Approved
consistent with clarifications in DOL memos of 10-4-01. In its next
submission OSHA should detail plans to eliminate the requirement
for marking the equipment with load ratings or shall include a
burden estimate for this requirement.
Inventory as of this Action
Requested
Previously Approved
12/31/2004
12/31/2004
10/31/2001
280,000
0
46,722
22,400
0
7,787
0
0
0
Construction firms engaged in the
erection of concrete formwork are required to have a copy of the
plans or drawing at the jobsite for use by the contractor when
erecting the formwork. Failure to follow drawing could result in a
collapse.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.