|
|
|
|
|
|
|
|
State: |
|
|
|
|
|
|
|
|
|
|
|
|
|
U.S. Department |
|
|
TOLL FACILITY INCOME AND EXPENDITURES |
Year Ending (mm/yy): |
|
|
of Transportation, |
|
|
|
|
|
|
|
|
|
|
Federal Highway |
|
|
|
|
|
|
|
Name of Facility: |
|
|
Administration |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item |
Total |
|
|
|
|
|
|
|
|
|
|
All Funds |
|
|
|
|
|
|
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
I. Opening Balance |
|
|
|
|
|
|
|
|
|
|
II. |
Income |
|
|
|
|
|
|
|
|
|
|
A. |
Tolls |
|
|
|
|
|
|
|
|
|
B. |
Concessions & Rentals |
|
|
|
|
|
|
|
|
|
C. |
State Highway-User Revenue |
|
|
|
|
|
|
|
|
|
D. |
Other State Funds |
|
|
|
|
|
|
|
|
|
E. |
Funds fromFederal Highway Admin. |
|
|
|
|
|
|
|
|
|
F. |
Other Federal funds |
|
|
|
|
|
|
|
|
|
G. |
Local government funds |
|
|
|
|
|
|
|
|
|
H. |
Bond Sales (net) |
|
|
|
|
|
|
|
|
|
I. |
Investment Income (All) |
|
|
|
|
|
|
|
|
|
J. |
Miscellaneous Income |
|
|
|
|
|
|
|
|
|
K. |
Total Income |
|
|
|
|
|
|
|
|
III. |
Expenditures |
|
|
|
|
|
|
|
|
|
|
A. |
Right of Way |
|
|
|
|
|
|
|
|
|
B. |
Engineering |
|
|
|
|
|
|
|
|
|
C. |
Construction |
|
|
|
|
|
|
|
|
|
D. |
Maintenance |
|
|
|
|
|
|
|
|
|
E. |
Operations |
|
|
|
|
|
|
|
|
|
F. |
Administration |
|
|
|
|
|
|
|
|
|
G. |
Law enforce & safety |
|
|
|
|
|
|
|
|
|
H. |
Bond administration |
|
|
|
|
|
|
|
|
|
I. |
Bond interest |
|
|
|
|
|
|
|
|
|
J. |
Bond redemption (net) |
|
|
|
|
|
|
|
|
|
K. |
Transfer to State Highway Fund |
|
|
|
|
|
|
|
|
|
L. |
Transfer to local governments |
|
|
|
|
|
|
|
|
|
M. |
Transfer to mass transit |
|
|
|
|
|
|
|
|
|
N. |
Transfer to other (specify) |
|
|
|
|
|
|
|
|
|
O. |
Total Expenditures |
|
|
|
|
|
|
|
|
IV. |
Closing Balance |
|
|
|
|
|
|
|
|
|
V. |
Debt Status |
|
Outstanding, Beginning of Year |
Amount Issued During Year (Par) |
Redemption During Year (Par) |
Outstanding, End of Year |
|
A. |
Total Debt |
|
|
|
|
|
|
|
|
|
|
1. Refunding Issues |
|
|
|
|
|
|
|
|
Form FHWA-539 (6-2000) |
|
|
|
|
|
PREVIOUS EDITIONS OBSOLETE |
|
|
Excel |
(Next Page) |
|
|
|
|
|
|
1 |
|
|
|
|
U.S. Department |
|
|
|
|
|
|
|
State: |
|
|
of Transportation, |
|
|
|
|
|
|
|
0 |
|
|
Federal Highway |
|
|
|
TOLL FACILITY EXPENDITURES |
|
|
|
Year Ending (mm/yy): |
|
|
Administration |
|
|
|
NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b). Public reporting burden is estimated to average 206 hours per response. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. |
|
|
|
0 |
|
|
|
|
|
|
|
Identify by Facility, Functional System or NHS |
|
|
|
|
|
|
|
|
|
|
|
Detail on Expenditures |
Total |
|
|
|
|
|
|
(State Facilities only) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
VI. |
Capital Outlay |
|
|
|
|
|
|
|
|
|
|
A. |
New Facilities |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Construction of New Roads |
|
|
|
|
|
|
|
|
|
4. |
Construction of New Bridges |
|
|
|
|
|
|
|
|
|
5. |
Total (1 through 4) |
|
|
|
|
|
|
|
|
B. |
Capacity Additions to Existing Facilities |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Relocation with Added Capacity |
|
|
|
|
|
|
|
|
|
4. |
Reconstruction with Added Capacity |
|
|
|
|
|
|
|
|
|
5. |
Major Widening |
|
|
|
|
|
|
|
|
|
6. |
Bridge Replacement with Added Capacity |
|
|
|
|
|
|
|
|
|
7. |
Bridge Rehabilitation with Added Capacity |
|
|
|
|
|
|
|
|
|
8. |
Total (1 through 7) |
|
|
|
|
|
|
|
|
C. |
System Preservation |
|
|
|
|
|
|
|
|
|
|
1. |
Right-of-way Costs |
|
|
|
|
|
|
|
|
|
2. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
3. |
Relocation with No Added Capacity |
|
|
|
|
|
|
|
|
|
4. |
Reconstruction with No Added Capacity |
|
|
|
|
|
|
|
|
|
5. |
Restoration, Rehabilitation and Resurfacing |
|
|
|
|
|
|
|
|
|
6. |
Minor Widening |
|
|
|
|
|
|
|
|
|
7. |
Bridge Replacement with No Added Capacity |
|
|
|
|
|
|
|
|
|
8. |
Bridge Rehabilitation with No Added Capacity |
|
|
|
|
|
|
|
|
|
9. |
Total (1 through 8) |
|
|
|
|
|
|
|
|
D. |
System Enhancement and Operation |
|
|
|
|
|
|
|
|
|
|
1. |
Engineering Costs |
|
|
|
|
|
|
|
|
|
2. |
Safety Improvements |
|
|
|
|
|
|
|
|
|
3. |
Traffic Management and Traffic Engineering |
|
|
|
|
|
|
|
|
|
4. |
Environmental Improvements |
|
|
|
|
|
|
|
|
|
5. |
Other Enhancements |
|
|
|
|
|
|
|
|
|
6. |
Total (1 through 5) |
|
|
|
|
|
|
|
|
E. |
Grand Total (A.5.+B.8.+C.9.+D.6.) |
|
|
|
|
|
|
|
|
VII. |
Maintenance |
|
|
|
|
|
|
|
|
|
Notes and Comments: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Optional Form FHWA-539 (6-2000) |
|
|
|
|
|
2 |
|
|
|
Excel |