Download:
pdf |
pdfOMB Number 2900-0208
Estimated Burden: 4 hours
ARCHITECT - ENGINEER FEE PROPOSAL
The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of
1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all
individuals who must complete this form will average 4 hours. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. This form or other agreed upon
format, is used by VA Resident Engineers to supervise your work and verify the work progression so that you may be paid.
DATE OF PROPOSAL
ESTIMATED NUMBER OF CONTRACT DRAWINGS
DESCRIPTION
A/E
VA
PROJECT
ARCHITECTURAL
SITE AND LANDSCAPING
STRUCTURAL AND BORINGS
SANITARY
PLUMBING
NAME OF ARCHITECT/ENGINEER
HEATING AND AIR CONDITIONING
ELECTRICAL
TOTAL NUMBER OF DRAWINGS
PART I - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS
LINE
NO.
EMPLOYEE HOURS
A. SALARY COSTS
A/E
COSTS
HOURLY
SALARIES
VA
A/E
VA
ARCHITECTURAL
1A
SUPERVISORS
1B
DESIGNERS
1C
DRAFTERS
1D
SPECIFICATION WRITERS
1E
TYPISTS
1F
ESTIMATORS
$
$
$
1G
1H
SUB-TOTAL
1I
SITE AND LANDSCAPING
2A
SUPERVISORS
2B
DESIGNERS
2C
DRAFTERS
2D
SPECIFICATION WRITERS
2E
TYPISTS
2F
ESTIMATORS
2G
2H
SUB-TOTAL
2I
STRUCTURAL AND BORINGS
3A
SUPERVISORS
3B
DESIGNERS
3C
DRAFTERS
3D
SPECIFICATION WRITERS
3E
TYPISTS
3F
ESTIMATORS
3G
3H
SUB-TOTAL
3I
SANITARY
4A
SUPERVISORS
4B
DESIGNERS
4C
DRAFTERS
4D
SPECIFICATION WRITERS
4E
TYPISTS
4F
ESTIMATORS
4G
4H
SUB-TOTAL
4I
VA FORM
JAN 1999 (R)
10-6298
PAGE 1 OF 9
PART I - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS (Continued)
LINE
NO.
EMPLOYEE HOURS
A. SALARY COSTS
A/E
COSTS
HOURLY
SALARIES
VA
A/E
VA
PLUMBING
5A
SUPERVISORS
5B
DESIGNERS
$
5C
DRAFTERS
5D
SPECIFICATION WRITERS
5E
TYPISTS
5F
ESTIMATORS
$
$
5G
5H
SUB-TOTAL
5I
HEATING AND AIR CONDITIONING
6A
SUPERVISORS
6B
DESIGNERS
6C
DRAFTERS
6D
SPECIFICATION WRITERS
6E
TYPISTS
6F
ESTIMATORS
6G
6H
6I
SUB-TOTAL
ELECTRICAL
7A
SUPERVISORS
7B
DESIGNERS
7C
DRAFTERS
7D
SPECIFICATION WRITERS
7E
TYPISTS
7F
ESTIMATORS
7G
SUB-TOTAL
7H
8A
8B
8C
8D
8E
8F
8G
8H
8I
SUB-TOTAL
9A
9B
9C
9D
9E
9F
9G
9H
9I
SUB-TOTAL
10
TOTAL SALARY COSTS
B. MISCELLANEOUS SALARY COSTS
DESIGN REVIEW TRIPS
11A
NO. REQUIRED
11B
SUPERVISORS
11C
DESIGNERS
11D
DRAFTERS
11E
SPEC. WRITERS
VA FORM
JAN 1999 (R)
# DAYS
10-6298
# PERS. REQUIRED
EMPLOYEE-DAYS
A/E
VA
EMPLOYEE-HOURS
A/E
VA
HOURLY
SALARIES
COSTS
A/E
VA
PAGE 2 OF 9
B. MISCELLANEOUS SALARY COSTS (Continued)
LINE
NO.
DESIGN REVIEW TRIPS
NO. REQUIRED
# DAYS
# PERS. REQUIRED
EMPLOYEE-HOURS
EMPLOYEE-DAYS
A/E
VA
A/E
11F
COSTS
HOURLY
SALARIES
VA
$
A/E
$
VA
$
11G
11H
SUB-TOTAL
DESIGN STAFF SITE TRIPS
12A
NO. REQUIRED
12B
SUPERVISORS
12C
DESIGNERS
12D
12E
12F
SUB-TOTAL
PRE-BID (CPM) CONFERENCE
13A
NO. REQUIRED
13B
SUPERVISORS
13C
DESIGNERS
13D
13E
SUB-TOTAL
13F
ANSWERING INQ. & ISSUING AMENDMENTS
14A
SUPERVISORS
14B
DESIGNERS
14C
DRAFTERS
14D
SPEC. WRITERS
14E
TYPISTS
14F
14G
SUB-TOTAL
14H
15
TOTAL MISCELLANEOUS SALARY COSTS
16
TOTAL SALARY COSTS - (Lines 10 + 15)
17
OVERHEAD:
18
PROFIT
19
TOTAL SALARY PROPOSALS - (Lines 16 + 17
% OF LINE 16
C. INCIDENTAL COSTS
LINE
NO.
DESIGN REVIEW TRIPS
NO. REQUIRED
20A
FIRST
20B
SECOND
20C
THIRD
20D
FOURTH
# DAYS
# PERS. REQUIRED
EMP. TRIPS
A/E
TRAVEL COSTS
VA
A/E
$
VA
$
EMP. DAYS
A/E
PER DIEM
VA
A/E
$
COSTS
VA
$
A/E
$
VA
$
20E
20F
20G
SUB-TOTAL
DESIGN STAFF SITE TRIPS
21A
NO. REQUIRED
21B
SUPERVISORS
21C
DESIGNERS
21D
21E
SUB-TOTAL
21F
PRE-BID (CPM) CONFERENCE
22A
NO. REQUIRED
22B
SUPERVISORS
22C
DESIGNERS
22D
22E
SUB-TOTAL
22F
VA FORM
JAN 1999 (R)
10-6298
PAGE 3 OF 9
C. INCIDENTAL COSTS (Continued)
EMP. TRIPS
LINE
NO.
A/E
23A
TRAVEL COSTS
VA
A/E
$
VA
$
EMP. DAYS
A/E
COSTS
PER DIEM
A/E
VA
$
VA
$
A/E
VA
$
$
$
$
$
$
23B
23C
23D
23E
23F
SUB-TOTAL
24A
24B
24C
24D
24E
24F
SUB-TOTAL
25A
25B
25C
25D
25E
25F
SUB-TOTAL
REPRODUCTION OF REVIEW MATERIAL
26A
26B
26C
26D
26E
26F
SUB-TOTAL
RENDERING (PERSPECTIVES)
NO. REQUIRED
27A
27B
27C
27D
27E
27F
SUB-TOTAL
28A
28B
28C
28D
28E
28F
SUB-TOTAL
29A
29B
29C
29D
29E
SUB-TOTAL
29F
30
TOTAL INCIDENTAL COSTS
31
*TOTAL PROPOSAL (LINE 19 + LINE 30)
*NOTE: This part of the fee is that which falls within the 6% limitation. See VAAR Section 836.606-73 for definitive information.
REMARKS
VA FORM
JAN 1999 (R)
10-6298
PAGE 4 OF 9
PART II - CONSTRUCTION PERIOD SERVICES
A. SHOP DRAWINGS, SUBMITTALS, ETC.,
SALARY COSTS
LINE
NO.
EMPLOYEE-HOURS
A/E
COSTS
HOURLY
SALARIES
VA
A/E
VA
ARCHITECTURAL
32A
32B
32C
32D
32E
SUPERVISORS
32F
ESTIMATORS
$
$
$
DESIGNERS
DRAFTERS
SPECIFICATION WRITERS
TYPISTS
32G
32H
SUB-TOTAL
SITE AND LANDSCAPING
33A
33B
33C
33D
33E
33F
33G
SUPERVISORS
DESIGNERS
DRAFTERS
SPECIFICATION WRITERS
TYPISTS
ESTIMATORS
SUB-TOTAL
33H
STRUCTURAL AND BORINGS
34A
34B
34C
34D
34E
SUPERVISORS
DESIGNERS
DRAFTERS
SPECIFICATION WRITERS
ESTIMATORS
34F
34G
SUB-TOTAL
SANITARY
35A
35B
35C
35D
35E
SUPERVISORS
DESIGNERS
DRAFTERS
SPECIFICATION WRITERS
ESTIMATORS
35F
35G
SUB-TOTAL
PLUMBING
36A
36B
36C
36D
36E
36F
SUPERVISORS
DESIGNERS
DRAFTERS
SPECIFICATION WRITERS
ESTIMATORS
36G
SUB-TOTAL
HEATING AND AIRCONDITIONING
37A
37B
37C
SUPERVISORS
37D
SPECIFICATION WRITERS
37E
ESTIMATORS
DESIGNERS
DRAFTERS
37F
SUB-TOTAL
37G
ELECTRICAL
38A
38B
38C
SUPERVISORS
38D
SPECIFICATION WRITERS
38E
ESTIMATORS
DESIGNERS
DRAFTERS
38F
SUB-TOTAL
38G
VA FORM
JAN 1999 (R)
10-6298
PAGE 5 OF 9
PART II - CONSTRUCTION PERIOD SERVICES
A. SHOP DRAWINGS, SUBMITTALS, ETC.,
SALARY COSTS (Continued)
LINE
NO.
EMPLOYEE-HOURS
A/E
$
39A
COSTS
HOURLY
SALARIES
VA
A/E
$
VA
$
39B
39C
39D
39E
39F
39G
SUB-TOTAL
40A
40B
40C
40D
40E
40F
40G
SUB-TOTAL
41
LINE
NO.
TOTAL SALARY COSTS
B. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONS
SALARY COSTS
SUPERVISORS
42B
DESIGNERS
42C
DRAFTERS
42D
SPECIFICATION WRITERS
A/E
COSTS
HOURLY
SALARIES
VA
$
ARCHITECTURAL
42A
EMPLOYEE-HOURS
A/E
$
VA
$
42E
42F
SUB-TOTAL
42G
SITE AND LANDSCAPING
43A
SUPERVISORS
43B
DESIGNERS
43C
DRAFTERS
43D
SPECIFICATION WRITERS
43E
43F
SUB-TOTAL
43G
STRUCTURAL AND BORINGS
44A
SUPERVISORS
44B
DESIGNERS
44C
DRAFTERS
44D
SPECIFICATION WRITERS
44E
44F
44G
SUB-TOTAL
SANITARY
45A
SUPERVISORS
45B
DESIGNERS
45C
DRAFTERS
45D
SPECIFICATION WRITERS
45E
45F
45G
SUB-TOTAL
PLUMBING
46A
SUPERVISORS
46B
DESIGNERS
46C
DRAFTERS
46D
SPECIFICATION WRITERS
46E
SUB-TOTAL
46F
VA FORM
JAN 1999 (R)
10-6298
PAGE 6 OF 9
PART II - CONSTRUCTION PERIOD SERVICES
LINE
NO.
EMPLOYEE-HOURS
B. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONS
SALARY COSTS (Continued)
A/E
COSTS
HOURLY
SALARIES
VA
A/E
VA
HEATING AND AIR CONDITIONING
$
47A
SUPERVISORS
47B
DESIGNERS
47C
DRAFTERS
47D
SPECIFICATION WRITERS
$
$
47E
47F
47G
SUB-TOTAL
ELECTRICAL
48A
SUPERVISORS
48B
DESIGNERS
48C
DRAFTERS
48D
SPECIFICATION WRITERS
48E
48F
SUB-TOTAL
49A
49B
49C
49D
49E
49F
SUB-TOTAL
50A
50B
50C
50D
50E
50F
SUB-TOTAL
51
TOTAL SALARY COSTS
52
TOTAL SALARY COSTS (Lines 41 + 51)
53
OVERHEAD
54
PROFIT
55
TOTAL LABOR PROPOSAL (Lines 52 + 53 + 54)
C. INCIDENTAL COSTS
56A
EMP. TRIPS
A/E
TRAVEL COSTS
VA
VA
A/E
$
$
EMP. DAYS
A/E
PER DIEM
VA
$
COSTS
VA
A/E
$
A/E
$
VA
$
56B
56C
56D
56E
SUB-TOTAL
57A
57B
57C
57D
SUB-TOTAL
57E
58A
58B
58C
58D
58E
SUB-TOTAL
59
TOTAL TRAVEL COSTS
TOTAL PROPOSAL (Lines 55 + 59)
60
REMARKS
VA FORM
JAN 1999 (R)
10-6298
PAGE 7 OF 9
PART III - SITE VISITS
EMPLOYEE TRIPS
A. SALARY COSTS
LINE
NO.
A/E
TOTAL HOURS
VA
A/E
VA
COSTS
HOURLY
SALARIES
A/E
VA
PRE-CONSTRUCTION CONFERENCE
61A
NO. VISITS
NO. DAYS
EMP. PER DAY
SITE VISITS
61B
NO. VISITS ONE EMPLOYEE - DAY EACH
INTERMEDIATE A/C INSPECTIONS
61C
NO. INSP.
NO. DAY EACH
EMP. PER DAY
FINAL INSPECTION
61D
NO. DAYS
EMPLOYEES PER DAY
61E
61F
62
SALARY COSTS:
SITE VISITS
63
OVERHEAD
% OF LINE 62
64
PROFIT
65
TOTAL SALARY COSTS (Lines 62 + 63 + 64)
A. TRAVEL COSTS
EMP. TRIPS
TRAVEL COSTS
EMP. DAYS
A/E
A/E
A/E
VA
VA
VA
COSTS
PER DIEM
A/E
VA
A/E
VA
PRE-CONSTRUCTION CONFERENCE
66A
NO. VISITS
66B
NO. VISITS, ONE EMPLOYEE - DAY EACH
NO. DAYS
EMP. PER DAY
SITE VISITS
INTERMEDIATE A/C INSPECTIONS
66C
NO. INSP.
NO. DAY EACH
EMP. PER DAY
FINAL INSPECTION
66D
NO. DAYS
EMPLOYEES PER DAY
66E
66F
67
68
TOTAL PROPOSAL FOR
TOTAL TRAVEL COSTS
SITE VISITS (Lines 65 + 67)
PART IV - CAPITULATION OF A/E PROPOSALS
69
*PART I - CONTRACT DRAWINGS AND SPECIFICATIONS (Line 31)
70
PART II - CONSTRUCTION PERIOD DUTIES (Line 60)
71
PART III - SITE VISITS,
72
AT $
$
$
$
$
$
$
$
$
PER VISIT
FOR A MAXIMUM OF: (Line 68)
TOTAL A/E PROPOSAL (Lines 31 + 60 + 68)
*NOTE: This part of the fee is that which falls within the 6% limitation. See VAAR Section 836.606-73 for definitive information.
PART V - CERTIFICATIONS
CERTIFICATION OF CURRENT COST OR PRICING DATA
This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.801 of the Federal Acquisition Regulation (FAR) and required under FAR
subsection 15.804-2 submitted, either actually or by specific identification in writing to the contracting officer or to the contracting officer's representative in support of . . . . . are accurate,
complete, and current as of . . . . . . This certification includes the cost or pricing data supporting any advance agreements between the offeror and the Government that are part of the proposal.
Name
Firm
Signature
VA FORM
JAN 1999 (R)
Title
Date of Execution
10-6298
PAGE 8 OF 9
NOTE: The Architect-Engineer shall check the certification below which is applicable to their enterprise, and if required, provide the necessary
substantiating information.
CERTIFICATION OF CONCURRENT SUBMISSION OF DISCLOSURE STATEMENTS
The offeror hereby certifies submission, as part of the proposal under this solicitation, copies of the Disclosure Statements as follows: (i) Original and one copy
to the cognizant Contracting Officer; (ii) one copy to the cognizant contract auditor; and (iii) one copy to the Cost Accounting Standards Board, 441 G. Street,
NW, Washington, DC 20548
DATE OF DISCLOSURE STATEMENT
NAME AND ADDRESS OF COGNIZANT CONTRACTING OFFICERS WHERE FILED
The offeror further certifies that practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices in the Disclosure Statements.
CERTIFICATION OF MONETARY EXEMPTION
The offeror hereby certifies that, together with all divisions, subsidiaries, and affiliates under common control, they did not (1) receive a single CAS-covered contract
award if $10 million or more; (2) Receive $10 million or more in CAS-covered contract awards during its preceding accounting period; (3) Receive less than $10 million
in CAS-covered contract awards during its preceding cost accounting period but such awards were 10 percent or more of total sales.
CERTIFICATION OF PREVIOUSLY SUBMITTED DISCLOSURE STATEMENTS
The offeror hereby certifies that the Disclosure Statements were filed as follows:
DATE OF DISCLOSURE STATEMENT
NAME AND ADDRESS OF COGNIZANT CONTRACTING OFFICERS WHERE FILED
The offeror hereby certifies that practices used in estimating costs in pricing this proposal are consistent with the cost accounting practices disclosed in this Disclosure Statement
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER
DATE
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER
DATE
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER
DATE
CONCUR - SIGNATURE AND TYPED NAME OF ARCHITECT - ENGINEER
DATE
CONCUR - SIGNATURE AND TYPED NAME OF CONTRACTING OFFICER
DATE
DISTRIBUTION: (082A) - CC: A/E and Proposed File
VA FORM
JAN 1999 (R)
10-6298
PAGE 9 OF 9
File Type | application/pdf |
File Title | JetForm:10-6298.IFD |
Author | vhacobickoa |
File Modified | 2008-10-02 |
File Created | 2004-12-03 |