This information
collection is approved for three years subject to the following two
conditins: 1. The rough draft copy of the form and instructions
that was enclos in the clearance package sent to OMB on 5/29/92 is
professionally re-typeset in the FCC's forms processing facility or
by any other mean necessary. 2. During re-typesetting, the error on
page one of the form (referrin the applicant to instruction D
instead of instruction C for filing inf mation) is corrected.
Inventory as of this Action
Requested
Previously Approved
06/30/1995
06/30/1995
08/31/1992
810
0
933
67,481
0
74,640
0
0
0
FCC 315 IS REQUIRED TO BE FILED WHEN
APPLYING FOR CONSENT TO TRANSFER OF CONTROL OF CORPORATION HOLDING
A BROADCAST STATION CONSTRUCTION PERMIT OR LICENSE. THE DATA IS
USED BY FCC STAFF TO DETERMINE WHETHER TRANSFEREE MEETS BASIC
STATUTORY REQUIREMENTS TO BECOME A COMMISSION PERMITTEE OR
LICENSEE.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.