Change justification per RIN AV37

0335 change justification per 0648-AV37.pdf

Fisheries Certificate of Origin

Change justification per RIN AV37

OMB: 0648-0335

Document [pdf]
Download: pdf | pdf
OMB Control No. 0648-0335, Fisheries Certificate of Origin
Justification for 1) Changing the FCO submission requirement deadline and 2) Changing
the designation of the official responsible for signing the FCO, on the FCO instructions.
Fisheries Certificates of Origin (FCOs) and Associated Certifications (change from 30 days
to 10 days submission requirement):
To import tuna, tuna products, and certain other fish products into the United States, FCOs and
associated certifications must be filed with both U.S. Customs and Border Protection (CBP;
Department of Homeland Security) and NMFS Southwest Region. Current regulations at 50 CFR
216.24(f)(3)(ii) require FCOs and associated certifications to be submitted to NMFS within 30
days of the shipment=s entry into the commerce of the United States. However, allowing 30 days
to submit the required certifications may hinder enforcement because the products will likely be
offered for sale, or purchased or consumed before violations of the regulations governing
certification are determined. A proposed rule (RIN 0648-AV37) would revise 50 CFR
216.24(f)(3)(ii) to require that FCOs and associated certifications be submitted to NMFS within
10 calendar days of the shipment=s entry into the commerce of the United States, to aid in
enforcement of the regulations. Section 50 CFR 216.24(f)(3) continues to require that FCOs
covering tuna processed in the United States be submitted only after endorsement by the final
processor or exporter.
FCO – Instructions for High Seas Driftnet Certification
The FCO instructions currently state that a responsible government official of the “harvesting
nation” must sign and date the High Seas Driftnet Certification for any shipments containing fish
exported from or harvested by a large-scale driftnet nation. To be consistent with regulations at
50 CFR 216.24(f)(6)(ii) which cite a responsible government official of the “large-scale driftnet
nation” as responsible for this signature, the instructions would be revised to substitute “largescale driftnet nation” for “harvesting nation”.


File Typeapplication/pdf
Authorskuzmanoff
File Modified2008-07-16
File Created2008-07-16

© 2024 OMB.report | Privacy Policy