U. S. Department of Transportation |
|
STATE: |
|
Federal Highway Administration |
|
|
|
|
|
|
|
|
YEAR ENDING (mm/yy): |
|
STATE HIGHWAY CAPITAL OUTLAY |
|
|
AND MAINTENANCE EXPENDITURES |
|
NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b). Public reporting burden is estimated to average126 hours per response. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. |
|
AREA AND FUNCTIONAL SYSTEM: |
|
|
|
|
|
|
|
|
|
|
|
|
|
EXPENDITURES |
ON NATIONAL |
OFF NATIONAL |
|
BY IMPROVEMENT TYPES |
HIGHWAY SYSTEM |
HIGHWAY SYSTEM |
TOTAL |
|
|
|
|
I. CAPITAL OUTLAY |
|
|
|
A. NEW FACILITIES |
|
|
|
1. RIGHT-OF-WAY COSTS |
|
|
|
2. ENGINEERING COSTS |
|
|
|
3. CONSTRUCTION OF NEW ROADS |
|
|
|
4. CONSTRUCTION OF NEW BRIDGES |
|
|
|
5. TOTAL |
|
|
|
B. CAPACITY ADDITIONS TO EXISTING FACILITES |
|
|
|
1. RIGHT-OF-WAY COSTS |
|
|
|
2. ENGINEERING COSTS |
|
|
|
3. RELOCATION WITH ADDED CAPACITY |
|
|
|
4. RECONSTRUCTION WITH ADDED CAPACITY |
|
|
|
5. MAJOR WIDENING |
|
|
|
6. BRIDGE REPLACEMENT WITH ADDED CAPACITY |
|
|
|
7. BRIDGE REHABILITATION WITH ADDED CAPACITY |
|
|
|
8. TOTAL |
|
|
|
C. SYSTEM PRESERVATION |
|
|
|
1. RIGHT-OF-WAY COSTS |
|
|
|
2. ENGINEERING COSTS |
|
|
|
3. RELOCATION WITH NO ADDED CAPACITY |
|
|
|
4. RECONSTRUCTION WITH NO ADDED CAPACITY |
|
|
|
5. RESTORATION, REHABILITATION, & RESURFACING |
|
|
|
6. MINOR WIDENING |
|
|
|
7. BRIDGE REPLACEMENT WITH NO ADDED CAPACITY |
|
|
|
8. BRIDGE REHABILITATION WITH NO ADDED CAPACITY |
|
|
|
9. TOTAL |
|
|
|
D. SYSTEM ENHANCEMENT AND OPERATION |
|
|
|
1. ENGINEERING COSTS |
|
|
|
2. SAFETY IMPROVEMENTS |
|
|
|
3. TRAFFIC MANAGEMENT / TRAFFIC ENGINEERING |
|
|
|
4. ENVIRONMENTAL IMPROVEMENTS |
|
|
|
5. OTHER ENHANCEMENTS |
|
|
|
6. TOTAL |
|
|
|
E. TOTAL CAPITAL OUTLAY (Lines A + B + C + D) |
|
|
|
II. MAINTENANCE |
|
|
|
FORM FHWA-534 (Rev. 06-2000) |
PREVIOUS EDITIONS OBSOLETE |
|
Excel |