PROBLEM AREA DESCRIPTION FORMS (PAD) - OSM 76
U.S. Department of the Interior
Office of Surface Mining Reclamation and Enforcement
ABANDONED MINE LAND
PROBLEM AREA DESCRIPTION
OMB NO. 1029-0087 Expires: 3/31/2007
A. Reason for Entering Information into the AML Inventory
NEW PROBLEM AREA (PA)/REVISED BOUNDARY |
|
1. New PA; then enter
2. State/Tribe
|
3 . PA Number
4 . PA Name |
NEW OR REVISED PROGRAM INFORMATION |
|||||
5. Check the program area for which data is provided. |
|
||||
(SGA)
(SGB)
(SGC)
(SGD)
(SGE)
(SEA)
(RUA)
(FRA)
(RMA)
(CIA) |
|
Pre-SMCRA Coal (P1,P2,P3) State/Tribe Program Pre-SMCRA Coal (P3 Only) State/Tribe Program Pre-SMCRA Coal (P4) State/Tribe Program Pre-SMCRA Coal (P5) State/Tribe Program Pre-SMCRA Coal (Research--Old P4) State/Tribe Program State Emergency Program
RAMP
FRP Non emergency Remining
Coal Interim Site Funding |
(CSA)
(AMA)
(PVA)
(NCA)
(NCF)
(CLA)
(WCA)
(ENH)
(SSA)
|
|
Coal Insolvent Surety Site Funding
Acid Mine Drainage Plan
Other (P1,P2,P3)
Non-Coal (P1,P2,P3)
Non-Coal Sec. 411(f)
Appalachian Clean Streams Initiative
Watershed Cooperative Agreement Program
Enhanced AML Rule Projects
10% set aside
|
B. GENERAL INFORMATION
6. Planning Unit (PU) Number:
7. PU Name:
8 . Date Prepared: 9 . Prepared by: 1 0. Telephone Number: 1 1. County: 1 2. FIPS Code:
|
13. Congressional District:
14. Primary Quad:
15. Coordinates: Latitude: ___o ___= ___@ Longitude: o = @
16. Type of Mining (S,U,B,P,) (S) Surface, (U) Underground, (B) Both, (P) Processing |
C. SURFACE OWNER
17. For applicable owner(s), indicate percentage (%) of ownership, to the nearest whole number, based on acreage of affected area. Total percentage indicated must equal 100%.
(O-PV)
(O-ST)
(O-IN)
(O-NA) |
|
% Private
% State/Local Government
% Tribal Lands
% National Park Service |
(O-BLM)
(O-OFS)
(O-OF) |
|
% Bur. of Land Mgmt.
% U.S. Forest Service
% Other Federal |
D. NON-COAL: TYPE OF MINERAL/ORE
18. Select (x) type(s) of previous mineral/ore mining. Identify keyword(s) and complete cost/unit information (Question 19 for P1, Question 20 for P2, or Question 21 for P3).
Bentonite Cinnabar Clay Copper Feldspar Fluorite |
___ ___ ___ ___ ___ ___ |
Gold Graphite Iron Lead Limestone Marble |
___ ___ ___ ___ ___ ___ |
Phosphate Platinum Sand & Gravel Shale Silver
|
____ ____ ____ ____ ____ ____ |
Sulphur Tungsten Uranium Vermiculite Zinc Other |
____ ____ ____ ____ ____
|
E. COST/UNIT INFORMATION
KEY TO KEYWORDS--PRIORITY 1 AND PRIORITY 2
KEYWORD |
WORK UNITS |
||
Code |
Description |
English |
Metric |
CS CSL DH DI DPE DS GHE UMF HEF HWB IRW P PWAI PWHC S SB VO |
Clogged Streams Clogged Stream Lands Dangerous Highwalls Dangerous Impoundments Dangerous Piles and Embankments Dangerous Slides Gases: Hazardous/Explosive Underground Mine Fires Hazardous Equip & Facilities Hazardous Water Bodies Industrial/Residential Waste Portals Polluted Water: Agricultural & Industrial Polluted Water: Human Consumption Subsidence Surface Burning Vertical Openings |
Miles Acres Feet Count Acres Acres Count Acres Count Count Acres Count Count Count Acres Acres Count |
Kilometers Hectares Meters Count Hectares Hectares Count Hectares Count Count Hectares Count Count Count Hectares Hectares Count |
Use of Multiple Funding Resources for AML Reclamation-- Multiple resources are sometimes used to reclaim AML problems. If more than one resource is used, you must answer question 19 and/or 20 for each resource. The PAD will identify the primary funding source and all other resources should be listed separately on the same PAD (will require duplicate copies of questions 19 and/or 20).
Other resources can include, but are not limited to:
Other federal agencies such as the Bureau of Land Management, National Park Service, or U.S. Forest Service;
Other State, Tribal, or local government organization’s non-OSM funding;
Fishing or recreation organizations;
Watershed/environmental organizations;
In-kind services provided by private companies or various organizations;
Other OSM funding sources, e.g., Appalachian Cleans Stream Initiative (CLA) projects may be partially funded with Acid Mine Drainage Plan (AMA) funds. These should be shown as separate funding sources.
Net proceeds from the sale of coal mined Aincidental@ to the AML project, e.g., if projects carried out under the February 12, 1999, AEnhancing AML Reclamation@ rule generate money from the sale of coal mined incidental to the AML project, the net proceeds are applied to the project funding and are shown as a separate funding source.
Use your best judgment to allocate costs by problem type to each resource. Often these will be very rough estimates until the reclamation is completed.
E. COST/UNIT INFORMATION (Continued)
PRIORITY 1 PROBLEMS
19. Check box to indicate if this entry is initial data or an updated/revised change or an updated/revised total.
INITIAL DATA UPDATED/REVISED CHANGE UPDATED/REVISED TOTAL (Cannot be used for reclamation completed after
March 31, 2001.)
19a. Are non-Fund resources being used?
NO If YES, see Chapter 2 Part E for instructions.
YES The information in this table must be entered into AMLIS for each non-AML Fund source.
Distribute the cost among the identified work problems by units and cost. Round units to one decimal place. Round dollar values to nearest whole dollar. Also, circle the appropriate type of measure--metric or English--used for each keyword unit. If English measure is used, AMLIS will convert it to metric.
|
UNFUNDED PORTION |
FUNDED PORTION |
COMPLETED PORTION (See note below)
|
|||||||
Problem |
No. Of Units English Metric |
Estimated Cost |
No. Of Units English Metric |
Funded Cost |
No. Of Units English Metric |
Completed Cost |
Completion Date (MM/YY) |
|||
CS |
Mi |
Km |
|
Mi |
Km |
|
Mi |
Km |
|
|
CSL |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
DH |
Ft |
m |
|
Ft |
m |
|
Ft |
m |
|
|
DI |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
DPE |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
DS |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
GHE |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
UMF |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
HWB |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
IRW |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
P |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
PWAI |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
PWHC |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
S |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
SB |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
VO |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
Completions Note: Because a date must be associated with problems completed after March 31, 2001, it is recommended that the actual completed units and costs associated with the date be entered into AMLIS instead of the revised cumulative totals. While you may still enter revised cumulative totals, you can no longer enter cumulative values for units completed in more than one month except when entering information about units completed prior to March 31, 2001 you may enter one date for all units being entered even if they were completed on multiple dates prior to March 31, 2001 as AMLIS treats all dates on or before March 31, 2001 as March 2001.
PRIORITY 2 PROBLEMS
20. Check box to indicate if this entry is initial data or an updated/revised change or an updated/revised total.
INITIAL DATA UPDATED/REVISED CHANGE UPDATED/REVISED TOTAL (Cannot be used for reclamation completed after
March 31, 2001.)
20a. Are non-Fund resources being used?
NO If YES, see Chapter 2 Part E for instructions.
YES The information in this table must be entered into AMLIS for each non-AML Fund source.
Distribute the cost among the identified work problems by units and cost. Round units to one decimal place. Round dollar values to nearest whole dollar. Also, circle the appropriate type of measure--metric or English--used for each keyword unit. If English measure is used, AMLIS will convert it to metric.
|
UNFUNDED PORTION |
FUNDED PORTION |
COMPLETED PORTION (See Note below)
|
|||||||
Problem |
No. Of Units English Metric |
Estimated Cost |
No. Of Units English Metric |
Funded Cost |
No. Of Units English Metric |
Completed Cost |
Completion Date (MM/YY) |
|||
CS |
Mi |
Km |
|
Mi |
Km |
|
Mi |
Km |
|
|
CSL |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
DH |
Ft |
m |
|
Ft |
m |
|
Ft |
m |
|
|
DI |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
DPE |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
DS |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
GHE |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
UMF |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
HEF |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
HWB |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
IRW |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
P |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
PWAI |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
PWHC |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
S |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
SB |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
VO |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
Completions Note: Because a date must be associated with problems completed after March 31, 2001, it is recommended that the actual completed units and costs associated with the date be entered into AMLIS instead of the revised cumulative totals. While you may still enter revised cumulative totals, you can no longer enter cumulative values for units completed in more than one month except when entering information about units completed prior to March 31, 2001 you may enter one date for all units being entered even if they were completed on multiple dates prior to March 31, 2001 as AMLIS treats all dates on or before March 31, 2001 as March 2001.
E. COST/UNIT INFORMATION (Continued)
KEY TO KEYWORDS-- PRIORITY 3
KEYWORD |
|
WORK UNITS |
|
Code |
Description |
English |
Metric |
SA BE PI GO SL HR MO SP H EF DP WA O |
Spoil Area Bench Pits Gobs Slurry Haul Road Mine Opening Slump Highwall Equipment/Facility Industrial/Residential Waste Water Problems Other |
Acre Acre Acre Acre Acre Acre Count Acre Feet Count Acre Gallons
|
Hectare Hectare Hectare Hectare Hectare Hectare Count Hectare Meter Count Hectare Liter |
Use of Multiple Resources for AML Reclamation. Multiple resources are sometimes used to reclaim AML problems. If more than one resource is used, you must answer question 21 for each source. The PAD will identify the primary funding source and all other resources should be listed separately on the same PAD.
Other resources can include, but are not limited to:
Other federal agencies such as the Bureau of Land Management, National Park Service, or U.S. Forest Service;
Other State, Tribal, or local government organization’s non-OSM funding;
Fishing or recreation organizations;
Watershed/environmental organizations;
In-kind services provided by private companies or various organizations;
Other OSM funding sources;
Net proceeds from the sale of coal mined Aincidental@ to the AML project, e.g., if projects carried out under the February 12, 1999, COST/UNIT INFORMATION (continued)
AEnhancing AML Reclamation@ rule generate money from the sale of coal mined incidental to the AML project, the net proceeds are applied to the project funding and are shown as a separate funding source.
Use your best judgment to allocate costs by problem type to each resource. Often these will be very rough estimates until the reclamation is completed.
PRIORITY 3 PROBLEMS
21. Check box to indicate if this entry is initial data, an updated/revised change, or an updated/revised total.
INITIAL DATA UPDATED/REVISED CHANGE UPDATED/REVISED TOTAL (Cannot be used for reclamation completed after
March 31, 2001.)
21a. Are non-Fund resources being used.
NO If YES, see Chapter 2 Part E for instructions.
YES The information in this table must be entered into AMLIS for each non-AML Fund source. Distribute the cost among the identified work problems by units and cost. Round units to one decimal place. Round dollar values to nearest whole dollar. Also, circle the appropriate type of measure--metric or English--used for each keyword unit. If English measure is used, AMLIS will convert it to metric.
|
UNFUNDED PORTION |
FUNDED PORTION |
COMPLETED PORTION (See note below) |
|
||||||
Prob. Type |
No. of Units |
Estimated Cost |
No. of Units |
Funded Cost |
No. of Units |
Completed Cost |
Completion Date (MM/YY) |
|||
English |
Metric |
English |
Metric |
English |
Metric |
|||||
SA |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
BE |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
PI |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
GO |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
SL |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
HR |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
MO |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
SP |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
H |
Ft |
m |
|
Ft |
m |
|
Ft |
m |
|
|
EF |
Ct |
Ct |
|
Ct |
Ct |
|
Ct |
Ct |
|
|
DP |
Ac |
Ha |
|
Ac |
Ha |
|
Ac |
Ha |
|
|
WA |
Gal |
Liter |
|
Gal |
Liter |
|
Gal |
Liter |
|
|
O |
|
|
|
|
|
|
|
|
Completions Note: Because a date must be associated with problems completed after March 31, 2001, it is recommended that the actual completed units and costs associated with the date be entered into AMLIS instead of the revised cumulative totals. While you may still enter revised cumulative totals, you can no longer enter cumulative values for units completed in more than one month except when entering information about units completed prior to March 31, 2001 you may enter one date for all units being entered even if they were completed on multiple dates prior to March 31, 2001 as AMLIS treats all dates on or before March 31, 2001 as March 2001.
KEY TO KEYWORDS-- PRIORITY 4, 5, and 411(f)
PRIORITY 4, 5 and 411(f) PROBLEMS
|
PROBLEM TYPE |
WORK UNITS |
|
Code
P4 COAL P4 COAL P4 COAL
P5 COAL P5 COAL P5 COAL
411(f) 411(f) 411(f) 411(f) 411(f) 411(f) |
Description
RCF Recreational Facilities CNF Conservation Facilities ROD Roads
OSB Open Space Benefits RCT Recreation Purpose HST Historic Purpose
UTL Public Utilities STR Public (Infra) Structure ROD Roads RCF Recreational Facilities CNF Conservation facilities O Other |
English
Count Count Feet
Acres Acres Acres
Count Count Feet Count Count Count
|
Metric
Count Count Meters
Hectares Hectares Hectares
Count Count Meters Count Count Count |
E. COST/UNIT INFORMATION (continued)
PRIORITY 4, 5, AND 411(f) PROBLEMS
22. Check box to indicate if this entry is initial data, an updated/revised change or an updated/revised total.
INITIAL DATA UPDATED/REVISED CHANGE UPDATED/REVISED TOTAL (Cannot be used for reclamation completed after
March 31, 2001.)
22a. Are non-Fund resources being used.
NO If YES, see Chapter 2 Part E for instructions.
YES The information in this table must be entered into AMLIS for each non-AML Fund source. Distribute the cost among the identified work problems by units and cost. Rounds units to one decimal place. Round dollar values to nearest whole dollar. Also, circle the appropriate type of measure--metric or English--used for each keyword unit. If English measure is used, AMLIS will convert it to metric.
Priority |
Prob. Type |
No. of Units |
Cost (See note below) |
Completion Date (MM/YY) |
|
English |
Metric |
||||
P4 COAL |
UTL |
Ct |
Ct |
|
|
P4 COAL |
STR |
Ct |
Ct |
|
|
P4 COAL |
ROD |
Ft |
m |
|
|
P4 COAL |
RCF |
Ct |
Ct |
|
|
P4 COAL |
CNF |
Ct |
Ct |
|
|
P5 COAL |
RCT |
Ac |
Ha |
|
|
P5 COAL |
HST |
Ac |
Ha |
|
|
P5 COAL |
CNP |
Ac |
Ha |
|
|
P5 COAL |
RCM |
Ac |
Ha |
|
|
P5 COAL |
OSB |
Ac |
Ha |
|
|
411(f) |
UTL |
Ct |
Ct |
|
|
411(f) |
STR |
Ct |
Ct |
|
|
411(f) |
ROD |
Ft |
m |
|
|
411(f) |
RCF |
Ct |
Ct |
|
|
411(f) |
CNF |
Ct |
Ct |
|
|
411(f) |
O |
|
|
|
|
Completions Note: Because a date must be associated with problems completed after March 31, 2001, it is recommended that the actual completed units and costs associated with the date be entered into AMLIS instead of the revised cumulative totals. While you may still enter revised cumulative totals, you can no longer enter cumulative values for units completed in more than one month except when entering information about units completed prior to March 31, 2001 you may enter one date for all units being entered even if they were completed on multiple dates prior to March 31, 2001 as AMLIS treats all dates on or before March 31, 2001 as March 2001.
PAPERWORK REDUCTION STATEMENT
The Paperwork Reduction Act of 1995 (44 U.S.C. 3501) requires us to inform you that: Federal Agencies may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. This information is being collected in order to update the abandoned mine lands inventory system. This information will be used to ensure that the most serious problem areas are selected for reclamation through apportionment of funds to States and Tribes. The obligation to respond is required to obtain a benefit.
Public reporting burden for this form is estimated to average 2 hours per response to update the form and 4 hours for each new submission, including time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate or any other aspect of this form to the Information Collection Clearance Officer, Office of Surface Mining Reclamation and Enforcement, Room 210 SIB, 1951 Constitution Ave, NW, Washington, D.C. 20240.
AML
Inventory Manual
File Type | application/msword |
File Title | PROBLEM AREA DESCRIPTION FORMS (PAD) - OSM 76 |
Author | Office of Surface Mining |
Last Modified By | jtreleas |
File Modified | 2005-01-11 |
File Created | 2004-01-06 |