INFORMATION COLLECTION REQUEST:
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) AND SEWAGE SLUDGE MANAGEMENT STATE PROGRAM REQUIREMENTS
November 2006
Prepared for
United States Environmental Protection Agency
Office of Wastewater Management
1200 Pennsylvania Avenue, NW
Washington, DC 20460
Prepared by
Tetra Tech, Inc.
10306 Eaton Place, Suite 340
Fairfax, VA 22030
EPA Contract Number EP-C-05-046
EPA Work Assignment Number 1-24
TABLE OF CONTENTS
1. IDENTIFICATION OF THE INFORMATION COLLECTION 1
1(a). Title of the Information Collection 1
1(b). Short Characterization/Abstract 1
1(c). Statutory and Regulatory Background 3
1(d). Current State NPDES/Sludge Program Status 4
2. NEED FOR AND USE OF THE COLLECTION 4
2(a). Need/Authority for the Collection 4
2(b). Practical Utility and Users of the Data 5
2(b)(i). State Program Requests 5
2(b)(ii). State Program Implementation 5
2(b)(iii). State Program Oversight 6
3. NON-DUPLICATION, CONSULTATIONS, AND OTHER COLLECTION CRITERIA 7
3(b). Public Notice Required Prior to ICR Submission to OMB 7
3(d). Effects of Less Frequent Collection 7
4. THE RESPONDENTS AND THE INFORMATION REQUESTED 8
4(a). Respondents and Standard Industrial Classification Codes 8
4(b). Information Requested 10
4(b)(i). State Program Requests 10
4(c). NPDES State Program Implementation 13
4(c)(i). Report on Compliance Evaluation 13
4(c)(ii). Recordkeeping of NPDES Program Information 13
4(c)(iii). Recordkeeping for Sludge Program Information 13
4(c)(iv). Inspection and Investigation of NPDES Permittees 14
4(c)(v). State Certification of EPA-issued Permits 17
4(d). EPA Oversight of NPDES State Program Implementation 17
4(d)(i). Submittal of NPDES Permit Information 17
4(d)(ii). Submittal of Noncompliance Information for Sludge Management Programs 19
5(b). Collection Methodology and Management 20
5(c). Small Entity Flexibility 20
6. ESTIMATING THE BURDEN AND COST OF THE COLLECTION 21
6(a). Estimating Respondent Burden 21
6(b). Estimating Respondent Cost 22
6(c). Estimating the Agency Burden and Cost 22
6(d). Total Burden Hours and Costs 24
6(e). Reasons for Changes in Burden 25
Attachment 2. State, Tribes, and U.S. Territories, NPDES/Sludge Program Status 42
EXHIBITS
Exhibit 1. Reporting Requirement Descriptions 2
Exhibit 2. Annual Number of Responses 9
Exhibit 3-A. Number of NPDES and Sludge Permits Administered by EPA and the States 10
Exhibit 3-B. Number of Local Pretreatment Programs 10
Exhibit 4-A. Annual Burden for Compliance Inspections: Municipal Facilities 16
Exhibit 4-B. Annual Burden for Compliance Inspections: Non-Municipal Facilities 16
Exhibit 5. Reporting Frequency 20
Exhibit 6. Annual Respondent Burden and Costs 21
Exhibit 7. Annual Federal Burden and Costs 23
Exhibit 8. Total Annual Burden and Costs 24
ICR: National Pollutant Discharge Elimination System (NPDES) and Sewage Sludge Management State Program Requirements.
EPA ICR No.: 0168.09
OMB Control No.: 2040-0057
This ICR is entitled Information Collection Request for NPDES and Sewage Sludge Management State Program Requirements. It is an update of OMB No. 2040-0057, which expires on November 30, 2006. Office of Management and Budget (OMB) Control No. 2040-0128. This ICR includes state program requirements for 561 federally recognized Native American Indian tribes and Alaska Native villages within the United States and 6 U.S. territories and the District of Columbia. It was prepared according to the guidance contained in the Office of Environmental Information=s (OEI=s) 2005 ICR Handbook. The handbook is the Agency's most current guidance document for preparing an ICR, and it follows the provisions of the Paperwork Reduction Act of 1995 and the OMB guidelines. The total respondent burden for the activities covered in this ICR is estimated as 1,013,802 hours, at a labor cost of $37,470,111
The purpose of the ICR is to update the current recordkeeping and reporting requirements associated with state NPDES and sludge programs. Three categories of reporting requirements are the subject of this ICR:
State Program Requests. This category includes the activities that states, tribes, U.S. territories, and the District of Columbia must complete to request a new NPDES or sludge program or that NPDES authorized states must complete to modify an existing program;
State Program Implementation. This category includes the activities that authorized states, tribes, U.S. territories, and the District of Columbia must complete to implement an existing program, such as recordkeeping and permit enforcement activities. The category also includes certification of EPA-issued permits by non-NPDES-authorized states, tribes, U.S. territories, and the District of Columbia;
State Program Oversight. This category includes the activities required of NPDES-authorized states, tribes, U.S. territories, and the District of Columbia so that EPA can satisfy its statutory requirements for state program oversight.
Exhibit 1 briefly describes the specific information activities included in each category.
Exhibit 1. Reporting Requirement Descriptions
Reporting Requirements |
Citation |
Description |
|
State Program Requests |
|
|
|
|
Request for NPDES Program Authorization |
40 CFR Part 123, Subpart B |
Contains requirements for states that wish to obtain an NPDES program authorization. |
|
Request for NPDES Partial Program Authorization |
CWA ' 402(n) |
Allows states to request authority to administer portions of the NPDES program. Reporting requirements parallel requests for full NPDES program authorization. |
|
Request for NPDES Program Modification |
40 CFR 123.62 |
Contains requirements for states that wish to modify an existing NPDES program. |
|
Request for Program Transfer/Withdrawal |
40 CFR 123.63, 123.64, 501.34 |
Outlines procedures for states to voluntarily transfer their NPDES program responsibilities back to EPA and for withdrawal of state programs due to unilateral EPA decision or in response to an interested party’s petition. |
|
Request for Sewage Sludge Program authorization |
40 CFR 501.11 |
Contains requirements for states that wish to obtain a sludge management program authorization. |
State Program Implementation |
|
|
|
|
Report on Compliance Evaluation |
40 CFR 123.26(b)(1) |
Requires states to submit information on compliance evaluation programs. |
|
Recordkeeping of NPDES Program Information |
40 CFR 123.26(e) |
Requires states to maintain a management information system for compliance evaluation activities. |
|
Recordkeeping for Sludge Program Information |
40 CFR 501.16 |
Requires states with sludge management programs to comply with the recordkeeping requirements outlined in 40 CFR 123.26. |
|
Inspection and Investigation of NPDES permittees |
40 CFR 123.26(b)(2) & (3) |
Requires states to inspect facilities to determine permit compliance, verify monitoring and other data supplied by permittees, and investigate violation reports from the public. |
|
Certification of EPA-Issued Permits |
40 CFR 124.53 & 124.54 |
Requires states to certify permit conditions and to ensure conformity with all applicable state laws. (Does not apply to sludge programs.) |
State Program Oversight |
|
|
|
|
Submittal of NPDES Permit Information |
40 CFR 123.43 & 123.44(j) |
Requires states to submit proposed NPDES permits and sludge permits for certain permittee categories to EPA. |
|
Submittal of Sludge Permit Information |
40 CFR 501.14(b) |
Requires states to submit proposed sludge permits to EPA as agreed to in the Memorandum of Agreement (MOA). |
|
NPDES Quarterly, Semiannual, and Annual Reports |
40 CFR 123.45 |
Requires quarterly and semiannual reports of major permittee violations, as well as annual statistical reports of non-major permittee violations and enforcement actions. |
|
Sludge Noncompliance Reports |
40 CFR 501.21 |
Requires annual reports providing inventory information and compliance monitoring summaries. |
The objective of the Clean Water Act (CWA) is to Arestore and maintain the chemical, physical, and biological integrity of the nation's waters@ (CWA section 101). The Environmental Protection Agency (EPA) controls and limits discharges of pollutants into U.S. waters from all point sources. The NPDES program, established under CWA section 402, is an important tool for controlling pollutant discharges. Under this program, discharges of pollutants to waters of the United States must be covered by an NPDES permit. The permit contains limitations on the amount of pollutants the discharger may discharge.
In addition, section 405 of the CWA requires EPA to regulate the use and disposal of sludge produced by publicly owned treatment works (POTWs) and other treatment works treating domestic sewage. These treatment works must obtain permits that incorporate EPA's technical standards for sludge use and disposal. The sludge requirements may be included in the facility's NPDES permit or in a separate “sludge-only” permit.
Under the NPDES program, states, Federally Recognized Indian Tribes (see Attachment 1), the District of Columbia and U.S. territories (Commonwealth of Puerto Rico, Virgin Islands, Guam, American Samoa, Commonwealth of the Northern Mariana Islands, and Trust Territories of the Pacific Islands) may acquire the authority to issue permits. In the absence of an authorized state program, EPA issues permits. States, tribes, and U.S. territories that administer NPDES programs are also required to obtain pretreatment authority1 (authority to require POTWs to establish pretreatment programs and to require that indirect dischargers meet pretreatment standards) and authority to issue permits to federal facilities. States, tribes, and U.S. territories also have the option of acquiring authority to issue general permits (permits that cover a group of similar discharges). If these program areas were not covered in the original authorization, states, tribes, and U.S. territories with existing NPDES programs must submit requests for program modifications to add pretreatment, federal facilities, or general permit authority. In addition, as federal statutes and regulations are modified, states, tribes, and U.S. territories must submit program modifications to ensure that their programs continue to meet federal requirements.
States, tribes, and U.S. territories also have the option of acquiring authority to operate a sludge management program. This program may be a component of a state NPDES program, or it may be administered as a separate program. To obtain authority to operate an NPDES or sludge program, a state, tribe, or territory must submit an application that includes a program description, attorney general's statement, draft Memorandum of Agreement (MOA) with the EPA region, and copies of the state's statutes and regulations.
Once a state, tribe, or territory obtains authority for an NPDES or sludge program, it becomes responsible for implementing the program in that jurisdiction. The state, tribe, or territory must retain records on the permittees and perform inspections. In addition, when a state, tribe, or territory obtains NPDES or sludge program authority, EPA must oversee the program. Thus, states, tribes, and U.S. territories must submit permit information and compliance reports to EPA.
When EPA issues a permit in an unauthorized state, tribe, or territory, that state, tribe, or territory must certify that the permit requirements comply with the water laws of the state, tribe, or territory. According to the CWA (section 510), states, tribes, and U.S. territories may adopt discharge requirements that are equal to or more stringent than the requirements in the CWA or federal regulations.
As of July 2006, a total of 45 of the 50 states and 1 of the 6 U.S. territories had obtained NPDES authority. This is a total of 46 delegated NPDES programs for the universe of 618 potential program delegations (50 states, 561 Federally Recognized Indian Tribes, 6 U.S. territories and the District of Columbia). Of these 46 states, tribes, or U.S. territories, 35 have authorized pretreatment programs, 41 have authority to issue permits to federal facilities, 45 have general permit programs, and 7 have sludge programs (see Attachment 2).
As shown on Attachment 2, 33 of the 46 NPDES-authorized states2 have full NPDES authority, including the authority to issue pretreatment permits, the authority to issue permits to federal facilities, and the authority to issue general permits, which is an optional component. Several of the remaining authorized NPDES-authorized states are working with EPA to put necessary statutes, regulations, and other provisions in place. Five hundred seventy-two states, tribes, or U.S. territories, and the District of Columbia (618 minus 46) do not administer any part of the NPDES program and are at various stages of program authorization. Some of the states, tribes, or U.S. territories without NPDES authority are working with EPA to develop a program, whereas others, including most of the tribes, have not requested, and might never request, any part of the NPDES program.
Section 402(a) of the CWA established the NPDES program, which requires issuance of a permit to control the discharge of pollutants, ensuring compliance with provisions of the CWA. In addition, section 402(b) of the act provides that any state, tribe, or territory may administer the NPDES program if it requests authority and receives EPA approval. The CWA requires submittal and approval of “a full and complete description of the program it [the state] proposes to establish and administer under state law . . . ”. The CWA further requires the state to submit “a statement from the Attorney General . . . that the laws of such state . . . provide adequate authority to carry out the described program.”
Section 405 of the CWA requires EPA to regulate the use and disposal of sludge produced by POTWs and other treatment works treating domestic sewage. On February 4, 1987, Congress passed the Water Quality Act of 1987 (WQA), which included significant changes to section 405 of the CWA. Section 405 now requires that technical standards be promulgated and that those standards be implemented through permits issued by EPA or authorized states. EPA’s Office of Science and Technology is responsible for promulgating the technical standards for sewage sludge use and disposal. EPA’s Office of Wastewater Management is charged with administering the sludge permitting program and the state permit programs.
The CWA also provides for EPA oversight of states, tribes, and U.S. territories that have been authorized to administer the NPDES program. CWA section 309 deals with the enforcement of permits, and section 402(c) and (d) deals with overall program oversight, including permit review and program withdrawal.
In the absence of an authorized state, tribal, or territorial program, EPA administers the NPDES program. CWA section 401 requires states to certify that EPA-issued NPDES permits establish “effluent limitations, and monitoring requirements necessary to assure that any applicant . . . will comply with any applicable effluent limitations and other limitations (pursuant to the CWA) and with any other appropriate requirement of state law . . .”. States, tribes, and U.S. territories may waive their right to certify permits if they wish. Section 510 provides that states, tribes, and U.S. territories may adopt requirements equal to or more stringent than standards established pursuant to CWA provisions.
EPA has promulgated regulations, at 40 CFR Parts 122 through 125, that establish the procedures and requirements of the NPDES program. Part 123 outlines state program requirements and establishes the information that must accompany a state’s request for program authorization. The submittal requirements for states requesting modification of an existing NPDES program are also established under Part 123. Part 501 contains requirements for states to gain authorization of a sludge management program.
The information collected by EPA is used to evaluate the adequacy of a state's NPDES or sludge program and to provide EPA with the information necessary to fulfill its function of statutory oversight over state program performance and individual permit actions. EPA will also use this information to evaluate states' requests for full or partial program authorization and program modifications. To evaluate the adequacy of a state's proposed program, appropriate information must be provided to ensure that proper procedures, regulations, and statutes are in place and consistent with CWA requirements.
2(b)(ii)(a). Report on Compliance Evaluation
40 CFR 123.26 requires each state to have a program that is capable of making comprehensive surveys of all facilities and activities subject to the state Director’s authority. The purpose of this survey is to identify persons subject to regulations who have failed to comply with permit application or other program requirements. States must make any compilation, index, or inventory of such facilities and activities available to the EPA Regional Administrator upon request. EPA and NPDES-authorized states can use comprehensive survey information for several purposes. One of the major uses is compliance assessment of a specific permittee or permittees. In addition, such data can be used to assess the trends of pollutant loading, as well as to identify new control needs for a group or category of permitted facilities. Survey data could lead to enforcement action, permit modification or revocation and reissuance, or a change in permit conditions.
2(b)(ii)(b). Recordkeeping of NPDES and Sludge Program Information
States must maintain records of NPDES permit applications, inspection reports, and noncompliance and enforcement information. States must have a management system in place to support compliance evaluation activities, to allow for the review of the effectiveness of state permitting and enforcement programs, and to generate noncompliance rates. The state uses the data in overseeing permittees and in generating reports on noncompliance and enforcement.
2(b)(ii)(c). Inspection and Investigation of NPDES Permittees
EPA and NPDES-authorized states use inspection data to assess compliance with permit conditions. Inspection data, in conjunction with other data (permittees’ self-monitoring data) are used to evaluate the need for EPA to initiate enforcement action. EPA headquarters uses inspection data to assess the adequacy of regional and state programs.
2(b)(ii)(d). Certification of EPA-issued Permits
When EPA issues permits in non-authorized states, the Agency must comply with state laws, including water quality standards. To comply with state laws, EPA regions use state certification information when they determine permit effluent limits. The CWA states that no permit may be issued by EPA unless such certification has been granted or the state waives certification.
The information included in this category is used to evaluate program implementation in authorized states. EPA uses the information when reviewing permits, assessing compliance, evaluating state and regional enforcement measures, generating noncompliance rates, establishing Agency priorities, formulating budgets, and analyzing federal and state programs. Monitoring of approved state programs also ensures continued compliance with the goals and requirements of the CWA and state programs themselves. Much of the information collected under this category is also used by the state in administering its program. The information is essential for adequate implementation of an NPDES program.
2(b)(iii)(a). Submittal of NPDES Permit Information
In the MOA, EPA regions and NPDES-authorized states define which permits the region will review and which permits it will not review. Generally, the region reviews all permits for major facilities, all general permits, and a small percentage of permits for minor facilities. The information submitted by states consists of all appropriate data necessary for permit review––application form, fact sheets, draft permits, and the like. EPA uses the information submitted by states to review state-issued permits for compliance with federal laws.
2(b)(iii)(b). Submittal of Sludge Permit Information
EPA uses the information submitted by states to review state-issued permits for compliance with federal laws.
2(b)(iii)(c). Quarterly, Semiannual, and Annual Reports
EPA’s ongoing monitoring of authorized state programs ensures continued compliance with the goals and requirements of the CWA and state programs. EPA uses information about permittees’ noncompliance to
Evaluate the effectiveness of state compliance enforcement programs
Support its own enforcement actions, if any, against dischargers in authorized states
Generate and publish noncompliance rates to be used in reports to offices within EPA and to OMB and Congress
2(b)(iii)(d). Submittal of Noncompliance Information for Sludge Management Programs
Sewage sludge noncompliance reports serve the same purposes as NPDES effluent noncompliance reports, which are described in section 2(b)(iii)(c). However, sewage sludge reports are required only annually.
EPA has examined all other reporting and recordkeeping requirements contained in the CWA and in the NPDES regulations. In addition, it has consulted the Government Information Locator Service (formerly Federal Information Locator Service) to determine whether similar or duplicate information is available elsewhere. EPA has determined that the information collection and reporting requirements considered in this ICR are not duplicated in other reports.
All the information collection and reporting requirements covered in this ICR involve original information that is not submitted under any other federal program or regulation. Consequently, no alternative means to collect the information are available.
The ICR was published in the Federal Register on March 7, 2006. The notice included a request for comments on the content and the impact on the regulated community. EPA received no comments.
EPA finalized all regulations containing the requirements addressed in this ICR after receiving comments from the public and the regulated community. EPA headquarters staff responsible for program oversight in the applicable program areas were contacted to provide revised information and data for this ICR.
EPA regional officials and representatives of authorized states meet at least annually to review state activities, evaluate progress toward meeting program goals, and so forth. In addition, the MOAs between authorized states and the EPA regions provide a mechanism for discussions about the programs. The result is a process of ongoing discussions between EPA and state officials to resolve problems as they arise and to ensure the smooth operation of NPDES and sludge programs nationwide.
Most of the information needed to meet the reporting and information collection requirements related to state programs is submitted at one time or as needed. The only exceptions are the quarterly noncompliance reports (QNCRs), semiannual and annual reports, and annual sludge reports, all of which are submitted at regular, specified intervals.
EPA, to fulfill its oversight responsibilities, needs current information about all state NPDES and sludge programs, including information about individual permits, enforcement cases, and state program performance. EPA must track permits, compliance activities, and enforcement actions to ensure that state programs are carrying out the provisions of the CWA in a timely manner. If reporting were to occur less frequently, data would not be current enough for EPA to effectively provide guidance for state programs, to review or comment on state actions, or to intervene in compliance or enforcement cases as necessary.
This information collection is in compliance with the Paperwork Reduction Act guidelines (5 CFR 1320.5(d)(2)).
Although highly unlikely, the information collected might contain confidential business information. If this is the case, the respondent may request that such information be treated as confidential. All confidential data will be handled in accordance with 40 CFR 122.7, 40 CFR Part 2, and EPA's Security Manual, Part III, Chapter 9, dated August 9, 1976. However, CWA § 308(b) specifically states that effluent data may not be treated as confidential.
This information collection does not include sensitive questions.
The respondents to this information request are all 50 states, 6 U.S. territories, the District of Columbia, and 561 Federally Recognized American Indian Tribes, which are not classified under the Standard Industrial Classification (SIC) system.
As shown on Exhibit 2, EPA anticipates an average of 19,434 responses each year for the information items in this ICR. In some cases, the number of responses for an information item depends on the number of NPDES permittees, which is summarized in Exhibits 3-A and 3-B. In most cases, the number of responses also depends on the number of states requesting new NPDES or sludge programs or on the number of states with existing programs. In calculating these numbers, the following was assumed:
During the next 3 years, one state will request full NPDES program authority and one state will request partial NPDES program authority.
During the next 3 years, the average number of states with NPDES authority will be 46. This number is calculated as follows:
Currently, 46 states have NPDES authority.
EPA estimates that two states will receive full or partial NPDES authority by 2009, bringing the total to 48. This would result in an average of 47 authorized (either fully or partially authorized) states in each year.
Although an average of 47 states would have approved programs, states with new programs would not submit all the information items, such as annual reports. Also, states with partial programs might not submit all the information items because they administer only part of the program. Therefore, this ICR assumes that the equivalent of 46 states per year administer the NPDES program.
During the next 3 years, nine states will request a sewage sludge program. Because there are seven currently approved programs, the addition of three new programs each year will result in an average of 13 approved programs operating per year.
In most cases, the respondents to this information collection will be required to submit several of the items listed in Exhibit 2. The respondents include states requesting new NPDES or sludge programs, states that administer NPDES or sludge programs, and states that do not administer NPDES programs.
Because all states are required to respond to at least one information item, this ICR assumes an average of 618 respondents per year (all states plus six U.S. territories, the District of Columbia and 561 Federally Recognized Indian tribes).3
Exhibit 2. Annual Number of Responses
Type of Response (Regulation) |
Responses Per Year |
|
1 |
Request for NPDES program approval (40 CFR § 123.21) |
0 |
2 |
Request for partial NPDES program approval (CWA § 402(n)) |
0 |
3 |
Request for NPDES program modification (40 CFR § 123.62) |
1 |
4 |
Request for program transfers/withdrawals (40 CFR § 123.64) |
3 |
5 |
Request for sewage sludge program approval (40 CFR § 501.11) |
3 |
6 |
Report on compliance evaluation (40 CFR § 123.26(b)(1)) |
0 |
7 |
Recordkeeping of NPDES program information (40 CFR § 123.26(e)) |
46 |
8 |
Recordkeeping for sewage sludge program information (40 CFR § 501.16) |
13 |
9 |
Inspection and investigation of NPDES permittees (40 CFR §§ 123.26(b)(2) and (3)) |
18,805 |
10 |
Certification of EPA - issued permits (40 CFR §§ 124.53 and 124.54) |
260 |
11 |
Submittal of NPDES permit information (40 CFR §§ 123.43 and 123.44(j)) |
46 |
12 |
Submittal of sludge permit information (40 CFR § 501.14(b)) |
13 |
13 |
Quarterly, semi-annual, and annual reports (40 CFR § 123.45) |
230 |
14 |
Annual sewage sludge program reports from authorized states(40 CFR § 501.21) |
13 |
|
Total Number of Responses |
19,434 |
Exhibit 3-A. Number of NPDES and Sludge Permits Administered by EPA and the States
Type of permittee |
States |
EPA |
Total |
Major NPDES permits |
|
|
|
Municipal |
3,991 |
249 |
4,240 |
Non-municipal |
2,114 |
137 |
2,251 |
Federal |
84 |
11 |
|
Subtotal (not including federal) |
6,105 |
386 |
6,491 |
|
|
|
|
Minor NPDES permits |
|
|
|
Municipal |
10,543 |
229 |
10,772 |
Non-municipal |
32,138 |
596 |
32,734 |
Federal |
547 |
89 |
|
Subtotal (not including federal) |
42,681 |
825 |
43,506 |
|
|
|
|
General NPDES permits (approx.) |
400 |
40 |
440 |
|
|
|
|
Total (not including federal) |
49,186 |
1,251 |
50,437 |
Sludge permits |
1,606 |
3,193 |
4,799 |
Source: Permit Compliance System (PCS), July 2006. |
Exhibit 3-B. Number of Local Pretreatment Programs
|
States |
EPA |
Total |
Number of local pretreatment programs |
1,064 |
400 |
1,464 |
Source: Revision of the Information Collection Request for the National Pretreatment Program (40 CFR Part 403). OMB Control No. 2040-0009; EPA ICR No. 0002.12. September 20, 2005 |
4(b)(i)(a). Request for NPDES Program Authorization
States requesting NPDES program authorization must submit three copies of a program submission (40 CFR 123.21). Each submission must contain all the following:
A letter from the state's Governor (or Tribal Authority) requesting program authorization.
A complete program description that summarizes the structure, scope, coverage, and processes of the proposed state program and outlines the state's permitting and review procedures. In addition, copies of all relevant permit forms, application forms, and reporting forms must be submitted.
A statement from the state attorney general certifying that the state laws provide adequate authority to carry out the program requirements as outlined in the program description.
An MOA between the state Director and the EPA Regional Administrator. The MOA must clarify the division of responsibilities between the state agency and EPA. It also must specify the procedures that will ensure adequate coordination between EPA and the state, and it must discuss this coordination in detail. In particular, it must address compliance activities, enforcement activities, and the transfer of information between the state and EPA. It must also describe which classes and categories of permits the Regional Administrator must review before a permit is issued by the state and further specify those classes for which the Regional Administrator will waive review.
Copies of all relevant state regulations and statutes.
As mentioned previously, one state is expected to request full program authorization during the life of the ICR (an average of 0.33 states per year). The estimated average time to prepare a state NPDES program application can vary from a relatively small burden (predominately reflecting copying time) to several work years where complete regulatory and statutory changes are necessary. In most cases, at least some regulatory changes are necessary. It is impossible to determine the “average” burden for this reporting requirement because the burden depends on many different factors. For the purposes of this ICR, one work year (2,080 hours) is estimated to reflect the burden for states requesting program authorization. The average federal government burden for the review of state program requests is 1,248 hours.
4(b)(i)(b). Request for Partial NPDES Program Authorization
The 1987 WQA authorizes EPA to approve states for two types of partial programs (CWA ' 402(n)): (1) major category partial programs and (2) phased partial programs.
States apply for major category partial program authority if more than one state agency has jurisdiction over discharges. Any state applying for a major category partial program must comply with existing 40 CFR Part 123, Subpart B, State Program Submission requirements. Under the phased partial program, states obtain authority for the entire NPDES program over a 5-year period. The requirements for submittal of major category partial program and phased partial program requests are essentially the same as the requirements for the submittal of a full NPDES program request, as discussed above.
EPA anticipates that one state will seek partial program authorization during the life of this ICR (an average of 0.33 state per year). Because the elements of the partial program application are expected to be the same as those for program authorization, it is assumed that the burden for partial programs equals the burden for a full program (one work year, or 2,080 hours). Like full NPDES program requests, the average federal government burden for the review of state program requests is 1,248 hours.
4(b)(i)(c). Request for NPDES Program Modifications
EPA or an authorized state may initiate a program revision. A program revision might be necessary when the controlling federal statutes or regulations are modified. When necessary, the state is required to submit a modified program description, an attorney general’s statement, an MOA, or other documents necessary to describe and evaluate whether the program revision is substantial and requires public notice. States may modify their programs to obtain pretreatment authority (covered by a separate ICR), authority to issue general permits, or authority to issue permits to federal facilities. They must also update other areas of their programs as necessary.
Request for Authority to Issue General Permits. General permits cover a class of similar dischargers with similar effluent limitations in a defined geographic area. Authority to issue general permits is an optional component of the NPDES program. Currently, 45 states have general permit authority. EPA intends to increase its use of general permits and is encouraging states without general permit authority to obtain it. States seeking to modify their NPDES programs to obtain general permit authority must revise their attorney general’s statement, program description, and MOA. Is some cases, they must also revise their statutes and regulations.
Request for Authority to Issue Permits to Federal Facilities. NPDES-authorized states are required to obtain authority to issue NPDES permits to federal facilities. Currently 41 states are authorized to regulate federal facilities. States seeking to modify their NPDES programs to obtain this authority in most cases revise their attorney general’s statement, program description, and MOA. In some cases, they must also revise their statutes and regulations.
Request to Update Legal Authority in Other Areas. Under 40 CFR 123.62(e), state NPDES and sludge programs must be in compliance with federal regulations at all times. If new federal requirements are enacted, states have 1 year to update their regulations to meet the federal requirements. States have 2 years if they must also update statutes. States seeking to modify their NPDES programs to update their authority must normally revise their statutes or regulations. In some cases, they must also revise their attorney general’s statement, program description, or MOA.
As discussed previously, 1 of the 46 authorized NPDES-authorized states does not have authority to issue general permits, and 5 do not have authority to issue permits to federal facilities. It is not expected that these states will request such authorities during the next 3 years. It is anticipated that four states will revise their programs to update their authorities. Therefore, the number of requests for program modification expected during the next 3 years is four. This number results in an average of 1.33 states per year.
For the purposes of this ICR, a burden estimate of 250 hours is used for program modifications. EPA staff will require 50 hours to review each request for program modification.
4(b)(i)(d). Request for Program Transfers
A state may request that an approved program be transferred back to EPA. Transfers back to EPA require 180 days’ notice by the state, as well as a plan for the orderly transfer of all relevant program information. If necessary, EPA may require that the state provide further information. In addition, EPA may initiate proceedings to determine whether an authorized state program should be withdrawn because of the state's failure to administer its program in accordance with federal requirements.
Withdrawal proceedings may be initiated not only unilaterally by EPA but also in response to a petition submitted by an interested party. On the basis of the analysis for the active ICR, EPA estimates that an average of three petitions per year will be submitted in the next several years. It is estimated that on average, the review of each petition will require 480 state hours and 240 EPA hours. EPA has never withdrawn a program, and does not anticipate doing so in the next 3 years.
4(b)(i)(e). Request for Sludge Program Authorization
On August 24, 1998, EPA promulgated revised regulations setting forth minimum requirements for state sludge programs. These revisions specify that all state sludge management program submissions must be submitted under 40 CFR Part 501, regardless of whether the state seeks a revision to an NPDES program or a non-NPDES program. The requirements for a sewage sludge program are contained in 40 CFR Part 501.
The first requirement for submittal of a state sludge program is the program description, which contains the scope, structure, coverage, and processes of the state program. The state must also submit a statement from the state attorney general outlining its legal authority to impose the sludge requirements. The program submission must also include an MOA between the state Director and the EPA Regional Administrator that, in part, sets forth the state's approach to administering the sludge program and EPA’s role in overseeing the state’s administration.
Nine states are expected to seek authorization of sludge management programs over the life of the ICR. This results in an average of three requests from states per year. States requesting authority to implement sludge programs will expend an estimated 750 hours per request per year. The federal government will be required to review and process each state program submission, expending approximately 400 hours per request per year.
40 CFR 123.26 requires states to have a program that is capable of making comprehensive surveys of all facilities and activities subject to the state Director's authority. The purpose of this survey is to identify persons subject to regulations who have failed to comply with permit application or other program requirements. States must make any compilation, index, or inventory of such facilities and activities available to the EPA Regional Administrator upon request. Comprehensive surveys and inspections are covered under “Inspection and Investigation of NPDES Permittees,” discussed below. Surveys of any facilities and activities may be conducted, subject to NPDES program authority, to identify persons that are subject to regulation who have failed to comply with permit application or other program requirements. During the life of this ICR, EPA does not expect to request any of this information.
40 CFR 123.41(a) requires that Aany information obtained or used in the administration of a state program shall be available to EPA upon request without restriction.@ NPDES-authorized states are also required to keep such records and to submit such information as is reasonable to ascertain whether the state program complies with the requirements of the CWA and the NPDES regulations, consistent with 40 CFR 123.43(d). Recordkeeping must include all notices and reports required of permittees and other regulated persons.
The respondents to this information item are the 46 NPDES-authorized states. Although the burden for this activity can vary widely, the average burden to NPDES-authorized states has been determined to be 50 hours, based on past burden estimates. Because this requirement pertains to only the state program, there is no federal burden associated with this information requirement.
States with EPA-authorized sludge management programs must retain information about program and permittee compliance with federal requirements. This information is the same as that required of states with authorized NPDES program, as noted above.
As discussed above, EPA expects nine requests for state sewage sludge programs over the next 3 years (three in the first year, with an additional three in each of the next 2 years). Thus, this requirement will affect an average of 13 states per year (the average of the existing 7 programs and the additional three new programs per year). The average burden to states with sludge programs is estimated to be the same as the recordkeeping burden for NPDES-authorized states, 50 hours. Because this requirement pertains to only the state programs, there is no federal burden associated with this information requirement.
The respondents to this item are the 46 NPDES-authorized states. As part of NPDES program implementation, inspections are performed on permitted facilities to assess compliance with permit requirements. The NPDES regulations at 40 CFR 123.26(e)(5) require major permittees to be inspected at least once annually. In addition, an estimated 20 percent of minor facilities are inspected each year.
When facilities are inspected, states must submit their findings to EPA. The information collected and reported by the state may include sampling data, status of compliance with permit requirements such as construction schedules and reports, and evaluation of a permittee’s sample collection and analysis methodology. The information varies depending on the type of inspection conducted; it is used to assess compliance with NPDES permit requirements and to verify permittees’ reporting. The various types of inspections4 are:
Compliance Sampling Inspections (CSI). During the CSI, representative samples required by the permit are obtained. Chemical analyses are performed, and the results are used to verify the accuracy of the permittee’s self-monitoring program and reports, determine the quantity and quality of effluents, develop permits, and provide evidence for enforcement proceedings where appropriate. In addition, CSIs include the same objections and tasks as a Compliance Evaluation Inspection, discussed below. The estimated burden for the inspection is 120 hours.
Compliance Evaluation Inspections (CEI). The CEI is a nonsampling inspection designed to verify the permittee’s compliance with applicable permit self-monitoring requirements and compliance schedules. This inspection involves record reviews, visual observations, and evaluations of the treatment facilities, effluents, receiving waters, and so forth. The CEI examines both chemical and biological self-monitoring and forms the basis for all other inspection types except the Reconnaissance Inspection. The estimated burden for this inspection is 24 hours.
Performance Audit Inspections (PAI). The PAI is used to evaluate the permittee’s self-monitoring program. Like a CEI, the PAI is used to verify the permittee's reported data and compliance through a records check. In a CEI, the inspector makes a cursory visual observation of the facility, effluents, and receiving waters. In a PAI, the inspector actually observes the permittee performing the self-monitoring process from sample collection and flow measurement through laboratory analyses, data workup, and reporting. The PAI inspector may leave a check sample for the permittee to analyze. Compared to a CSI, the PAI is less resource-intensive because sample collection and analyses by the state are not included. The estimated burden for this inspection is 96 hours.
Diagnostic Inspections (DI). The DI primarily focuses on POTWs that have not achieved permit compliance. POTWs that are having difficulty diagnosing their problems are targeted. The purpose of the DI is to identify the causes of noncompliance and to suggest immediate remedies that will help the POTW achieve compliance. Once the cause of noncompliance is defined, an administrative order that requires the permittee to conduct a detailed analysis and develop a composite correction plan is usually issued. The estimated burden for this inspection is 128 hours.
Compliance Biomonitoring Inspection (CBI). The CBI uses acute and chronic toxicity testing techniques to evaluate the biological effect of a permittee’s effluent discharge(s) on test organisms. In addition, this inspection includes the same objectives and tasks as a CEI. The estimated burden for this inspection is 240 hours.
Toxic Sampling Inspection (XSI). The XSI has the same objectives as a conventional CSI; however, the XSI places increased emphasis on toxic substances regulated by the NPDES permit. The XSI covers priority pollutants other than heavy metals, phenols, and cyanide, which are typically included in a CSI. An XSI uses more resources than a CSI because highly sophisticated techniques are required to sample and analyze toxic pollutants. The estimated burden for this inspection is 280 hours.
Reconnaissance Inspection (RI). The RI is used to obtain a preliminary overview of a permittee’s compliance program. The inspector conducts a brief visual inspection of the permittee’s treatment facility, effluents, and receiving waters. The RI uses the inspector's experience and judgement to quickly summarize any potential compliance problems. The objective of the RI is to expand inspection coverage without increasing inspection resources. The RI is the briefest of all NPDES inspections: the estimated burden for this inspection is 8 hours.
Pretreatment Compliance Inspection (PCI). The PCI evaluates the POTW’s implementation of its authorized pretreatment program. It includes a review of the POTW’s records on monitoring, inspections, and enforcement activities for its industrial users. The PCI may be supplemented with industrial user inspections. The estimated burden for this inspection is 24 hours.
A Compliance Inspection Report (CIR) form was developed for inspectors to use when submitting the qualitative results of CSIs, CEIs, PAIs, and DIs. In most cases, the form is not used, but the information collected and reported is usually the same, except for those states that require and collect more information.
Exhibits 4-A and 4-B summarize the number of inspections, the burden associated with each type of inspection, and the total burden for this information activity. For this calculation, it is assumed that there are a total of 2,114 major and 32,138 minor non-municipal facilities and a total of 3,991 major and 10,543 minor municipal facilities (Exhibits 3-A and 3-B). Of the major facilities (non-municipal and municipal), 15 percent receive CSIs, 60 percent receive CEIs, 15 percent receive PAIs, 17 percent receive CBIs, four percent receive XSIs, and 40 percent receive RIs. In addition, 5 percent of municipal facilities receive DIs and 80 percent of POTWs with authorized pretreatment programs receive PCIs. Of the minor facilities (both non-municipal and municipal), 3 percent receive CSIs and 17 percent receive CEIs. Therefore, the total annual number of inspections conducted is estimated to be 18,805 (7,078 + 2,108 + 3,192 + 6,427) inspections at 996,528 (453,176 + 80,928 + 215,632+ 246,792) hours.
Exhibit 4-A. Annual Burden for Compliance Inspections: Municipal Facilities
Number of Major Facilities: |
3,991 |
Percent covered (%) |
Facilities Covered |
Hours per Inspection |
Total Hours |
||||
Number of Minor Facilities: |
10,543 |
||||||||
Type of Inspection |
Majors |
Minors |
Majors |
Minors |
Majors |
Minors |
Majors |
Minors |
|
Compliance Sampling Inspection (CSI) |
15 |
3 |
599 |
316 |
120 |
120 |
71,880 |
37,920 |
|
Compliance Evaluation Inspection (CEI) |
60 |
17 |
2,395 |
1,792 |
24 |
24 |
57,480 |
43,008 |
|
Performance Audit (PAI) |
15 |
0 |
599 |
- |
96 |
96 |
57,504 |
0 |
|
Diagnostic Inspection (DI) |
5 |
0 |
200 |
- |
128 |
128 |
25,600 |
0 |
|
Compliance Biomonitoring Inspection (CBI) |
17 |
0 |
678 |
- |
240 |
240 |
162,720 |
0 |
|
Toxics Sampling Inspection (XSI) |
4 |
0 |
160 |
- |
280 |
280 |
44,800 |
0 |
|
Reconnaissance Inspection(RI) |
40 |
0 |
1,596 |
- |
8 |
8 |
12,768 |
0 |
|
Pretreatment Compliance Inspection (PCI) |
50 |
851 |
24 |
20,424 |
|||||
Total |
- |
- |
7,078 |
2,108 |
- |
- |
453,176 |
80,928 |
Exhibit 4-B. Annual Burden for Compliance Inspections: Non-Municipal Facilities
Number of Major Facilities: |
2,114 |
Percent covered (%) |
Facilities Covered |
Hours per Inspection |
Total Hours |
||||
Number of Minor Facilities: |
32,138 |
||||||||
Type of Inspection |
Majors |
Minors |
Majors |
Minors |
Majors |
Minors |
Majors |
Minors |
|
Compliance Sampling Inspection (CSI) |
15 |
3 |
317 |
964 |
120 |
120 |
38,040 |
115,680 |
|
Compliance Evaluation Inspection (CEI) |
60 |
17 |
1268 |
5463 |
24 |
24 |
30,432 |
131,112 |
|
Performance Audit (PAI) |
15 |
0 |
317 |
0 |
96 |
96 |
30,432 |
0 |
|
Compliance Biomonitoring Inspection (CBI) |
17 |
0 |
359 |
0 |
240 |
240 |
86,160 |
0 |
|
Toxics Sampling Inspection(XSI) |
4 |
0 |
85 |
0 |
280 |
280 |
23,800 |
0 |
|
Reconnaissance Inspection(RI) |
40 |
0 |
846 |
0 |
8 |
8 |
6,768 |
0 |
|
Total |
151 |
20 |
3,192 |
6,427 |
- |
- |
215,632 |
246,792 |
The burden for the federal government is based on the time required to review the CIRs or the pretreatment checklists.5 Based on previous experience, 90 percent (16,924) of the inspection reports will require an initial review of 0.5 hour, while the remaining 10 percent (1,881) will require a more intensive review of 5 hours. Thus, the total annual review time is estimated at 17,868 hours, calculated as follows:
Total burden for federal government to review CIR forms requiring only an initial review:
16,925 reports * 0.5 hour = 8,463 hours
Total burden for federal government to review CIR forms requiring an intensive review:
1,881 reports * 5 hours = 9,405 hours
Total annual federal burden for this information requirement: 17,868 hours
When EPA issues permits in non-NPDES-authorized states, the Agency must ensure that the permits are in compliance with state laws, including water quality standards. EPA may not issue a permit in an unauthorized state until the state certifies that the permit is in compliance with state laws. Certification is usually supplied by the state with the permittee’s application form or at the time the draft permit is completed.
The regulations require that certifications be in writing and that they identify the conditions necessary to ensure compliance with applicable provisions of the CWA and state laws. When certification accompanies a draft permit, it must include any conditions more stringent than those in the draft permit that the state finds necessary to meet the CWA or state requirements. It must also list permit conditions that can be made less stringent without violating state law requirements, including water quality standards. States may waive their certification rights, and a certification is considered waived if the state does not specifically certify or deny certification within a reasonable period.
The respondents to this information item are the 572 states without NPDES programs.6 As of July 2006, there were 1,211 EPA-issued permits, 386 major permits, and 825 minor permits. It is assumed that each year EPA reissues 20 percent of these permits, or an average of 242 permits each year. Based on new permits reported in PCS for years 2003, 2004 and 2005, EPA estimates that on average the number of new permits issued each year will be 18. The respondent burden for certifying these permits varies because of differing state procedures, level of involvement with EPA in developing the permit, and permit complexity. The average respondent burden is estimated to be 4 hours. The burden to the federal government is not applicable because the federal activities are part of the permitting process and impose no further burden.
Federal regulations require that “any information obtained or used in the administration of a state program shall be available to EPA upon request without restriction” (40 CFR 123.41(a)). Information submitted to EPA includes permit program forms and any other relevant information specified in the MOA between EPA and the state. At a minimum, the required information includes copies of completed permit application forms, draft and final permits, permit modifications, and related information (e.g., notices of state actions, public comments) unless EPA waives permit review.
The respondents to this information item are the estimated 46 states with NPDES programs. It is assumed that the states treat this information collection as an ongoing activity, rather than as a set of discrete reports. The burden estimates for the remainder of this ICR are based on 46 states having program authorization.
The annual burden for these states is estimated to average 22.7 (1,045.3 hours for 46 states) hours per state, calculated as follows:
States must submit all major permits, about 5 percent of minor permits, and all general permits.
As of July 2006, there were 6,105 major, 42,681 minor, and approximately 400 general permits in the 46 NPDES-authorized states. Each permit can have a life span of 5 years, so an average of 1,221 major, 8,536 minor, and approximately 80 general permits are issued each year.
In addition, EPA estimates that authorized states will issue 98 new major, 895 new minor, and 44 new general permits each year. Accordingly, the estimated number of major permits for each year of the ICR is 1,319 (1,221 + 98), the estimated number of minor permits is 9,431 (8,536 + 895), and the estimated number of general permits is 125 (80 + 45).
Seventy percent of the major (923), 5 percent of the minor (472), and 100 percent of the general permits (125) require 10 minutes (0.17 hour) for transmittal to EPA. The remaining 30 percent of major permits (396) require 2 hours of transmittal time. The total number of NPDES certifications equals an average of 1,916 per year (923 + 472 + 125 + 396)).
Thus, the total annual burden is as follows:
(923 majors + 472 minors + 125 general ) * 0.17 hours = 253.3 hours
396 majors * 2 hours = 792.0 hours
Total = 1045.3hours
4(d)(i)(a). Submittal of Sludge Permit Information
EPA expects to receive 45 reports of sludge permits over a 3-year period, yielding an average of 15 permits per year (EPA ICR No. 0168.08). Each permit will require 10 minutes (0.17 hour) to be transmitted to EPA. The total burden for this reporting requirement is 2.5 hours (14.7 reports x 0.17 hour), or 0.19 hour per state. There is no federal burden associated with this information item.
4(d)(i)(b). Quarterly, Semi-annual, and Annual Reports
NPDES regulations require that each EPA region and authorized state prepare quarterly, semiannual, and annual noncompliance reports. These reports are:
Quarterly Noncompliance Reports (QNCRs––40 CFR 123.45. Authorized states must submit to EPA quarterly reports of noncompliance by major permittees. These reports include the name, location, and permit number of the facility; the date and a brief description of each instance of noncompliance; the date and a brief description of action taken by the state; the status of noncompliance or the date noncompliance was resolved; and any details that explain or mitigate the noncompliance.
Semiannual Statistical Summary Reports––40 CFR 123.45. Each semiannual report must indicate the number of major permittees with two or more violations of the same monthly average limitation during the past six months. Authorized states must submit these reports along with the first and third QNCRs.
Annual Statistical Summary Reports––40 CFR 123.45. These reports must indicate the number of all non-major permittees reviewed, the number in noncompliance, the number of enforcement actions taken, and the number of permits modified to extend compliance deadlines. A list of non-majors that are one or more years behind the construction phases of the compliance schedule is also required.
The respondents to this information item are the estimated 46 NPDES-authorized states. Each year, these 46 states must develop four QNCRs, two semiannual summary reports, and one annual summary report. Because the semiannual and annual summary reports are normally prepared along with the QNCRs, and because states have indicated that the burden for these reports has lessened, this ICR assumes (for simplicity) that each NPDES state prepares the equivalent of five QNCRs each year. The work involved ranges from manually preparing reports, which includes reviewing individual inspection reports, to copying data generated by the EPA Permit Compliance System (PCS) onto QNCR forms.7 This results in 230 annual responses (46 states x 5). EPA estimates an average respondent burden of 25 hours per report. The government burden for this information item is estimated at 15 hours, including 8 hours of review by EPA regions and 7 hours of review by EPA headquarters.
Annual Sewage Sludge Program Reports––40 CFR 501.21
Under 40 CFR 501.21, annual reports must provide, at a minimum, updated inventory information of all sewage sludge generators and sludge disposal facilities and a summary of all instances of noncompliance over the previous year.
The respondents for this item are the average of 13 states with sewage sludge programs. The estimated burden for completing this report is 84 hours, and the federal review time is estimated at 55 hours per report.
This ICR includes all the reporting requirements related to state program requests, state NPDES and sludge program implementation, and EPA overview of state NPDES and sludge programs. Under CWA section 402(c) and (d), EPA must ensure that state program requests and state program modification requests meet all the necessary federal requirements. Thus, EPA must review state program submissions to ensure that all the necessary requirements are met. EPA’s review includes an analysis of the state’s statutes and regulations, as well as an in-depth examination of the program description, attorney general’s statement, and MOA. All the information submitted by states is filed in the state program files at EPA headquarters.
Once a state acquires NPDES authorization, EPA must oversee the program to ensure that it meets the requirements set forth in the federal regulations. Consequently, EPA is required to regularly review state-issued permits, state compliance reports, and state inspection forms. Most of these tasks are delegated to the individual EPA regions. Lists of the reporting requirements imposed on states related to the CWA provisions and NPDES and sludge regulations, with statutory and regulatory citations, are provided in Exhibit 1 of this ICR.
The information reported in this ICR is limited to state efforts, including EPA review of state information; it does not reflect the burden on the permittee. For general reports, EPA and states are moving toward greater automation—for example, computer-generated QNCRs. Much of the information is day-to-day, ongoing program information, some of which is case-specific.
EPA has an automated data management system known as PCS and is implementing a modernized system called ICIS. These systems provide the Agency with a nationwide inventory of all permit holders. EPA headquarters uses this information to assess permit compliance.
Small businesses are not affected by this ICR; all respondents are state governments.
The reporting requirements and reporting frequencies are outlined in Exhibit 5.
Exhibit 5. Reporting Frequency
Reporting Requirements |
Citation |
Frequency of Response |
|
State Program Requests |
|
|
|
|
Request for NPDES Program Authorization |
40 CFR Part 123, Subpart B |
One time only |
|
Request for NPDES Partial Program Authorization |
CWA ' 402(n) |
One time only |
|
Request for NPDES Program Modification |
40 CFR 123.62 |
As needed or one time only |
|
Request for Program Transfer/Withdrawal |
40 CFR 123.63, 123.64, 501.34 |
As needed or one time only |
|
Request for Sewage Sludge Program Authorization |
40 CFR Part 501.11 |
One time only |
State Program Implementation |
|
|
|
|
Report on Compliance Evaluation |
40 CFR 123.26(b)(1) |
As needed |
|
Recordkeeping of NPDES Program Information |
40 CFR 123.26(e) |
Ongoing |
|
Recordkeeping for Sludge Program Information |
40 CFR 501.16 |
Ongoing |
|
Inspection and Investigation of NPDES permittees |
40 CFR 123.26(b)(2) & (3) |
Upon inspection completion |
|
Certification of EPA-Issued Permits |
40 CFR 124.53 & 124.54 |
Every 5 years or as permits are reissued |
State Program Oversight |
|
|
|
|
Submittal of NPDES Permit Information |
40 CFR 123.43 & 123.44(j) |
Every 5 years or as permits are issued |
|
Submittal of Sewage Sludge Permit Information |
40 CFR 501.14(b) |
Every 5 years or as permits are issued |
|
NPDES Quarterly, Semiannual, and Annual Reports |
40 CFR 123.45 |
Quarterly, semiannually, and annually |
|
Sewage Sludge Noncompliance Reports |
40 CFR 501.21 |
Annually |
The annual burden for state NPDES and sludge programs is a function of the number of states responding to the collection and the average time required for states to complete each information item. The assumptions and calculations used to derive the burdens for the individual information items are summarized in section 4(b).
Exhibit 6 summarizes the average burden for the information items in this ICR. To determine the average burden hours for the ICR, a cumulative total for each reporting item was calculated. The estimated annual burden is 1,013,802 hours. Approximately 98 percent of this burden (996,528 hours) is associated with the inspecting and investigating NPDES permittees.
As discussed above, the total number of respondents is 618. However, 572 of these 618 states respond to only one information item (certification of EPA-issued permits). The average burden per respondent varies, depending on whether the state has NPDES authority, the number of permitted facilities in the state, and other factors.
Exhibit 6. Annual Respondent Burden and Costs
Reporting Requirement/Citation |
Responses per Year |
Hours per Response |
Total Hours |
Respondent Labor Cost ($ per Hour) |
Total Respondent Cost ($) |
|
State Program Requests |
|
|
|
|
|
|
|
Request for NPDES Program Authorization (40 CFR Part 123, Subpart B) |
0.33 |
2,080 |
686 |
36.96 |
25,369 |
|
Request for NPDES Partial Program Authorization (CWA ' 402(n)) |
0.33 |
2,080 |
686 |
36.96 |
25,369 |
|
Request for NPDES Program Modification (40 CFR 123.62) |
1.33 |
250 |
333 |
36.96 |
12,289 |
|
Request for Program Transfer/Withdrawal (40 CFR 123.63, 123.64, 501.34) |
3 |
480 |
1,440 |
36.96 |
53,222 |
|
Request for Sewage Sludge Program Authorization under 40 CFR Part 501 (40 CFR 501.11) |
3 |
750 |
2,250 |
36.96 |
83,160 |
State Program Implementation |
|
|
|
|
|
|
|
Report on Compliance Evaluation (40 CFR 123.26(b)(1)) |
0 |
0 |
- |
36.96 |
0 |
|
Recordkeeping of NPDES Program Information (40 CFR 123.26(e)) |
46 |
50 |
2,300 |
36.96 |
85,008 |
|
Recordkeeping for Sludge Program Information (40 CFR 501.16) |
13 |
50 |
650 |
36.96 |
24,024 |
|
Inspection and Investigation of NPDES permittees (40 CFR 123.26(b)(2) & (3)) |
18,805 |
variesa |
996,528 |
36.96 |
36,831,675 |
|
Certification of EPA-issued Permits (40 CFR 124.53 & 124.54) |
260 |
4 |
1,040 |
36.96 |
38,438 |
State Program Oversight |
|
|
|
|
|
|
|
Submittal of NPDES Permit Information (40 CFR 123.43 and 123.44(j)) |
46 |
22.7 |
1,044 |
36.96 |
38,594 |
|
Submittal of Sewage Sludge Permit Information (40 CFR 501.14(b)) |
13 |
0.17 |
2 |
36.96 |
82 |
|
NPDES Quarterly, Semiannual, and Annual Reports (40 CFR 123.45) |
230 |
25 |
5,750 |
36.96 |
212,520 |
|
Annual Sewage Sludge Noncompliance Reports (40 CFR 501.21) |
13 |
84 |
1,092 |
36.96 |
40,360 |
Total Burden and Costs |
19,434 |
|
1,013,802 |
|
37,470,111 |
a See section 4(c)(iv), Inspection and Investigation of NPDES Permittees.
The cost imposed on the states as respondents to the information requirement discussed in this ICR is a function of the burden placed on them in collecting, compiling, and reporting the information described above and the wages of the typical state worker performing these activities. No respondent capital/startup costs and no operation and maintenance (O&M) costs are associated with this ICR.
A labor rate of $36.96 an hour was used for all NPDES-authorized state and territory respondent activities defined in this ICR. This rate is based on the mean hourly cost of employment for all occupations, including benefits. This hourly rate was based on the average hourly wage for state and municipal employees as determined by the U.S. Department of Labor. It is based on U.S. Department of Labor, Bureau of Labor Statistics, Employer Costs for Employee Compensation, Table 3, “Employer costs per hour worked for employee compensation and costs as a percent of total compensation: state and local government, by selected characteristics, March 2006.”
As shown in Exhibit 6, the total respondent cost is $37,470,111.
In general, federal government burden and costs arise from reviewing, analyzing, and processing reports and information provided by the states. Section 4(b) of this document details the level of effort expended by the federal government as the recipient and user of this information.
All cost calculations in this ICR account for labor costs only. The hourly labor rate for the federal government is based on an average annual salary for federal employees of $49,632, which is equivalent to the salary of a GS-9, Step 10, federal employee.8 At 2,080 hours per year, the hourly wage is $23.86. Assuming overhead costs of 50 percent, or $11.93 per hour, the fully loaded cost of employment for a federal employee is $35.79. The hourly rate of $35.79 was used for all Agency activities defined in this ICR.
Exhibit 7 summarizes the annual burden and cost to the federal government associated with NPDES and sludge requirements on state programs. The annual government burden equals 24,843 hours, and the average annual cost is $889,120.
Exhibit 7. Annual Federal Burden and Costs
Reporting Requirement/Citation |
Responses per Year |
Hours per Response |
Total Hours |
Federal Hour Labor Cost ($/hr) |
Total Federal Cost ($) |
|
State Program Requests |
|
|
|
|
|
|
|
Request for NPDES Program Authorization (40 CFR Part 123, Subpart B) |
0.33 |
1,248 |
412 |
35.79 |
14,740 |
|
Request for NPDES Partial Program Authorization (CWA ' 402(n)) |
0.33 |
1,248 |
412 |
35.79 |
14,740 |
|
Request for NPDES Program Modification (40 CFR 123.62) |
1.33 |
50 |
67 |
35.79 |
2,380 |
|
Request for Program Transfer/Withdrawal (40 CFR 123.63, 123.64, 501.34) |
3 |
240 |
720 |
35.79 |
25,769 |
|
Request for Sewage Sludge Program Authorization under 40 CFR Part 501 (40 CFR 501.11) |
3 |
400 |
1200 |
35.79 |
42,948 |
State Program Implementation |
|
|
|
|
|
|
|
Report on Compliance Evaluation (40 CFR 123.26(b)(1)) |
0 |
0 |
0 |
35.79 |
0 |
|
Recordkeeping of NPDES Program Information (40 CFR 123.26(e)) |
46 |
0 |
0 |
35.79 |
0 |
|
Recordkeeping for Sewage Program Information (40 CFR 501.16) |
13 |
0 |
0 |
35.79 |
0 |
|
Inspection and Investigation of NPDES permittees (40 CFR 123.26(b)(2) & (3)) |
18,805 |
variesa |
17,868 |
35.79 |
639,478 |
|
Certification of EPA-Issued Permits (40 CFR 124.53 & 124.54) |
260 |
0 |
0 |
35.79 |
0 |
State Program Oversight |
|
|
|
|
|
|
|
Submittal of NPDES Permit Information (40 CFR 123.43 and 123.44(j)) |
46 |
0 |
0 |
35.79 |
0 |
|
Submittal of Sewage Sludge Permit Information (40 CFR 501.14(b)) |
13 |
0 |
0 |
35.79 |
0 |
|
NPDES Quarterly, Semiannual, and Annual Reports (40 CFR 123.45) |
230 |
15 |
3450 |
35.79 |
123,476 |
|
Annual Sludge Noncompliance Reports (40 CFR 501.21) |
13 |
55 |
715 |
35.79 |
25,590 |
Total Burden and Costs |
19,434 |
|
24,843 |
|
889,120 |
a See section 4(c)(iv), Inspection and Investigation of NPDES Permittees.
Exhibit 8 displays the total burden (1,038,644 hours) and cost ($38,359,231) for the respondents and the federal government.
Exhibit 8. Total Annual Burden and Costs
Reporting Requirement/Citation |
Total Respondent Hours |
Total Respondent Cost ($) |
Total Federal Hours |
Total Federal Cost ($) |
Total Burden (Hours) |
Total Cost ($) |
|
State Program Requests |
|
|
|
|
|
|
|
|
Request for NPDES Program Authorization (40 CFR Part 123, Subpart B) |
686 |
25,369 |
412 |
14,740 |
1,098 |
40,109 |
|
Request for NPDES Partial Program Authorization (CWA ' 402(n)) |
686 |
25,369 |
412 |
14,740 |
1,098 |
40,109 |
|
Request for NPDES Program Modification (40 CFR 123.62) |
333 |
12,289 |
67 |
2,380 |
399 |
14,669 |
|
Request for Program Transfer/Withdrawal (40 CFR 123.63, 123.64, 501.34) |
1,440 |
53,222 |
720 |
25,769 |
2,160 |
78,991 |
|
Request for Sewage Sludge Program Authorization under 40 CFR Part 501 (40 CFR 501.11) |
2,250 |
83,160 |
1,200 |
42,948 |
3,450 |
126,108 |
State Program Implementation |
|
|
|
|
|
|
|
|
Report on Compliance Evaluation (40 CFR 123.26(b)(1)) |
- |
- |
- |
- |
- |
- |
|
Recordkeeping of NPDES Program Information (40 CFR 123.26(e)) |
2,300 |
85,008 |
- |
- |
2,300 |
85,008 |
|
Recordkeeping for Sludge Program Information (40 CFR 501.16) |
650 |
24,024 |
- |
- |
650 |
24,024 |
|
Inspection and Investigation of NPDES permittees (40 CFR 123.26(b)(2) & (3)) |
996,528 |
36,831,675 |
17,868 |
639,478 |
1,014,396 |
37,471,153 |
|
Certification of EPA-Issued Permits (40 CFR 124.53 & 124.54) |
1,040 |
38,438 |
- |
- |
1,040 |
38,438 |
State Program Oversight |
|
|
|
|
|
|
|
|
Submittal of NPDES Permit Information (40 CFR 123.43 and 123.44(j)) |
1,044 |
38,594 |
- |
- |
1,044 |
38,594 |
|
Submittal of Sewage Sludge Permit Information (40 CFR 501.14(b)) |
2 |
82 |
- |
- |
2 |
82 |
|
NPDES Quarterly, Semiannual, and Annual Reports (40 CFR 123.45) |
5,750 |
212,520 |
3,450 |
123,476 |
9,200 |
335,996 |
|
Annual Sewage Sludge Noncompliance Reports (40 CFR 501.21) |
1,092 |
40,360 |
715 |
25,590 |
1,807 |
65,950 |
Total Burden and Costs |
1,013,802 |
37,470,111 |
24,843 |
889,120 |
1,038,644 |
38,359,231 |
Exhibit 9 outlines the changes in the respondent burden estimates between the previous NPDES and Sewage Sludge Management State Program Requirements ICR and this revised ICR. The current burden is 966,966 hours. The estimate for this revised ICR is 1,013,802 hours, an increase of 46,836 hours or 4.8 percent over the current inventory. It should be noted that the burden for some of the activities has increased while others have seen their burden decreased; this may be explained by the asymmetrical impact that the changes below may have on each activity:
EPA's continuous effort to improve the quality of data in its PCS database. This change may reflect more accurate data rather than a significant change in the number of permits actually administered. The total number of permits in PCS has decreased, but the number of major facilities has increased.
Changes and adjustments in the number and types of permits administered by the states and EPA under the NPDES program. Non-NPDES authorized states continue to apply for NPDES program and sludge program authorization, impacting recordkeeping and reporting, resulting in a shift of burden from federal to state governments.
The shift toward the use of general permits to cover certain categories of dischargers, reducing the number of standard permits.
Exhibit 9. Changes in Respondent Burden
Regulation/Type of Response |
Previous ICR (hours) |
Revised ICR (hours) |
Change |
% Change |
Change |
|
State Program Requests |
|
|
|
|
|
|
|
Request for NPDES Program Authorization (40 CFR Part 123, Subpart B) |
686 |
686 |
0 |
0% |
No change |
|
Request for NPDES Partial Program Authorization (CWA 402(n)) |
686 |
686 |
0 |
0% |
No change |
|
Request for NPDES Program Modification (40 CFR 123.62) |
333 |
333 |
0 |
0% |
No change |
|
Request for Program Transfer/Withdrawal (40 CFR 123.63, 123.64, 501.34) |
1,440 |
1,440 |
- |
0% |
No change |
|
Request for Sewage Sludge Program Authorization under 40 CFR Part 501 (40 CFR 501.11) |
2,250 |
2,250 |
- |
0% |
No change |
State Program Implementation |
|
|
|
|
|
|
|
Report on Compliance Evaluation (40 CFR 123.26(b)(1)) |
- |
- |
- |
- |
|
|
Recordkeeping of NPDES Program Information (40 CFR 123.26(e)) |
2,250 |
2,300 |
50 |
2% |
Adjustment |
|
Recordkeeping for Sludge Program Information (40 CFR 501.16) |
550 |
650 |
100 |
18% |
Adjustment |
|
Inspection and Investigation of NPDES permittees (40 CFR 123.26(b)(2) & (3)) |
947,897 |
996,528 |
48,631 |
5% |
Adjustment |
|
Certification of EPA-Issued Permits (40 CFR 124.53 & 124.54) |
3,200 |
1,040 |
(2,160) |
-68% |
Adjustmenta |
State Program Oversight |
|
|
|
|
|
|
|
Submittal of NPDES Permit Information (40 CFR 123.43 and 123.44(j)) |
1,125 |
1,044 |
(81) |
-7% |
Adjustment |
|
Submittal of Sewage Sludge Permit Information (40 CFR 501.14(b)) |
- |
2 |
2 |
- |
Correction |
|
NPDES Quarterly, Semiannual, and Annual Reports (40 CFR 123.45) |
5,625 |
5,750 |
125 |
2% |
Adjustment |
|
Annual Sewage Sludge Noncompliance Reports (40 CFR 501.21) |
924 |
1,092 |
168 |
18% |
Adjustment |
Totals |
966,966 |
1,013,802 |
46,836 |
4.8% |
|
a This change may be the result of more accurate data rather than a significant change in the number of permits actually administered by EPA and certified by the states.
Exhibit 10 outlines the changes in the total burden estimates between the previous NPDES and Sewage Sludge Management State Program Requirements ICR and this revised ICR. The total estimate for this ICR is 1,038,644 hours, an increase of 43,862 hours or 4.4 percent over the current inventory. Reasons for the changes are discussed above.
Exhibit 10. Changes in Total Burden
Regulation/Type of Response |
Previous ICR (hours) |
Revised ICR (hours) |
Change |
% Change |
Change |
|
State Program Requests |
|
|
|
|
|
|
|
Request for NPDES Program Authorization (40 CFR Part 123, Subpart B) |
1,098 |
1,098 |
0 |
0% |
No Change |
|
Request for NPDES Partial Program Authorization (CWA 402(n)) |
1,098 |
1,098 |
0 |
0% |
No Change |
|
Request for NPDES Program Modification (40 CFR 123.62) |
400 |
399 |
(1) |
0% |
Correction |
|
Request for Program Transfer/Withdrawal (40 CFR 123.63, 123.64, 501.34) |
2,160 |
2,160 |
- |
0% |
No Change |
|
Request for Sewage Sludge Program Authorization under 40 CFR Part 501 (40 CFR 501.11) |
3,450 |
3,450 |
- |
0% |
No Change |
State Program Implementation |
|
|
|
|
|
|
|
Report on Compliance Evaluation (40 CFR 123.26(b)(1)) |
- |
- |
- |
- |
|
|
Recordkeeping of NPDES Program Information (40 CFR 123.26(e)) |
2,250 |
2,300 |
50 |
2% |
Adjustment |
|
Recordkeeping for Sludge Program Information (40 CFR 501.16) |
550 |
650 |
100 |
18% |
Adjustment |
|
Inspection and investigation of NPDES Permittees (40 CFR 123.26(b)(2) & (3)) |
968,919 |
1,014,396 |
45,477 |
5% |
Adjustment |
|
Certification of EPA-Issued Permits (40 CFR 124.53 & 124.54) |
3,200 |
1,040 |
(2,160) |
-68% |
Adjustmenta |
State Program Oversight |
|
|
|
|
|
|
|
Submittal of NPDES Permit Information (40 CFR 123.43 and 123.44(j)) |
1,125 |
1,044 |
(81) |
-7% |
Adjustment |
|
Submittal of Sewage Sludge Permit Information (40 CFR 501.14(b)) |
- |
2 |
2 |
- |
Correction |
|
NPDES Quarterly, Semiannual, and Annual Reports (40 CFR 123.45) |
9,000 |
9,200 |
200 |
2% |
Adjustment |
|
Annual Sewage Sludge Noncompliance Reports (40 CFR ' 501.21) |
1,529 |
1,807 |
278 |
18% |
Adjustment |
Totals |
994,779 |
1,038,644 |
43,865 |
4.4% |
|
a This change may be the result of more accurate data rather than a significant change in the number of permits actually administered by EPA and certified by the states.
The public reporting and burden for collecting information is estimated to average 1,013,802 hours annually. This estimate includes the time required to review the instructions, search existing data sources, gather and maintain all necessary data, and complete and review the information collected. The respondents are the 618 states, tribes, U.S. territories, and the District of Columbia defined under the NPDES program; the burden per respondent is variable.
Burden means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purpose of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control numbers for EPA’s regulations are listed in 40 CFR Part 9 and 48 CFR Chapter 15.
To comment on EPA’s need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, the Agency has established a public docket for this ICR under Docket ID No. EPA-HQ-OW-2006-0139, which is available for public viewing at the Water Docket in the EPA Docket Center (EPA/DC), EPA West, Room 3334, 1301 Constitution Ave., NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is 202-566-1744, and the telephone number for the Water Docket is 202-566-2426. An electronic version of the public docket is available through the Federal Docket Management System (FDMS) at http://www.regulations.gov/. Use FDMS to submit or view public comments, to access the index listing of the contents of the public docket, and to access documents in the public docket that are available electronically. Once in the system, key in the docket ID number identified above. You can also send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Office for EPA. Please include the EPA Docket ID No. EPA-HQ-OW-2006-0139 and OMB control number 2040-0057 in any correspondence.
This table lists Federally Recognized American Indian Tribes in the contiguous 48 states and in Alaska at the end of fiscal year 2005. The listed entities are acknowledged to have the immunities and privileges available to federally acknowledged Indian tribes by virtue of their government‑to‑government relationship with the United States, as well as the responsibilities, powers, limitations, and obligations of such tribes. (Source: Bureau of Indian Affairs, 2005 BIA Performance and Accountability Report, http://www.doi.gov/bia/BIA_PAR_2005_FINAL_02242006_web.pdf)
Contiguous 48 States |
|
Absentee-Shawnee Tribe of Indians of Oklahoma |
Agua Caliente Band of Cahuilla Indians of the Agua Caliente Indian Reservation, California |
Ak Chin Indian Community of the Maricopa (Ak Chin) Indian Reservation, Arizona |
Alabama-Coushatta Tribes of Texas |
Alabama-Quassarte Tribal Town, Oklahoma |
Alturas Indian Rancheria, California |
Apache Tribe of Oklahoma |
Arapahoe Tribe of the Wind River Reservation, Wyoming |
Aroostook Band of Micmac Indians of Maine |
Assiniboine and Sioux Tribes of the Fort Peck Indian Reservation, Montana |
Augustine Band of Cahuilla Mission Indians of the Augustine Reservation, California |
|
River Band of the Lake Superior Tribe of Chippewa Indians of the Bad River Reservation, Wisconsin |
Bay Mills Indian Community of the Sault Ste. Marie Band of Chippewa Indians, Bay Mills Reservation, Michigan |
Bear River Band of the Rohnerville Rancheria, California |
Berry Creek Rancheria of Maidu Indians of California |
Big Lagoon Rancheria, California |
Big Pine Band of Owens Valley Paiute Shoshone Indians of the Big Pine Reservation, California |
Big Sandy Rancheria of Mono Indians of California |
Big Valley Band of Pomo Indians of the Big Valley Rancheria, California |
Blackfeet Tribe of the Blackfeet Indian Reservation of Montana |
Blue Lake Rancheria, California |
Bridgeport Paiute Indian Colony of California |
Buena Vista Rancheria of Me-Wuk Indians of California |
Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon |
|
Cabazon Band of Cahuilla Mission Indians of the Cabazon Reservation, California |
Cachil DeHe Band of Wintun Indians of the Colusa Indian Community of the Colusa Rancheria, California |
Caddo Indian Tribe of Oklahoma |
Cahuilla Band of Mission Indians of the Cahuilla Reservation, California |
Cahto Indian Tribe of the Laytonville Rancheria, California |
Campo Band of Diegueno Mission Indians of the Campo Indian Reservation, California |
Capitan Grande Band of Diegueno Mission Indians of California |
Barona Group of Capitan Grande Band of Mission Indians of the Barona Reservation, California |
Viejas (Baron Long) Group of Capitan Grande Band of Mission Indians of the Viejas Reservation, California |
Catawba Indian Nation (aka Catawba Tribe of South Carolina) |
Cayuga Nation of New York |
Cedarville Rancheria, California |
Chemehuevi Indian Tribe of the Chemehuevi Reservation, California |
Cher-Ae Heights Indian Community of the Trinidad Rancheria, California |
Cherokee Nation of Oklahoma |
Cheyenne-Arapaho Tribes of Oklahoma |
Cheyenne River Sioux Tribe of the Cheyenne River Reservation, South Dakota |
Chickasaw Nation, Oklahoma |
Chicken Ranch Rancheria of Me-Wuk Indians of California |
Chippewa-Cree Indians of the Rocky Boy’s Reservation, Montana |
Chitimacha Tribe of Louisiana |
Choctaw Nation of Oklahoma |
Citizen Potawatomi Nation, Oklahoma |
Cloverdale Rancheria of Pomo Indians of California |
Cocopah Tribe of Arizona |
Coeur D’Alene Tribe of the Coeur D’Alene Reservation, Idaho |
Cold Springs Rancheria of Mono Indians of California |
Colorado River Indian Tribes of the Colorado River Indian Reservation, Arizona and California |
Comanche Indian Tribe, Oklahoma |
Confederated Salish & Kootenai Tribes of the Flathead Reservation, Montana |
Confederated Tribes of the Chehalis Reservation, Washington |
Confederated Tribes of the Colville Reservation, Washington |
Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon |
Confederated Tribes of the Goshute Reservation, Nevada and Utah |
Confederated Tribes of the Grand Ronde Community of Oregon |
Confederated Tribes of the Siletz Reservation, Oregon |
Confederated Tribes of the Umatilla Reservation, Oregon |
Confederated Tribes of the Warm Springs Reservation of Oregon |
Confederated Tribes and Bands of the Yakama Indian Nation of the Yakama Reservation, Washington |
Coquille Tribe of Oregon |
Cortina Indian Rancheria of Wintun Indians of California |
Coushatta Tribe of Louisiana |
Cow Creek Band of Umpqua Indians of Oregon |
Coyote Valley Band of Pomo Indians of California |
Crow Tribe of Montana |
Crow Creek Sioux Tribe of the Crow Creek Reservation, South Dakota |
Cuyapaipe Community of Diegueno Mission Indians of the Cuyapaipe Reservation, California |
|
Death Valley Timbi-Sha Shoshone Band of California |
Delaware Tribe of Western Oklahoma |
Dry Creek Rancheria of Pomo Indians of California |
Duckwater Shoshone Tribe of the Duckwater Reservation, Nevada |
|
Estern Band of Cherokee Indians of North Carolina |
Eastern Shawnee Tribe of Oklahoma |
Elem Indian Colony of Pomo Indians of the Sulphur Bank Rancheria, California |
Elk Valley Rancheria, California |
Ely Shoshone Tribe of Nevada |
Enterprise Rancheria of Maidu Indians of California |
|
Flandreau Santee Sioux Tribe of South Dakota |
Forest County Potawatomi Community of Wisconsin Potawatomi Indians, Wisconsin |
Fort Belknap Indian Community of the Fort Belknap Reservation of Montana |
Fort Bidwell Indian Community of the Fort Bidwell Reservation of California |
Fort Independence Indian Community of Paiute Indians of the Fort Independence Reservation, California |
Fort McDermitt Paiute and Shoshone Tribes of the Fort McDermitt Indian Reservation, Nevada and Oregon |
Fort McDowell Mohave-Apache Community of the Fort McDowell Indian Reservation, Arizona |
Fort Mojave Indian Tribe of Arizona, California & Nevada |
Fort Sill Apache Tribe of Oklahoma |
|
Gila River Indian Community of the Gila River Indian Reservation, Arizona |
Grand Traverse Band of Ottawa & Chippewa Indians of Michigan |
Greenville Rancheria of Maidu Indians of California |
Grindstone Indian Rancheria of Wintun-Wailaki Indians of California |
Guidiville Rancheria of California |
Graton Rancheria |
|
Hannahville Indian Community of Wisconsin |
Havasupai Tribe of the Havasupai Reservation, Arizona |
Ho-Chunk Nation of Wisconsin (formerly known as the Wisconsin Winnebago Tribe) |
Hoh Indian Tribe of the Hoh Indian Reservation, Washington |
Hoopa Valley Tribe, California |
Hopi Tribe of Arizona |
Hopland Band of Pomo Indians of the Hopland Rancheria, California |
Houlton Band of Maliseet Indians of Maine |
Hualapai Indian Tribe of the Hualapai Indian Reservation, Arizona |
Huron Potawatomi, Inc., Michigan |
|
Inaja Band of Diegueno Mission Indians of the Inaja and Cosmit Reservation, California |
Ione Band of Miwok Indians of California |
Iowa Tribe of Kansas and Nebraska |
Iowa Tribe of Oklahoma |
|
Jackson Rancheria of Me-Wuk Indians of California |
Jamestown S’Klallam Tribe of Washington |
Jamul Indian Village of California |
Jena Band of Choctaw Indians, Louisiana |
Jicarilla Apache Tribe of the Jicarilla Apache Indian Reservation, New Mexico |
|
Kaibab Band of Paiute Indians of the Kaibab Indian Reservation, Arizona |
Kalispel Indian Community of the Kalispel Reservation, Washington |
Karuk Tribe of California |
Kashia Band of Pomo Indians of the Stewarts Point Rancheria, California |
Kaw Nation, Oklahoma |
Keweenaw Bay Indian Community of L’Anse and Ontonagon Bands of Chippewa Indians of the L’Anse Reservation, Michigan |
Kialegee Tribal Town, Oklahoma |
Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas |
Kickapoo Tribe of Oklahoma |
Kickapoo Traditional Tribe of Texas |
Kiowa Indian Tribe of Oklahoma |
Klamath Indian Tribe of Oregon |
Kootenai Tribe of Idaho |
|
LA Jolla Band of Luiseno Mission Indians of the La Jolla Reservation, California |
La Posta Band of Diegueno Mission Indians of the La Posta Indian Reservation, California |
Lac Courte Oreilles Band of Lake Superior Chippewa Indians of the Lac Courte Oreilles Reservation of Wisconsin |
Lac du Flambeau Band of Lake Superior Chippewa Indians of the Lac du Flambeau Reservation of Wisconsin |
Lac Vieux Desert Band of Lake Superior Chippewa Indians of Michigan |
Las Vegas Tribe of Paiute Indians of the Las Vegas Indian Colony, Nevada |
Little River Band of Ottawa Indians of Michigan |
Little Traverse Bay Bands of Odawa Indians of Michigan |
Los Coyotes Band of Cahuilla Mission Indians of the Los Coyotes Reservation, California |
Lovelock Paiute Tribe of the Lovelock Indian Colony, Nevada |
Lower Brule Sioux Tribe of the Lower Brule Reservation, South Dakota |
Lower Elwha Tribal Community of the Lower Elwha Reservation, Washington |
Lower Lake, California |
Lower Sioux Indian Community of Minnesota Mdewakanton Sioux Indians of the Lower Sioux Reservation in Minnesota |
Lummi Tribe of the Lummi Reservation, Washington |
Lytton Rancheria of California |
|
Makah Indian Tribe of the Makah Indian Reservation, Washington |
Manchester Band of Pomo Indians of the Manchester-Point Arena Rancheria, California |
Manzanita Band of Diegueno Mission Indians of the Manzanita Reservation, California |
Mashantucket Pequot Tribe of Connecticut |
Match-E-Be-Nash-She-Wish Band of Pottawatomi Indians of Michigan (Gun Lake Band) |
Mechoopda Indian Tribe of Chico Rancheria, California |
Menominee Indian Tribe of Wisconsin |
Mesa Grande Band of Diegueno Mission Indians of the Mesa Grande Reservation, California |
Mescalero Apache Tribe of the Mescalero Reservation, New Mexico |
Miami Tribe of Oklahoma |
Miccosukee Tribe of Indians of Florida |
Middletown Rancheria of Pomo Indians of California |
Minnesota Chippewa Tribe, Minnesota (Six component reservations): Bois Forte Band (Nett Lake); Fond du Lac Band; Grand Portage Band; Leech Lake Band; Mille Lacs Band; White Earth Band |
Mississippi Band of Choctaw Indians, Mississippi |
Moapa Band of Paiute Indians of the Moapa River Indian Reservation, Nevada |
Modoc Tribe of Oklahoma |
Mohegan Indian Tribe of Connecticut |
Mooretown Rancheria of Maidu Indians of California |
Morongo Band of Cahuilla Mission Indians of the Morongo Reservation, California |
Muckleshoot Indian Tribe of the Muckleshoot Reservation, Washington |
Muscogee (Creek) Nation, Oklahoma |
|
Narragansett Indian Tribe of Rhode Island |
Navajo Nation of Arizona, New Mexico & UTA |
Nez Perce Tribe of Idaho |
Nisqually Indian Tribe of the Nisqually Reservation, Washington |
Nooksack Indian Tribe of Washington |
Northern Cheyenne Tribe of the Northern Cheyenne Indian Reservation, Montana |
Northfork Rancheria of Mono Indians of California |
Northwestern Band of Shoshoni Nation of Utah (Washakie) |
|
Oglala Sioux Tribe of the Pine Ridge Reservation, South Dakota |
Omaha Tribe of Nebraska |
Oneida Nation of New York |
Oneida Tribe of Wisconsin |
Onondaga Nation of New York |
Osage Tribe, Oklahoma |
Ottawa Tribe of Oklahoma |
Otoe-Missouria Tribe of Indians, Oklahoma |
|
Paiute Indian Tribe of Utah |
Paiute-Shoshone Indians of the Bishop Community of the Bishop Colony, California |
Paiute-Shoshone Tribe of the Fallon Reservation and Colony, Nevada |
Paiute-Shoshone Indians of the Lone Pine Community of the Lone Pine Reservation, California |
Pala Band of Luiseno Mission Indians of the Pala Reservation, California |
Pascua Yaqui Tribe of Arizona |
Paskenta Band of Nomlaki Indians of California |
Passamaquoddy Tribe of Maine |
Pauma Band of Luiseno Mission Indians of the Pauma & Yuima Reservation, California |
Pawnee Nation of Oklahoma |
Pechanga Band of Luiseno Mission Indians of the Pechanga Reservation, California |
Penobscot Tribe of Maine |
Peoria Tribe of Indians of Oklahoma |
Picayune Rancheria of Chukchansi Indians of California |
Pinoleville Rancheria of Pomo Indians of California |
Pit River Tribe, California (includes Big Bend, Lookout, Montgomery Creek & Roaring Creek Rancherias & XL Ranch) |
Poarch Band of Creek Indians of Alabama |
Pokagon Band of Potawatomi Indians of Michigan |
Ponca Tribe of Indians of Oklahoma |
Ponca Tribe of Nebraska |
Port Gamble Indian Community of the Port Gamble Reservation, Washington |
Potawatomie Indians of Michigan |
Potter Valley Rancheria of Pomo Indians of California |
Prairie Band of Potawatomi Indians, Kansas |
Prairie Island Indian Community of Minnesota Mdewakanton Sioux Indians of the Prairie Island Reservation, Minnesota |
Pueblo of Acoma, New Mexico |
Pueblo of Cochiti, New Mexico |
Pueblo of Jemez, New Mexico |
Pueblo of Isleta, New Mexico |
Pueblo of Laguna, New Mexico |
Pueblo of Nambe, New Mexico |
Pueblo of Picuris, New Mexico |
Pueblo of Pojoaque, New Mexico |
Pueblo of San Felipe, New Mexico |
Pueblo of San Juan, New Mexico |
Pueblo of San Ildefonso, New Mexico |
Pueblo of Sandia, New Mexico |
Pueblo of Santa Ana, New Mexico |
Pueblo of Santa Clara, New Mexico |
Pueblo of Santo Domingo, New Mexico |
Pueblo of Taos, New Mexico |
Pueblo of Tesuque, New Mexico |
Pueblo of Zia, New Mexico |
Puyallup Tribe of the Puyallup Reservation, Washington |
Pyramid Lake Paiute Tribe of the Pyramid Lake Reservation, Nevada |
|
Quapaw Tribe of Indians, Oklahoma |
Quartz Valley Indian Community of the Quartz Valley Reservation of California |
Quechan Tribe of the Fort Yuma Indian Reservation, California & Arizona |
Quileute Tribe of the Quileute Reservation, Washington |
Quinault Tribe of the Quinault Reservation, Washington |
|
Ramona Band or Village of Cahuilla Mission Indians of California |
Red Cliff Band of Lake Superior Chippewa Indians of Wisconsin |
Red Lake Band of Chippewa Indians of the Red Lake Reservation, Minnesota |
Redding Rancheria, California |
Redwood Valley Rancheria of Pomo Indians of California |
Reno-Sparks Indian Colony, Nevada |
Resighini Rancheria, California (formerly known as the Coast Indian Community of Yurok Indians of the Resighini Rancheria) |
Rincon Band of Luiseno Mission Indians of the Rincon Reservation, California |
Robinson Rancheria of Pomo Indians of California |
Rosebud Sioux Tribe of the Rosebud Indian Reservation, South Dakota |
Round Valley Indian Tribes of the Round Valley Reservation, California (formerly known as the Covelo Indian Community) |
Rumsey Indian Rancheria of Wintun Indians of California |
|
Sac & Fox Tribe of the Mississippi in Iowa |
Sac & Fox Nation of Missouri in Kansas and Nebraska |
Sac & Fox Nation, Oklahoma |
Saginaw Chippewa Indian Tribe of Michigan, Isabella Reservation |
Salt River Pima-Maricopa Indian Community of the Salt River Reservation, Arizona |
Samish Indian Tribe, Washington |
San Carlos Apache Tribe of the San Carlos Reservation, Arizona |
San Juan Southern Paiute Tribe of Arizona |
San Manual Band of Serrano Mission Indians of the San Manual Reservation, California |
San Pasqual Band of Diegueno Mission Indians of California |
Santa Rosa Indian Community of the Santa Rosa Rancheria, California |
Santa Rosa Band of Cahuilla Mission Indians of the Santa Rosa Reservation, California |
Santa Ynez Band of Chumash Mission Indians of the Santa Ynez Reservation, California |
Santa Ysabel Band of Diegueno Mission Indians of the Santa Ysabel Reservation, California |
Santee Sioux Tribe of the Santee Reservation of Nebraska |
Sauk-Suiattle Indian Tribe of Washington |
Sault Ste. Marie Tribe of Chippewa Indians of Michigan |
Scotts Valley Band of Pomo Indians of California |
Seminole Nation of Oklahoma |
Seminole Tribe of Florida, Dania, Big Cypress, Brighton, Hollywood & Tampa Reservations |
Seneca Nation of New York |
Seneca-Cayuga Tribe of Oklahoma |
Shakopee Mdewakanton Sioux Community of Minnesota (Prior Lake) |
Shawnee Tribe of Oklahoma |
Sheep Ranch Rancheria of Me-Wuk Indians of California |
Sherwood Valley Rancheria of Pomo Indians of California |
Shingle Springs Band of Miwok Indians, Shingle Springs Rancheria (Verona Tract), California |
Shoalwater Bay Tribe of the Shoalwater Bay Indian Reservation, Washington |
Shoshone Tribe of the Wind River Reservation, Wyoming |
Shoshone-Bannock Tribes of the Fort Hall Reservation of Idaho |
Shoshone-Paiute Tribes of the Duck Valley Reservation, Nevada |
Sisseton-Wahpeton Sioux Tribe of the Lake Traverse Reservation, South Dakota |
Skokomish Indian Tribe of the Skokomish Reservation, Washington |
Skull Valley Band of Goshute Indians of Utah |
Smith River Rancheria, California |
Snoqualmie Tribe, Washington |
Soboba Band of Luiseno Mission Indians of the Soboba Reservation, California |
Sokaogon Chippewa Community of the Mole Lake Band of Chippewa Indians, Wisconsin |
Southern Ute Indian Tribe of the Southern Ute Reservation, Colorado |
Spirit Lake Tribe, North Dakota (formerly known as the Devils Lake Sioux Tribe) |
Spokane Tribe of the Spokane Reservation, Washington |
Squaxin Island Tribe of the Squaxin Island Reservation, Washington |
St. Croix Chippewa Indians of Wisconsin, St. Croix Reservation |
St. Regis Band of Mohawk Indians of New York |
Standing Rock Sioux Tribe of North & South Dakota |
Stockbridge-Munsee Community of Mohican Indians of Wisconsin |
Stillaguamish Tribe of Washington |
Summit Lake Paiute Tribe of Nevada |
Suquamish Indian Tribe of the Port Madison Reservation, Washington |
Susanville Indian Rancheria, California |
Swinomish Indians of the Swinomish Reservation, Washington |
Sycuan Band of Diegueno Mission Indians of California |
|
Table Bluff Reservation - Wiyot Tribe, California |
Table Mountain Rancheria of California |
Te-Moak Tribes of Western Shoshone Indians of Nevada (Four constituent bands: Battle Mountain Band; South Fork Band and Wells Band) |
Thlopthlocco Tribal Town, Oklahoma |
Three Affiliated Tribes of the Fort Berthold Reservation, North Dakota |
Tohono O’odham Nation of Arizona |
Tonawanda Band of Seneca Indians of New York |
Tonkawa Tribe of Indians of Oklahoma |
Tonto Apache Tribe of Arizona |
Torres-Martinez Band of Cahuilla Mission Indians of California |
Tule River Indian Tribe of the Tule River Reservation, California |
Tulalip Tribes of the Tulalip Reservation, Washington |
Tunica-Biloxi Indian Tribe of Louisiana |
Tuolumne Band of Me-Wuk Indians of the Tuolumne Rancheria of California |
Turtle Mountain Band of Chippewa Indians of North Dakota |
Tuscarora Nation of New York |
Twenty-Nine Palms Band of Luiseno Mission Indians of California |
|
United Auburn Indian Community of the Auburn Rancheria of California |
United Keetoowah Band of Cherokee Indians of Oklahoma |
Upper Lake Band of Pomo Indians of Upper Lake Rancheria of California |
Upper Sioux Indian Community of the Upper Sioux Reservation, Minnesota |
Upper Skagit Indian Tribe of Washington |
Ute Indian Tribe of the Uintah & Ouray Reservation, Utah |
Ute Mountain Tribe of the Ute Mountain Reservation, Colorado, New Mexico & Utah |
Utu Utu Gwaitu Paiute Tribe of the Benton Paiute Reservation, California |
|
Walker River Paiute Tribe of the Walker River Reservation, Nevada |
Wampanoag Tribe of Gay Head (Aquinnah) of Massachusetts |
Washoe Tribe of Nevada & California (Carson Colony, Dresslerville Colony, Woodfords Community, Stewart Community, & Washoe Ranches) |
White Mountain Apache Tribe of the Fort Apache Reservation, Arizona |
Wichita and Affiliated Tribes (Wichita, Keechi, Waco & Tawakonie), Oklahoma |
Winnebago Tribe of Nebraska |
Winnemucca Indian Colony of Nevada |
Wyandotte Tribe of Oklahoma |
|
Yankton Sioux Tribe of South Dakota |
Yavapai-Apache Nation of the Camp Verde Indian Reservation, Arizona |
Yavapai-Prescott Tribe of the Yavapai Reservation, Arizona |
Yerington Paiute Tribe of the Yerington Colony & Campbell Ranch, Nevada |
Yomba Shoshone Tribe of the Yomba Reservation, Nevada |
Ysleta Del Sur Pueblo of Texas |
Yurok Tribe of the Yurok Reservation, California |
|
Zuni Tribe of the Zuni Reservation, New Mexico |
|
Alaska |
Village of Afognak |
Native Village of Akhiok |
Akiachak Native Community |
Akiak Native Community |
Native Village of Akutan |
Village of Alakanuk |
Alatna Village |
Native Village of Aleknagik |
Algaaciq Native Village (St. Mary’s) |
Allakaket Village |
Native Village of Ambler |
Village of Anaktuvuk Pass |
Yupiit of Andreafski |
Angoon Community Association |
Village of Aniak |
Anvik Village |
Arctic Village (See Native Village of Venetie Tribal Government) |
Native Village of Atka |
Asa’carsarmiut Tribe (formerly Native Village of Mountain Village) |
Atqasuk Village (Atkasook) |
Village of Atmautluak |
Native Village of Barrow Inupiat Traditional Government (formerly Native Village of Barrow) |
Beaver Village |
Native Village of Belkofski |
Village of Bill Moore’s Slough |
Birch Creek Village |
Native Village of Brevig Mission |
Native Village of Buckland |
Native Village of Cantwell |
Native Village of Chanega (aka Chenega) |
Chalkyitsik Village |
Village of Chefornak |
Chevak Native Village |
Chickaloon Native Village |
Native Village of Chignik |
Native Village of Chignik Lagoon |
Chignik Lake Village |
Chilkat Indian Village (Kluckwan) |
Chilkoot Indian Association (Haines) |
Chinik Eskimo Community (Golovin) |
Native Village of Chistochina |
Native Village of Chitina |
Native Village of Chuathbaluk (Russian Mission, Kuskokwim) |
Chuloonawick Native Village |
Circle Native Community |
Village of Clark’s Point |
Native Village of Council |
Craig Community Association |
Village of Crooked Creek |
Curyung Tribal Council (formerly Native Village of Dillingham) |
Native Village of Deering |
Native Village of Diomede (aka Inalik) |
Village of Dot Lake |
Douglas Indian Association |
Native Village of Eagle |
Native Village of Eek |
Egegik Village |
Eklutna Native Village |
Native Village of Ekuk |
Ekwok Village |
Native Village of Elim |
Emmonak Village |
Evansville Village (aka Bettles Field) |
Native Village of Eyak (Cordova) |
Native Village of False Pass |
Native Village of Fort Yukon |
Native Village of Gakona |
Galena Village (aka Louden Village) |
Native Village of Gambell |
Native Village of Georgetown |
Native Village of Goodnews Bay |
Organized Village of Grayling (aka Holikachuk) |
Gulkana Village |
Native Village of Hamilton |
Healy Lake Village |
Holy Cross Village |
Hoonah Indian Association |
Native Village of Hooper Bay |
Hughes Village |
Huslia Village |
Hydaburg Cooperative Association |
Igiugig Village |
Village of Iliamna |
Inupiat Community of the Arctic Slope |
Iqurmuit Traditional Council (formerly Native Village of Russian Mission) |
Ivanoff Bay Village |
Kaguyak Village |
Organized Village of Kake |
Kaktovik Village (aka Barter Island) |
Village of Kalskag |
Village of Kaltag |
Native Village of Kanatak |
Native Village of Karluk |
Organized Village of Kasaan |
Native Village of Kasigluk |
Kenaitze Indian Tribe |
Ketchikan Indian Corporation |
Native Village of Kiana |
Agdaagux Tribe of King Cove |
King Island Native Community |
King Salmon Tribe |
Native Village of Kipnuk |
Native Village of Kivalina |
Klawock Cooperative Association |
Native Village of Kluti Kaah (aka Copper Center) |
Knik Tribe |
Native Village of Kobuk |
Kokhanok Village |
New Koliganek Village Council (formerly Koliganek Village) |
Native Village of Kongiganak |
Village of Kotlik |
Native Village of Kotzebue |
Native Village of Koyuk |
Koyukuk Native Village |
Organized Village of Kwethluk |
Native Village of Kwigillingok |
Native Village of Kwinhagak (aka Quinhagak) |
Native Village of Larsen Bay |
Levelock Village |
Lesnoi Village (aka Woody Island) |
Lime Village |
Village of Lower Kalskag |
Manley Hot Springs Village |
Manokotak Village |
Native Village of Marshall (aka Fortuna Ledge) |
Native Village of Mary’s Igloo |
McGrath Native Village |
Native Village of Mekoryuk |
Mentasta Traditional Council (formerly Mentasta Lake Village) |
Metlakatla Indian Community, Annette Island Reserve |
Native Village of Minto |
Naknek Native Village |
Native Village of Nanwalek (aka English Bay) |
Native Village of Napaimute |
Native Village of Napakiak |
Native Village of Napaskiak |
Native Village of Nelson Lagoon |
Nenana Native Association |
New Stuyahok Village |
Newhalen Village |
Newtok Village |
Native Village of Nightmute |
Nikolai Village |
Native Village of Nikolski |
Ninilchik Village |
Native Village of Noatak |
Nome Eskimo Community |
Nondalton Village |
Noorvik Native Community |
Northway Village |
Native Village of Nuiqsut (aka Nooiksut) |
Nulato Village |
Nunakauyarmiut Tribe (formerly the Native Village of Toksook Bay) |
Native Village of Nunapitchuk |
Village of Ohogamiut |
Village of Old Harbor |
Orutsararmuit Native Village (aka Bethel) |
Oscarville Traditional Village |
Native Village of Ouzinkie |
Native Village of Paimiut |
Pauloff Harbor Village |
Pedro Bay Village |
Native Village of Perryville |
Petersburg Indian Association |
Native Village of Pilot Point |
Pilot Station Traditional Village |
Native Village of Pitka’s Point |
Platinum Traditional Village |
Native Village of Point Hope |
Native Village of Point Lay |
Native Village of Port Graham |
Native Village of Port Heiden |
Native Village of Port Lions |
Portage Creek Village (aka Ohgsenakale) |
Pribilof Islands Aleut Communities of St. Paul & St. George Islands |
Qagan Toyagungin Tribe of Sand Point Village |
Rampart Village |
Village of Red Devil |
Native Village of Ruby |
Village of Salamatoff |
Organized Village of Saxman |
Native Village of Savoonga |
Saint George (See Pribilof Islands Aleut Communities of St. Paul & St. George Islands) |
Native Village of Saint Michael |
Saint Paul (See Pribilof Islands Aleut Communities of St. Paul & St. George Islands) |
Native Village of Scammon Bay |
Native Village of Selawik |
Seldovia Village Tribe |
Shageluk Native Village |
Native Village of Shaktoolik |
Native Village of Sheldon’s Point |
Native Village of Shishmaref |
Shoonaq Tribe of Kodiak |
Native Village of Shungnak |
Sitka Tribe of Alaska |
Skagway Village |
Village of Sleetmute |
Village of Solomon |
South Naknek Village |
Stebbins Community Association |
Native Village of Stevens |
Village of Stony River |
Takotna Village |
Native Village of Tanacross |
Native Village of Tanana |
Native Village of Tatitlek |
Native Village of Tazlina |
Telida Village |
Native Village of Teller |
Native Village of Tetlin |
Central Council of the Tlingit & Haida Indian Tribes |
Traditional Village of Togiak |
Tuluksak Native Community |
Native Village of Tuntutuliak |
Native Village of Tununak |
Twin Hills Village |
Native Village of Tyonek |
Ugashik Village |
Umkumiute Native Village |
Native Village of Unalakleet |
Qawalangin Tribe of Unalaska |
Native Village of Unga |
Village of Venetie (See Native Village of Venetie Tribal Government) |
Native Village of Venetie Tribal Government (Arctic Village and Village of Venetie) |
Village of Wainwright |
Native Village of Wales |
Native Village of White Mountain |
Wrangell Cooperative Association |
Yakutat Tlingit Tribe |
State |
Approved State NPDES Permit Program |
Approved to Regulate Federal Facilities |
Approved State Pretreatment Program |
Approved General Permits Program |
Approved Biosolids (Sludge) Program |
Alabama |
|
|
|
|
|
Alaska |
|
|
|
|
|
American Samoa |
|
|
|
|
|
Arizona |
|
|
|
|
|
Arkansas |
|
|
|
|
|
California |
|
|
|
|
|
Colorado |
|
|
|
|
|
Connecticut |
|
|
|
|
|
Delaware |
|
|
|
|
|
District of Columbia |
|
|
|
|
|
Florida |
|
|
|
|
|
Georgia |
|
|
|
|
|
Guam |
|
|
|
|
|
Hawaii |
|
|
|
|
|
Idaho |
|
|
|
|
|
Illinois |
|
|
|
|
|
Indiana |
|
|
|
|
|
Iowa |
|
|
|
|
|
Johnston Atoll |
|
|
|
|
|
Kansas |
|
|
|
|
|
Kentucky |
|
|
|
|
|
Louisiana |
|
|
|
|
|
Maine |
|
|
|
|
|
Maryland |
|
|
|
|
|
Massachusetts |
|
|
|
|
|
Michigan |
|
|
|
|
|
Midway Island |
|
|
|
|
|
Minnesota |
|
|
|
|
|
Mississippi |
|
|
|
|
|
Missouri |
|
|
|
|
|
Montana |
|
|
|
|
|
Nebraska |
|
|
|
|
|
Nevada |
|
|
|
|
|
New Hampshire |
|
|
|
|
|
New Jersey |
|
|
|
|
|
New Mexico |
|
|
|
|
|
New York |
|
|
|
|
|
North Carolina |
|
|
|
|
|
North Dakota |
|
|
|
|
|
Northern Mariana Islands |
|
|
|
|
|
Ohio |
|
|
|
|
|
Oklahoma |
|
|
|
|
|
Oregon |
|
|
|
|
|
Pennsylvania |
|
|
|
|
|
Puerto Rico |
|
|
|
|
|
Rhode Island |
|
|
|
|
|
South Carolina |
|
|
|
|
|
South Dakota |
|
|
|
|
|
Tennessee |
|
|
|
|
|
Texas |
|
|
|
|
|
Trust Territories |
|
|
|
|
|
Utah |
|
|
|
|
|
Vermont |
|
|
|
|
|
Virgin Islands |
|
|
|
|
|
Virginia |
|
|
|
|
|
Wake Island |
|
|
|
|
|
Washington |
|
|
|
|
|
West Virginia |
|
|
|
|
|
Wisconsin |
|
|
|
|
|
Wyoming |
|
|
|
|
|
Source:
http://cfpub.epa.gov/npdes/statestats.cfm?program_id=45&view=specific. Accessed 07/24/2006.
1 Requests for pretreatment authority and state implementation of pretreatment programs are covered by a separate ICR (OMB No. 2040-0009).
2 All delegated states, tribes, and U.S. territories will henceforth be referred to as states.
3 As discussed previously, Federally Recognized American Indian Tribes are considered states in this ICR. The burden and costs will be included in the total burden and costs for this ICR.
4 The descriptions of the inspections are taken from U.S. Environmental Protection Agency, Office of Enforcement and Compliance Assurance, NPDES Compliance Inspection Manual, July 2004.
5 As discussed above, states are not required to use these forms. However, the federal burden is not likely to depend greatly on the format in which results are reported. Therefore, for simplicity, it is assumed that states use these forms.
6 As discussed in 4(a), this ICR assumes that an average of 46 states, tribes, or U.S. territories will have NPDES programs. Thus, 572 states, tribes, and U.S. territories will not have programs.
7 The goal of the new data system (see section 5(b)) ICIS-NPDES is to maintain the data necessary to provide for required management and oversight of the NPDES program and produce the QNCR. It is too early to quantify the impacts that ICIS will have on the burden for these activities, but as more states migrate from PCS to ICIS and those states in ICIS use the system efficiently, there should be significant burden reductions for some of the NPDES program maintenance activities.
8 Source: U.S. Office of Personnel Management, 2006 General Schedule.
File Type | application/msword |
File Title | INFORMATION COLLECTION REQUEST: |
Author | Alejandro Escobar |
Last Modified By | MDSADM10 |
File Modified | 2006-11-30 |
File Created | 2006-11-09 |