Regulatory Analysis for the Supplemental Proposed Rule to Amend
Alternate Fracture Toughness Requirements for Protection
against Pressurized Thermal Shock Events (10 CFR 50.61a)
This document presents a draft regulatory analysis for the proposed revisions to the Pressurized
Thermal Shock (PTS) Rule as set forth by the U.S. Nuclear Regulatory Commission (NRC) in
Title 10, Section 50.61, of the Code of Federal Regulations (10 CFR 50.61). The proposed rule
was undertaken as the result of a June 30, 2006, Staff Requirements Memorandum (SRM). In
this SRM, the Commission directed the staff to pursue the rulemaking as described in Option 2
of the May 26, 2006, Commission paper, SECY-06-0124, containing the “Rulemaking Plan to
Amend Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock
Events (10 CFR 50.61).” The NRC published the proposed rulemaking on the alternate fracture
toughness requirements for protection against PTS for public comments in the Federal Register
on October 3, 2007 (72 FR 56275). During the development of the PTS final rule, the NRC
determined that several significant changes to the proposed rule language would be needed to
adequately address the stakeholders’ comments and their associated implementation concerns.
Two of the modifications are significant changes to the proposed rule language on which
external stakeholders did not have an opportunity to comment. The NRC concludes that
obtaining stakeholder feedback on these provisions through the use of a supplemental
proposed rule is appropriate. These two modifications subject to comments from the public do
not have a measurable impact in this regulatory analysis. However, in the supplemental
proposed rule, the NRC is considering limiting the applicability and the use of 10 CFR 50.61a to
currently-operating plants only. Therefore, this regulatory analysis is being modified to reflect
this change.
1.0

Statement of the Problem and Reasons for the Rulemaking:

The Pressurized Thermal Shock (PTS) rule, 10 CFR 50.61, adopted on July 23, 1985
(50 FR 29937), establishes screening criteria to evaluate when a reactor vessel may be
susceptible to failure due to a PTS event. The screening criteria define a limiting level of
embrittlement beyond which operation cannot continue without further plant-specific evaluation.
Any pressurized water reactor (PWR) vessel with materials predicted to exceed the screening
criteria in 10 CFR 50.61 may not continue operation without implementation of compensatory
actions or plant-specific analyses unless the licensee receives an exemption from the
requirements of the rule. No currently operating PWR is projected to exceed the 10 CFR 50.61
screening criteria before the expiration of its 40 year operating license. However, several plants
are approaching the screening criteria, while others are likely to exceed the screening criteria
during their first license renewal periods.
The NRC staff has completed a research program to update the PTS regulations. The results of
this research program conclude that the risk of through-wall cracking due to a PTS event is
much lower than previously estimated. This finding indicates that the screening criteria in
10 CFR 50.61 are unnecessarily conservative and may impose an unnecessary burden on
some licensees. Therefore, the NRC is proposing a new rule, 10 CFR 50.61a. The objective of
the proposed rule is to provide alternative screening criteria and corresponding embrittlement
correlations for licensees seeking regulatory relief from the overly conservative requirements of
the current PTS regulation, 10 CFR 50.61.
Further, the NRC has determined that the backfit rule, 10 CFR 50.109, does not apply to this
proposed rule because compliance with the requirements of the proposed rule (10 CFR 50.61a)
would be an alternative to compliance with the requirements of the current PTS rule

(10 CFR 50.61). Due to the voluntary implementation of this amendment, this proposed rule
does not constitute backfitting as defined in 10 CFR 50.109(a)(1), and a backfit analysis is not
required.
2.0

Identification of Alternatives

Following the Commission’s direction contained in the June 30, 2006, SRM, the staff considered
several alternatives to amend the regulation.
Alternative 1: Take no action.
Under Alternative 1, the “no action” alternative, the NRC would not amend the current
regulations regarding PTS events. The current requirements of 10 CFR 50.61 would remain in
effect and would continue to apply to all current and future PWR licensees.
The “no action” alternative serves as the baseline against which the costs and benefits of the
other alternatives are measured. Under the current rule, licensees with reactor pressure
vessels (RPVs) that do not meet the current screening limits may implement several
compensatory measures, such as flux reduction, submission of plant-specific analyses, and
vessel annealing, each of which impose a cost burden on the licensee. Alternatively, licensees
may request exemptions from 10 CFR 50.61 to use, for example, plant-specific toughness
analyses different from those required by the current rule. Absent the compensatory measures,
licensees who exceed the screening limits would be required to cease operation.
Alternative 2: Require all PWRs to implement the requirements in 10 CFR 50.61a.
Under Alternative 2, the NRC would promulgate a new PTS rule which would require all PWR
licensees to apply the updated PTS screening criteria and embrittlement correlations. The
requirements in this proposed rule would replace the requirements in the current 10 CFR 50.61.
All PWR licensees would be required to meet the requirements of the new rule. As a result,
current licensees would be required to perform analyses to evaluate their plant(s) using the new
embrittlement correlations to assess compliance with the new screening criteria, thereby
demonstrating their compliance with the new regulation. Future licensees referencing a certified
design would be required to perform similar re-analyses under the new rule. Future licensees
not referencing a certified design would be required to comply with the new rule.
All current PWR licensees and future licensees referencing certified designs would be required
to comply with the new rule and would incur additional regulatory burden. This additional
burden would be caused by the requirement to re-analyze the plant PTS reference temperature
(RTMAX-X) values under the new rule, where the design has previously been licensed or certified
under the analysis methods and screening criteria defined in the current rule. This would
constitute a backfit under 10 CFR 50.109 for those licensees. Future licensees not referencing
a certified design would only perform the analyses required in the new rule. However, in this
case, it would not constitute a backfit because the licensee had not previously been granted
approval of the plant design based on the current rule.

-2-

Alternative 3: Permit voluntary compliance with a new PTS rule for existing PWR licensees and
require mandatory compliance with the new rule for new PWR licensees.
Under Alternative 3, the NRC would promulgate 10 CFR 50.61a which would be (1) an
alternative to requirements of 10 CFR 50.61 for any current PWR reactor with an operating
license or combined license in place before the effective date of the proposed rule or new PWR
reactor referencing a design certified before the effective date of the proposed rule, and
(2) mandatory for any new PWR reactor with an operating license or combined license in place
after the effective date of the new rule. All PWR licensees would be required to meet the
requirements of 10 CFR 50.61 or 10 CFR 50.61a, depending on the date of their license or
design certification and whether they choose to implement the new rule.
Licensees under (1) described above would incur no additional regulatory burden, since the
proposed rule would be voluntarily implemented. Licensees under (2) described above would
be required to comply with 10 CFR 50.61a, but this would not be a backfit because the licensee
had not previously been granted approval of the plant design based on the current rule.
Alternative 4: Permit all PWR licensees to implement either the current 10 CFR 50.61 or the
proposed 10 CFR 50.61a.
Under Alternative 4, the NRC would promulgate 10 CFR 50.61a as an alternative to the
requirements of 10 CFR 50.61. All PWR licensees would be required to meet the conditions of
10 CFR 50.61, or as an alternative, would be required to comply with 10 CFR 50.61a. This
alternative would not constitute a backfit for any licensee because 10 CFR 50.61a would be
voluntarily implemented by any PWR licensee who found it advantageous to do so. PWR
licensees who are projected to exceed the 10 CFR 50.61 screening criteria during the lifetime of
their plant license would likely comply with 10 CFR 50.61a rather than implement the more
expensive compensatory actions specified in 10 CFR 50.61. PWR licensees who are not
projected to exceed the 10 CFR 50.61 screening criteria would not likely comply with
10 CFR 50.61a due to the unnecessary cost of implementation.
3.0

Estimation and Evaluation of Values and Impacts

This section describes the analysis conducted to identify and evaluate the benefits (values) and
costs (impacts) of this proposed rule. Section 3.1 identifies the attributes that the proposed rule
is expected to affect. Section 3.2 describes the methodology used to analyze the benefits and
costs associated with changes to the affected attributes. The results of the analysis are
presented in Section 4.
3.1

Identification of Affected Attributes

This section identifies the factors that the proposed rulemaking is expected to affect. These
factors are classified as “attributes” using the list of potential attributes provided in Chapter 5 of
the NRC’s “Regulatory Analysis Technical Evaluation Handbook.”1 Affected attributes from the
handbook include the following:
1

NUREG/BR-0184, “Regulatory Analysis Technical Evaluation Handbook: Final Report,” U.S. Nuclear Regulatory
Commission, Office of Nuclear Regulatory Research, January 1997.

-3-

•

Industry Implementation
Implementation of the new rule would require a licensee to submit a license amendment
to the NRC for review and approval, requesting that the licensee comply with the
proposed rule. This license amendment request would include analyses of the
licensee’s vessel under the embrittlement correlations and screening criteria in the
proposed rule through the plant’s end of life (40 or 60 years, as applicable). This
analysis is required to demonstrate the licensee’s compliance with the new regulation.
The licensee would be required to perform analyses of the volumetric examination of the
vessel to ensure that the proposed screening criteria and calculation methodology are
applicable. Additionally, the licensee would be required to report the manganese and
phosphorus content of the reactor vessel beltline materials.

•

Industry Operation
If implemented, the amended rule would differ from 10 CFR 50.61 only in that, during
plant operation, a licensee would be required to perform analyses of the volumetric
examination of the vessel to ensure that the proposed screening criteria and calculation
methodology are applicable.

•

NRC Implementation
The first component of the NRC implementation cost is the cost for NRC to complete the
final rule. The NRC would be affected by this proposed rule because of the level of
effort required to review and approve license amendment requests to comply with
10 CFR 50.61a.

•

NRC Operation
The NRC would be required to review and approve the licensee’s amendment requests,
including the submittal of the analysis of the volumetric examination inspection results of
the vessel under the amendment, to comply with 10 CFR 50.61a.

•

Improvements in Knowledge
The NRC and the nuclear industry would acquire additional data concerning vessel weld
flaws due to the additional analyses of the volumetric examination inspection results
under 10 CFR 50.61a. Each plant implementing the proposed rule would contribute to
improvements in NRC’s and industry’s knowledge of how well the new PTS rule fracture
toughness requirements apply to current reactor vessels. The additional insights gained
from these inspections could be used in future research projects, with the potential for
further revisions to the PTS rule.

•

Regulatory Efficiency
The NRC staff is of the opinion that proposing the amendment as an alternative rule is
the most efficient approach. This is accomplished by allowing the licensees to select the
option that best serves their situation without any effect on the public health and safety
-4-

and common defense and security.
The proposed rule is not expected to affect the following attributes:
•
•
•
•
•
•
•
•
3.2

public health (accident and routine)
occupational health (accident and routine)
property (onsite and offsite)
other government
general public
antitrust considerations
safeguards and security considerations; and
environmental considerations.
Estimation of Values and Impacts

•

Industry Implementation
The projected cost of a licensee implementing the proposed PTS rule is estimated at
0.6 full-time equivalent (FTE)2, or approximately $90,000. This implementation consists
of performing the required analyses, preparing the associated license amendment
request, and submitting it for review and approval by the NRC.
• Industry Operation
The projected additional cost to a licensee performing the analysis of the volumetric
examination inspection results is estimated at 0.3 FTE, or approximately $46,000, per
analysis. This includes performing the analysis and submitting it for review and approval
by the NRC. It would be performed with the vessel inspection frequency (currently every
10 years). This regulatory analysis assumes that the rule will take effect in 2009. The
timeframe for which costs are estimated is based on the remaining operating lives of the
relevant facilities. For this analysis, costs are estimated over an assumed period of
48 years, with costs discounted at a 7-percent and 3-percent discount rate every
10 years, as specified in NUREG/BR-0184, “Regulatory Analysis Technical Evaluation
Handbook.” The analysis makes a simplifying assumption that an average plant’s next
vessel inspection will occur 5 years from the rule’s implementation date and every
10 years thereafter through the assumed lifetime of the plant, including license renewal.
Assuming the 3-percent discount rate results in a discounted flow of funds of
approximately $116,200, while the 7-percent rate gives an estimated value of around
$60,200. Therefore, operating under 10 CFR 50.61a, those licensees would incur costs
projected to exceed those for operating under 10 CFR 50.61. For licensees not
projected to exceed the current PTS screening criteria within their plant lifetime, the NRC
staff does not expect that any licensees would benefit from implementing and operating
under 10 CFR 50.61a due to the cost of implementation and the inspection results

2

All cost estimates in this analysis are based on the NRC staff’s most recent estimate of labor rates to be used in
regulatory analyses of $105 per hour or an annual rate of $152,000 assuming 1446 hours worked in a year.

-5-

analyses required as described earlier, and would not change the licensee’s cost.
•

NRC Implementation
The NRC estimates that it will require approximately 1.2 FTE to complete the final rule
portion of this action. Using the same assumptions for labor rates expressed above, this
result in a cost of approximately $182,000. The NRC implementation costs are
estimated at 0.5 FTE or $76,000 in labor costs to review each license amendment
request. However, this cost must be compared with the NRC’s costs of having licensees
operate under the existing rule. Each licensee projected to exceed the current PTS
screening criteria within their plant lifetime would be expected to take compensatory
actions in 10 CFR 50.61. The extent of NRC resources would depend on the
compensatory actions taken. The NRC staff estimates that the resources required (per
licensee) could range from 0.1 to 2.0 FTE or from $15,000 to $300,000. Therefore, for
this attribute, the impact could range from a small savings to an increase in costs to the
NRC when a licensee would opt for the using the existing 10 CFR 50.61 instead of the
amended option.

•

NRC Operation
The projected additional cost to the NRC for reviewing the analysis required by the
amended rule is estimated at 0.1 FTE or $15,000 and would be performed with the
vessel inspection frequency (currently once every 10 years). Assuming the same
timeframe as used in the derivation of the industry operation costs, the discounted flow
of funds for NRC implementation per licensee is estimated at $38,000 using a 3-percent
discount rate and estimated at $20,000 using the 7-percent rate. There are no
alternatives to operating under the new rule after it has been implemented. For
licensees not projected to exceed the current PTS screening criteria within their plant
lifetime, the NRC staff does not expect that any current or future licensees would benefit
from implementing and operating under the amended rule, due to the additional
implementation and inspection results analyses required as described earlier, and would
not change the NRC’s cost.

•

Regulatory Efficiency
Regulatory efficiency is attained by permitting PWR licensees to select the option that is
most suitable for their situation without affecting public health and safety or common
defense and security. Further, the impact on the NRC is minimal.

4.0

Presentation of Results

This section presents the estimates of the benefits and costs in Section 4.1 and the
disaggregation analysis in Section 4.2

-6-

4.1

Benefits and Costs

The analyses performed in the technical basis for this rulemaking indicate that the degree of
PTS challenge for anticipated lifetimes and operating conditions for current operating PWRs is
low. Further, the U.S. domestic commercial operating fleet of 69 PWRs has a low probability of
exceeding either the limit on the maximum estimated mean through-wall crack frequency of
5x10-6 per year expressed by current PTS regulations or the proposed new value of 1x10-6 per
year, consistent with the Commission’s direction in their SRM for SECY-06-0124, on the PTS
Rulemaking Plan. As a result, the risk of PTS events is much lower than previously estimated.
Therefore, the screening criteria in 10 CFR 50.61 are considered unnecessarily conservative
and may impose unnecessary burden on licensees. These results provide the basis to support
a relaxation of the current PTS regulations while continuing to provide adequate protection to
public health and safety.
This proposed action, which would be adopted as an alternative to the current requirements,
would result in a burden reduction for some of those licensees with no increase in risk to the
public’s health and safety.
The current PTS rule, 10 CFR 50.61, requires licensees to take compensatory actions when the
value of RTPTS for any material in the beltline is projected to exceed the PTS screening criterion
using the plant’s projected end of license (EOL) fluence. First, the licensee shall implement
those flux reduction programs that are reasonably practical to avoid exceeding the PTS
screening criteria. If a licensee has no reasonably practical flux reduction program that will
prevent RTPTS from exceeding the PTS screening criteria using the EOL fluence, the licensee is
required to submit a safety analysis to determine what, if any, modifications to equipment,
systems, and operation are necessary to prevent potential failure of the reactor vessel as a
result of the postulated PTS events if continued operation beyond the screening criteria is
allowed. Reactor vessel annealing may also be implemented by a licensee to prevent
exceeding the screening criteria.
Under the proposed 10 CFR 50.61a, licensees that are projected to exceed the existing
requirements in 10 CFR 50.61 before the expiration of their licenses would not be required to
comply with the compensatory action requirements described in the preceding paragraph.
However, the alternatives to implementing the new rule for licensees that are projected to
exceed the PTS screening criteria within their plant lifetime are to either perform the
compensatory actions or to cease operation under 10 CFR 50.61. The cost of compensatory
actions in 10 CFR 50.61, including performing flux reduction, vessel annealing, and other
analyses, are estimated at $50 million, well exceeding the cost of implementing the proposed
rule. Further, the cost of ceasing operation and purchasing replacement power would exceed
the cost of implementing the proposed rule, because the replacement energy cost is estimated
at $1 million per day. Therefore, implementing the new PTS rule, 10 CFR 50.61a, would
provide savings to licensees projected to exceed the PTS screening criteria during their plant
lifetimes. For licensees not projected to exceed the PTS screening criteria within their plant
lifetime, the NRC staff does not expect that any licensees would benefit from implementing
10 CFR 50.61a, due to the additional costs associated with the required implementation
analyses as described earlier.
-7-

4.2

Disaggregation

In order to comply with the guidance provided in Section 4.3.2 (“Criteria for the Treatment of
Individual Requirements”) of the Regulatory Analysis Guidelines3, the NRC conducted a
screening review to ensure that the aggregate analysis does not mask the inclusion of individual
rule provisions that are not cost beneficial when considered individually and not necessary to
meet the goals of the rulemaking. The NRC has determined that this proposed rule does not
contain any individual rule provisions which are not necessary to meet the goals of the rule and,
therefore, complies with the NRC’s criteria for the treatment of individual requirements.
5.0

Decision Rationale for Selection of the Proposed Action

The NRC staff did not recommend Alternative 1, the no action option. The Commission, in the
SRM for SECY-06-0124, approved the rulemaking plan which directed the staff to proceed with
preparing a proposed rule. Further, licensees whose plants are projected to exceed the PTS
screening limits in the current rule would be required to implement the costly, mandatory
compensatory actions with no other alternative available. This option neither satisfies the
Commission’s SRM direction nor provides regulatory relief for some PWR licensees.
The NRC staff did not recommend Alternative 2. Under this alternative, all current PWR
licensees would incur additional regulatory burden from the requirement to re-analyze the plant
RTPTS values under the new rule. These designs have previously been licensed or certified
under the analysis methods and screening criteria defined in 10 CFR 50.61. As described
previously, Alternative 2 would constitute a backfit under 10 CFR 50.109 for these licensees.
Further, the NRC determined that the characteristics of advanced PWR designs were not
considered in the analysis of this proposed rule. The NRC cannot be assured that reactors that
commence commercial power operation after the effective date of this rule will have operating
characteristics and materials of fabrication similar to those evaluated as part of the technical
basis for the proposed rule. The NRC believes that applicants referencing certified designs
should not be allowed to use the alternatives provided by 10 CFR 50.61a. Therefore, the NRC
determined that it would be prudent to limit the applicability and use of 10 CFR 50.61a to
currently-operating plants only.
The NRC staff did not recommend Alternative 3. For the majority of PWR licensees, this
alternative would impose no additional regulatory burden to comply with 10 CFR 50.61a
because implementation of 10 CFR 50.61a would be voluntary. Although the Commission
directed the NRC staff to consider requiring that new reactors be required to comply with the
new rule, the NRC staff determined there was no benefit in requiring mandatory implementation
for applicants (i.e., non-licensed, non-design certified). This determination was based on the
fact that 10 CFR 50.61 is considered conservative and sufficient. As a result, the NRC staff saw
no benefit in requiring implementation of 10 CFR 50.61a for any licensee. Further, as stated
previously, the NRC determined that the characteristics of PWR reactors that commence
commercial power operation after the effective date of this rule designs were not considered in
the analysis of this proposed rule. Therefore, NRC concluded that the use of 10 CFR 50.61a
should be limited to currently operating plants only.
3

NUREG/BR-0058, Revision 4, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission,” U.S.
Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, September 2004.

-8-

The NRC staff recommends Alternative 4. This alternative complies with the Commission’s
SRM that approved the rulemaking plan to prepare a proposed rule. Also, this alternative
retains the requirements of the current rule for all PWR licensees, while providing alternative
requirements for PWR licensees choosing to implement these requirements. Further, this
alternative provides the necessary regulatory flexibility that some current PWR licensees will
need to continue to operate throughout their extended lifetimes. Although PWR applicants will
not be allowed to use the alternatives provided in the proposed rule, the current 10 CFR 50.61
is conservative but sufficient, and its requirements do not change as a result of this rulemaking.
The proposed 10 CFR 50.61a is more realistic yet sufficiently safe, and can be implemented by
any current PWR licensee. Therefore, the NRC staff recommends Alternative 4.
6.0

Implementation

This action is being published as a supplemental proposed rule for public comment in the
Federal Register. After addressing public comments, the final rule would take effect upon
Commission approval and publication of the final rule in the Federal Register.