In accordance
with 5 CFR 1320, OMB is withholding approval of this information
collection. Prior to the publication of the final rule, the agency
must provide to OMB a summary of all comments pertaining to the
information collection burden imposed by this rule and any changes
made in response to these comments.
Inventory as of this Action
Requested
Previously Approved
36 Months From Approved
0
0
0
0
0
0
0
0
0
FERC is implementing the Electricity
Modernization Act of 2005 which added a new section 215 to the
Federal Power Act. FERC is proposing to approve 83 of 107 proposed
Reliability Standards, including six of the eight regional
differences, and the Glossary of Terms Used in Reliability
Standards developed by the North American Electric Reliability
Council, on behalf of its wholly-owned subsidiary, the North
American Electric Reliability Corporation (NERC), which FERC
certified as the Electric Reliability Organization (ERO)
responsible for developing and enforcing mandatory reliability
standards. Bulk-Power System means facilities and control systems
necessary for operating an interconnected electric energy
transmission network and electric energy from generating facilities
needed to maintain transmission system reliability.
On August 8, 2005, EPAct was
enacted into law. Section 215 of the FPA provides for a system of
mandatory, enforceable Reliability Standards. Under the new
electric power reliability system enacted by the Congress, the
United States will no longer rely on voluntary compliance by
participants in the electric industry with industry reliability
requirements for operating and planning the Bulk-Power System.
Congress directed the development of mandatory,
Commission-approved, enforceable electricity Reliability Standards.
The Commission believes that, to achieve this goal, it is necessary
to have a strong ERO that promotes excellence in the development
and enforcement of Reliability Standards. The Commission believes
that these Reliability Standards will form a solid foundation on
which to develop and maintain the reliability of the North American
Bulk-Power System.
$0
No
No
Uncollected
Uncollected
Uncollected
Uncollected
Robert Snow, 202 502-6716
robert.snow@ferc.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.